| Line 1: |
Line 1: |
| {{Adams
| | #REDIRECT [[05000321/LER-1980-006-03, /03L-0:on 800113,one Standby Gas Treatment Sys Rendered Inoperable W/Both Units in Power Operation.Unit Not Proven Operable within Required 4-h.Caused by Inability to Prove Filter Train Operable within 4-h]] |
| | number = ML19296B451
| |
| | issue date = 02/13/1980
| |
| | title = /03L-0:on 800119,during Surveillance of Diesel Generator Manual start,2C Diesel Generator Tripped Before Reaching Rated Voltage.Startup Transformer 2D Out of Svc. Caused by Inadequate Procedure.Procedure Revised
| |
| | author name = Nix R
| |
| | author affiliation = GEORGIA POWER CO.
| |
| | addressee name =
| |
| | addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| |
| | docket = 05000321
| |
| | license number =
| |
| | contact person =
| |
| | document report number = LER-80-006-03L-01, LER-80-6-3L-1, NUDOCS 8002200582
| |
| | package number = ML19296B447
| |
| | document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| |
| | page count = 2
| |
| }}
| |
| {{LER
| |
| | Title = /03L-0:on 800119,during Surveillance of Diesel Generator Manual start,2C Diesel Generator Tripped Before Reaching Rated Voltage.Startup Transformer 2D Out of Svc. Caused by Inadequate Procedure.Procedure Revised
| |
| | Plant =
| |
| | Reporting criterion =
| |
| | Power level =
| |
| | Mode =
| |
| | Docket = 05000321
| |
| | LER year = 1980
| |
| | LER number = 6
| |
| | LER revision = 3
| |
| | Event date =
| |
| | Report date =
| |
| | ENS =
| |
| | abstract =
| |
| }}
| |
| | |
| =text=
| |
| {{#Wiki_filter:uueinte e v em, nerun,
| |
| CoranOt stOcm i 1
| |
| l 1
| |
| 1 1
| |
| l@
| |
| (PLE ASE PRINT OR TYPE ALL REQUIRED INFORP.1ATION) foTil I c
| |
| ^ l E !I lH l2 l@l 010l 0l O! O! 0l O! 0l O! O! 0l@l 4l ll 1l 1l 1l@l l
| |
| a1,8 @
| |
| 7 e o uuNSu COoE i4 is uCe.se suvuR 23 20 uCE~St 11PE.io s7 g
| |
| to. | |
| l@l 0 11 l'1 l9 l8 l0 l@ Ol 2l 1l 3l 8l 0l@
| |
| lolil 5O% l t !@l 015 l 0 l 0 10 l 3 12 1
| |
| 7 8
| |
| C0 61 DOCKET NUVSE R 68 6'J EVENT DA1E 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLt CONSEQUENCES h lo l2l l While perfominn surveillance procedure HNP-2-3801. Diesel Generator 1
| |
| o al l Manual Start, the 2C Diesel Generator trinned before reaching rated volt-l l o 141 [ acc.
| |
| Startup Transformer 2D was out of service at the time, therefore I
| |
| lo lsj l the operability requi rements of Tech Spec Section 3.8.1.1 were not met.
| |
| I lo ic ] l The 2A and IB Diesel Generators and Startup Transformer 2C were operable.
| |
| I o
| |
| 7 l There was no effect on the envirops.
| |
| This is a non-repetitive event.
| |
| 1 O
| |
| O l
| |
| l 7
| |
| 8 9 80 SYST E *.1
| |
| | |
| ==CAUSE==
| |
| CAUSE CON'P.
| |
| VALVE CODE CODE SU8 CODE COYPONENT CODE SU8 CODE SUBCCCE l0l9]
| |
| ( E l E l h l D lh l 7,l h l Z l Z l Z l Z l Z l Z lh [Zj @ W @
| |
| 7 8
| |
| 9 10 11 12 13 18 19 20 SEQUENil AL OCCURRENCE REPORT REVISION gn no EVENT YE AR REPORT NO.
| |
| CODE TYPE N o.
| |
| @,ag9"'
| |
| I 81 o l I-I of ol 6J Ld Iol31 IL l l-l 0l
| |
| _. 21 22 23 24 26 21 28 29 30 31 32 AV.E f AC Cr O PL NT O
| |
| HOURS 5 H IT FOR1 B.
| |
| SL PL E MAN FAC LRER [cJ@LzJ@
| |
| l zi@
| |
| LM@
| |
| lolofoloj l Yl@
| |
| (Yl@
| |
| l Al@
| |
| l F l 0 l 1 l O l@
| |
| 33 34 35 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l The cause of the event was attributed to procedure inadequacy.
| |
| The speed i
| |
| o ji ji j l control potentiometer was not checked for proper adjustment causing the I
| |
| mq j generator not to reach rated speed and voltage. The potentiometer was l
| |
| l 3 l., j ] adjusted aid the procedure revised.
| |
| l i
| |
| 4 l
| |
| l 7
| |
| 8 9 80 ST S
| |
| % POWER OlH ER STATUS blS O RY DISCOVERY DE3CRIPTION l1 ls l l E l@ l 0l 6l 7]@l N'A l
| |
| lCl@[OperatorObservation l
| |
| A 11VITY CCPTENT RE LE ASE D OF HELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE li lC ] [Zj @ l Zl@l NA l
| |
| l NA l
| |
| 7 8 3 10 11 44 45 80 PE RSONNEL E XPOSUHES NUYGER TYPE DESCRIPTION "
| |
| Ld1J l 010 I OJ@LZ_J@l NA l
| |
| S
| |
| ,ERSCNM'IN;uLS NUMMER DESCR'P TION l010101@l NA l
| |
| i a
| |
| 7
| |
| : 8. 9 11 12 80 LO% OF OR D AMAGE TO F ACILITY I
| |
| TYPE
| |
| | |
| ==DESCRIPTION==
| |
| FIIuIl7.l@l NA l
| |
| 7 8 9 10 80 L2Ja] 1s_J@ DESCRIPTION MSUED l.
| |
| NA l
| |
| llllllllll lll 7
| |
| 8 9 to 68 69 80 E 912-367-7781
| |
| ~
| |
| NAME OF PREPAREFt PHONE:
| |
| 8002200 % 2
| |
| | |
| =NARRATIVE=
| |
| REPOPsT Georgia Power Company Plant E.
| |
| I. Ilatch Baxley, Georgia 31513 Reportable Occurrence Report No. 50-366/1980-06.
| |
| On January 16, 1980, surveillance procedure llNP-2-3801, Diesel Generator Manual Start, was being performed on the 2C Diesel Generator with the 2D Startup Transformer out of service. The Diesel Generator tripped prior to reaching rated voltage because normal rotational speed was not obtained within the allowed 12 seconds.
| |
| On the subsequent attempt to perform the procedure, the governor speed control potentiometer was found to be limiting the diesel generator speed to a less than normal rpm.
| |
| The speed control potentiometer was adjusted allowing the diesel generator to obtain normal conditions within 12 seconds.
| |
| The procedure was inadequate because it did not require the operator to check the Generator Not at Sync Speed Alarm. This alarm was added to the governor controls to help eliminate start failures due to misalignment of the speed control. A revision to HNP-2-3S01 has been submitted.
| |
| ~'lhere was not eifect on the environs or the continued norm al plant operation.
| |
| [
| |
| This is a non-repetitive event and no generic problems were found during the investigation.
| |
| ...ue.
| |
| 9
| |
| ,,,-., s.
| |
| t t..~s*.
| |
| s e
| |
| e enem w ees e
| |
| }}
| |
| | |
| {{LER-Nav}}
| |