ML19260D651: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
Line 2: Line 2:
| number = ML19260D651
| number = ML19260D651
| issue date = 01/21/1980
| issue date = 01/21/1980
| title = Advises That 800104 Response to IE Bulletin 79-02,Revision 2,contains Error.Page 5,Paragraph 2,Sentence 1 Should Read: in Aug 1978,App B to Aci 349 Was Published in Aci Journal.
| title = Advises That 800104 Response to IE Bulletin 79-02,Revision 2,contains Error.Page 5,Paragraph 2,Sentence 1 Should Read: in Aug 1978,App B to ACI 349 Was Published in ACI Journal
| author name = Shields S
| author name = Shields S
| author affiliation = PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
| author affiliation = PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Line 18: Line 18:
{{#Wiki_filter:_
{{#Wiki_filter:_
HC 0122804oco
HC 0122804oco
    /
/
j         i
j i
      /
/
4 PUBLIC                                                   January 21, 1980 SERVICE INDIANA
4 PUBLIC January 21, 1980 SERVICE INDIANA
: s. w. shields V,ce President - Electric System Docket Nos.: STN 50-546 STN 50-547 Mr. James G. Keppler, Director                                       Construction U. S. Nuclear Regulatory Connission                                 Permit Nos.: CPP2-170 Region III                                                                         CPPR-171 799 Roosevelt Road Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station, Units 1 6 2 IE Bulletin No. 79-02, Rev. 2
: s. w. shields V,ce President - Electric System Docket Nos.: STN 50-546 STN 50-547 Mr. James G. Keppler, Director Construction U. S. Nuclear Regulatory Connission Permit Nos.: CPP2-170 Region III CPPR-171 799 Roosevelt Road Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station, Units 1 6 2 IE Bulletin No. 79-02, Rev. 2


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
This is to inform you that the first sentence of the second paragraph on page 5 of our January 4, 1980 response to IE Bulletin No. 79-02, Revision 2 should read, "In August, 1978, Appendix B to ACI 349 was published in the ACI Journal".
This is to inform you that the first sentence of the second paragraph on page 5 of our January 4, 1980 response to IE Bulletin No. 79-02, Revision 2 should read, "In August, 1978, Appendix B to ACI 349 was published in the ACI Journal".
Sincerely,
Sincerely,
                                                              /
/
                                                            ,f
/.
                                                      /. /
,f
S. W. Shields TDG:jkw cc:     U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.             20555 E. R. Schweibinz, P.E.
/S. W. Shields TDG:jkw cc:
19 0) 226 J/a b mag 593 1000 East Main street, Plainfield, Indiana 46168             50             317. 839.9611}}
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.
20555 E. R. Schweibinz, P.E.
19 0) 226 J/a b mag 593 1000 East Main street, Plainfield, Indiana 46168 50 317. 839.9611}}

Latest revision as of 12:33, 3 January 2025

Advises That 800104 Response to IE Bulletin 79-02,Revision 2,contains Error.Page 5,Paragraph 2,Sentence 1 Should Read: in Aug 1978,App B to ACI 349 Was Published in ACI Journal
ML19260D651
Person / Time
Site: Marble Hill
Issue date: 01/21/1980
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-02, IEB-79-2, NUDOCS 8002110543
Download: ML19260D651 (1)


Text

_

HC 0122804oco

/

j i

/

4 PUBLIC January 21, 1980 SERVICE INDIANA

s. w. shields V,ce President - Electric System Docket Nos.: STN 50-546 STN 50-547 Mr. James G. Keppler, Director Construction U. S. Nuclear Regulatory Connission Permit Nos.: CPP2-170 Region III CPPR-171 799 Roosevelt Road Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station, Units 1 6 2 IE Bulletin No. 79-02, Rev. 2

Dear Mr. Keppler:

This is to inform you that the first sentence of the second paragraph on page 5 of our January 4, 1980 response to IE Bulletin No. 79-02, Revision 2 should read, "In August, 1978, Appendix B to ACI 349 was published in the ACI Journal".

Sincerely,

/

/.

,f

/S. W. Shields TDG:jkw cc:

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.

20555 E. R. Schweibinz, P.E.

19 0) 226 J/a b mag 593 1000 East Main street, Plainfield, Indiana 46168 50 317. 839.9611