| number = ML19224D752
| number = ML19224D752
| issue date = 05/17/1979
| issue date = 05/17/1979
| title = Responds to NRC 790420 Ltr Re Violations Noted in IE Insp Repts 50-454/79-06 & 50-455/79-06.Corrective Actions:Storage Surveillance Increased
| title = Responds to NRC Re Violations Noted in IE Insp Repts 50-454/79-06 & 50-455/79-06.Corrective Actions:Storage Surveillance Increased
| author name = Reed C
| author name = Reed C
| author affiliation = COMMONWEALTH EDISON CO.
| author affiliation = COMMONWEALTH EDISON CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7907160273
| document report number = NUDOCS 7907160273
| title reference date = 04-20-1979
| package number = ML19224D750
| package number = ML19224D750
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:Commonwealth Edison g           One First National Plaza. Chicago llhnots Address Reply to' Post Othcc Box 767 Chicago. liiinois 60690 May 17, 1979 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U$S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois             60137
{{#Wiki_filter:Commonwealth Edison g
One First National Plaza. Chicago llhnots Address Reply to' Post Othcc Box 767 Chicago. liiinois 60690 May 17, 1979 Mr. James G.
Keppler, Director Directorate of Inspection and Enforcement - Region III U$S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137


==Subject:==
==Subject:==
Byron Station Units 1 and 2 Responce to IE Inspection Report Nos. 50-454/79-06 and 50-455/79-06 NRC Docket Nos. 50-455 and 50-436 Reference (a) :         April 20, 1979 letter from G. Fiorelli to Byron Lee, Jr. transmitting _IE_ _
Byron Station Units 1 and 2 Responce to IE Inspection Report Nos. 50-454/79-06 and 50-455/79-06 NRC Docket Nos. 50-455 and 50-436 Reference (a) :
Inspection Report Nos. 50-454/79-06 and 50-455/79-06                   '-    --
{{letter dated|date=April 20, 1979|text=April 20, 1979 letter}} from G. Fiorelli to Byron Lee, Jr. transmitting _IE_ _
Inspection Report Nos. 50-454/79-06 and 50-455/79-06


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
An inspection was conducted by Messrs. J. E.
An inspection was conducted by Messrs. J. E.
Kor21in and E. J. Gallagher of your office on April 4-11, 1979 of activities at Byron Station Units 1 and 2. As indicated in Reference (a), during this inspection certain activities appeared to be in noncompliance with NRC require-ments. Ccanmonwealth Edison Company's response to the item of noncompliance is contained in Attachment A to this letter.
Kor21in and E. J. Gallagher of your office on April 4-11, 1979 of activities at Byron Station Units 1 and 2.
As indicated in Reference (a), during this inspection certain activities appeared to be in noncompliance with NRC require-ments.
Ccanmonwealth Edison Company's response to the item of noncompliance is contained in Attachment A to this letter.
Please address any questions that you might have on this matter to this office.
Please address any questions that you might have on this matter to this office.
Very truly yours,
Very truly yours,
                                                            ,f 9mf Cordell Reed Assistant Vice-President attachment 2 2 1979 g
,f 9mf Cordell Reed Assistant Vice-President attachment 2 2 1979 g
7007160 27,3                                                               ?; a.,uq .4-
7007160 27,3
?; a., q
.4-u


ATTACHMEST A NRC Docket Nos. 50-454/455 INFRACTION (79-02-01), ,
ATTACHMEST A NRC Docket Nos. 50-454/455 INFRACTION (79-02-01),
10 CII, Appendix B, Criterion XIII, states, in part, that "Meatures shall be established to control the hancling, storage, shipping, cleaning and preservation of material e.' equipment.... to prevent damage or deterioration".
10 CII, Appendix B, Criterion XIII, states, in part, that "Meatures shall be established to control the hancling, storage, shipping, cleaning and preservation of material e.' equipment.... to prevent damage or deterioration".
Byron Topical Report No. CE-1-A commits Commonwealth Edison to the QA Requirements of WASH 1309, " Guidance on Quality
Byron Topical Report No. CE-1-A commits Commonwealth Edison to the QA Requirements of WASH 1309, " Guidance on Quality
  - Assurance Require.nents during the Construction Phase of Nuclear Power Plants", and through WASH 1309 to the require-ments of ANSI N45.2.2.
- Assurance Require.nents during the Construction Phase of Nuclear Power Plants", and through WASH 1309 to the require-ments of ANSI N45.2.2.
ANSI N45.2.2, Section 6.1.2(4), states, in part. " Items shall be stored on cribbing...." Section 3.5.1 of AN51 N45.2.2 states, in part, " Caps and p to protect.... weld end preparations,1,ugs
ANSI N45.2.2, Section 6.1.2(4), states, in part. " Items shall be stored on cribbing...." Section 3.5.1 of AN51 weld end preparations,1,ugs shall be used....
                                            .      shall 6.4.2(1)
" Caps and p N45.2.2 states, in part, Section 6.4.2(1) of to protect....
Section  be used....
ANSI N45.2.2 states, in
of ANSI N45.2.2 states, in         " Items in storage shall have all.... closures intact"part,Section 6.5 of ANSI N45.2.2 states, in part, " Items released from storage.... shall be inspected and cared for in accordance with the requirements of Section 6 of this standard......".
" Items in storage shall have all.... closures intact"part,Section 6.5 of ANSI N45.2.2 states, in part, " Items released from storage.... shall be inspected and cared for in accordance with the requirements of Section 6 of this standard......".
Contrarv to the above, on April 4,   1979, at Level 365 near coordinates M-11 in the Auxiliary Building, the inspec-tor observed twelve containment piping penetration assemblies which were improperly stored. The twelve assemblies were not on dunnage. On the three largest assemblies, the flued head weld prep areas were not protected, and the assemblies were supported on the concrete floor by the edges of the weld prep areas.
Contrarv to the above, on April 4, 1979, at Level 365 near coordinates M-11 in the Auxiliary Building, the inspec-tor observed twelve containment piping penetration assemblies which were improperly stored.
The twelve assemblies were not on dunnage.
On the three largest assemblies, the flued head weld prep areas were not protected, and the assemblies were supported on the concrete floor by the edges of the weld prep areas.
CORRECTIVE ACTION TAFTN AND RESULTS ACHIEVED:
CORRECTIVE ACTION TAFTN AND RESULTS ACHIEVED:
The subject items and storage conditions were brought into compliance on April 6, 1979 with Commonwealth Edison storage criteria, curveillance criteria and procedures for storage and surveillance of items until installation. In addition, commonwealth Edison has taken action to increase the frequency of surveillance in order to provide for more timely identification and corrective action with regard to such storage conditions.
The subject items and storage conditions were brought into compliance on April 6, 1979 with Commonwealth Edison storage criteria, curveillance criteria and procedures for storage and surveillance of items until installation.
In addition, commonwealth Edison has taken action to increase the frequency of surveillance in order to provide for more timely identification and corrective action with regard to such storage conditions.


      .                                          NRC Docket Nos. 50-454/455 I -                                 .
NRC Docket Nos. 50-454/455 I -
CORRECTIVE ACTION Ti TN TO AVOID FURTHER NONCOMPLIANCE Comraonwcalth Edison Company is increasing its delegated contractor's quality control staff and increasing its surveillance activities of items stored throughout the plant.
CORRECTIVE ACTION Ti TN TO AVOID FURTHER NONCOMPLIANCE Comraonwcalth Edison Company is increasing its delegated contractor's quality control staff and increasing its surveillance activities of items stored throughout the plant.
DATE WHEr; FULL COMPLIANCE WILL BE ACHIEVED:
DATE WHEr; FULL COMPLIANCE WILL BE ACHIEVED:
June 15, 1979
June 15, 1979
                        /
/
e j' /f       e J .11     J
e j' /f e
        --.                                        ..  --              __    .}}
J.11 J
.}}

Latest revision as of 15:52, 4 January 2025

Responds to NRC Re Violations Noted in IE Insp Repts 50-454/79-06 & 50-455/79-06.Corrective Actions:Storage Surveillance Increased
ML19224D752
Person / Time
Site: Byron  
Issue date: 05/17/1979
From: Reed C
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19224D750 List:
References
NUDOCS 7907160273
Download: ML19224D752 (3)


Text

Commonwealth Edison g

One First National Plaza. Chicago llhnots Address Reply to' Post Othcc Box 767 Chicago. liiinois 60690 May 17, 1979 Mr. James G.

Keppler, Director Directorate of Inspection and Enforcement - Region III U$S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Byron Station Units 1 and 2 Responce to IE Inspection Report Nos. 50-454/79-06 and 50-455/79-06 NRC Docket Nos. 50-455 and 50-436 Reference (a) :

April 20, 1979 letter from G. Fiorelli to Byron Lee, Jr. transmitting _IE_ _

Inspection Report Nos. 50-454/79-06 and 50-455/79-06

Dear Mr. Keppler:

An inspection was conducted by Messrs. J. E.

Kor21in and E. J. Gallagher of your office on April 4-11, 1979 of activities at Byron Station Units 1 and 2.

As indicated in Reference (a), during this inspection certain activities appeared to be in noncompliance with NRC require-ments.

Ccanmonwealth Edison Company's response to the item of noncompliance is contained in Attachment A to this letter.

Please address any questions that you might have on this matter to this office.

Very truly yours,

,f 9mf Cordell Reed Assistant Vice-President attachment 2 2 1979 g

7007160 27,3

?; a., q

.4-u

ATTACHMEST A NRC Docket Nos. 50-454/455 INFRACTION (79-02-01),

10 CII, Appendix B, Criterion XIII, states, in part, that "Meatures shall be established to control the hancling, storage, shipping, cleaning and preservation of material e.' equipment.... to prevent damage or deterioration".

Byron Topical Report No. CE-1-A commits Commonwealth Edison to the QA Requirements of WASH 1309, " Guidance on Quality

- Assurance Require.nents during the Construction Phase of Nuclear Power Plants", and through WASH 1309 to the require-ments of ANSI N45.2.2.

ANSI N45.2.2, Section 6.1.2(4), states, in part. " Items shall be stored on cribbing...." Section 3.5.1 of AN51 weld end preparations,1,ugs shall be used....

" Caps and p N45.2.2 states, in part, Section 6.4.2(1) of to protect....

ANSI N45.2.2 states, in

" Items in storage shall have all.... closures intact"part,Section 6.5 of ANSI N45.2.2 states, in part, " Items released from storage.... shall be inspected and cared for in accordance with the requirements of Section 6 of this standard......".

Contrarv to the above, on April 4, 1979, at Level 365 near coordinates M-11 in the Auxiliary Building, the inspec-tor observed twelve containment piping penetration assemblies which were improperly stored.

The twelve assemblies were not on dunnage.

On the three largest assemblies, the flued head weld prep areas were not protected, and the assemblies were supported on the concrete floor by the edges of the weld prep areas.

CORRECTIVE ACTION TAFTN AND RESULTS ACHIEVED:

The subject items and storage conditions were brought into compliance on April 6, 1979 with Commonwealth Edison storage criteria, curveillance criteria and procedures for storage and surveillance of items until installation.

In addition, commonwealth Edison has taken action to increase the frequency of surveillance in order to provide for more timely identification and corrective action with regard to such storage conditions.

NRC Docket Nos. 50-454/455 I -

CORRECTIVE ACTION Ti TN TO AVOID FURTHER NONCOMPLIANCE Comraonwcalth Edison Company is increasing its delegated contractor's quality control staff and increasing its surveillance activities of items stored throughout the plant.

DATE WHEr; FULL COMPLIANCE WILL BE ACHIEVED:

June 15, 1979

/

e j' /f e

J.11 J

.