ML19262B569: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7912280475
| document report number = NUDOCS 7912280475
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO,LER), TEXT-SAFETY REPORT
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER), TEXT-SAFETY REPORT
| page count = 1
| page count = 1
}}
}}
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
BOSTON EDISON COMPANY TELECbPY MESSAGE                                   ' '
BOSTON EDISON COMPANY TELECbPY MESSAGE To:
            '215-337-5324 To:
'215-337-5324 Date/ Time: 12/24/79
Telephone Number                                        T Date/ Time: 12/24/79           /
/
E To: Director, Region I                                                       From: Pilgrim Nuclear Power Station M
Telephone Number T
Office of Inspection and Enforcement                                               .RFD #1 Rocky 11111 Road U. S. Nuclear Regulatory Commission                                                  Plymouth, MA 631 Park Avenue                                                                                          02360 King of Prussia, PA 19406 Subj ect: PROMPT REPORTABLE OCCURRENCE                                                                       -
E M
Docket Number 50-293; License DPR-35
To: Director, Region I From:
Office of Inspection and Enforcement Pilgrim Nuclear Power Station U. S. Nuclear Regulatory Commission
.RFD #1 Rocky 11111 Road 631 Park Avenue Plymouth, MA 02360 King of Prussia, PA 19406 Subj ect: PROMPT REPORTABLE OCCURRENCE Docket Number 50-293; License DPR-35
(
(
Assigned LER Number 79-048/01X-0                                         -
Assigned LER Number 79-048/01X-0 chyard 12$olt M,_bacbp bag day w S Mu e su Event
Event


== Description:==
== Description:==
e su        chyard 12$olt M,_bacbp bag day w S Mu because of a failure of the main battery charger en Dec. 23, 1979. At 08 0 Dec. 24, 1979, the backup battery charger tripped and could not be                                       e z' set. This is a limiting condition for operation as addressed in Section 3.9.3.5 of Tech. Specs.
because of a failure of the main battery charger en Dec. 23, 1979. At 08 0 Dec. 24, 1979, the backup battery charger tripped and could not be z' set. This is a limiting e
Cause and Corrective Actionj                           The cause of the Battery Charger Failures is under in-vestigation. A spare battery charger is being brought on site and is expected to be
condition for operation as addressed in Section 3.9.3.5 of Tech. Specs.
                  ~
Cause and Corrective Actionj The cause of the Battery Charger Failures is under in-vestigation. A spare battery charger is being brought on site and is expected to be
~
in service by 1300 Dec. 24,1979.
in service by 1300 Dec. 24,1979.
Facility Status:
Facility Status:
c) Routine Startup                                                                            1904 % Thermal MW g) Shutdown d) Routine Shutdown e) Steady State                     X h) Refueling f) Load Changing                                                                           1) Other j) Not Applicaple A written follow-up report will be sent within two weeks.                                                                              .
1904 % Thermal MW c) Routine Startup d) Routine Shutdown g) Shutdown h) Refueling e) Steady State X
HRC person notified Mr. R. McClintock                                                                   Mr. E. T. Graham Prepared by
: 1) Other f) Load Changing j) Not Applicaple A written follow-up report will be sent within two weeks.
                                                                        ,~
HRC person notified Mr. R. McClintock Prepared by Mr. E. T. Graham
* Q
,~
                                                                                      ~~
P00R BRIGlWl.
P00R BRIGlWl.
                      ^ : .-,
wa m Q
wa m
~~
                                        . r. . .n.. ., , , ,                .    -
^ :.-
Mail (2) copies to:                                         -
: r...n..
Office of Management Information and Program Control                                                                 4 U. S. Nuclear Regulatory Commission
Mail (2) copies to:
* Washington, D.C.               20555
Office of Management Information and Program Control 4
* 7912280
U. S. Nuclear Regulatory Commission Washington, D.C.
                                                                  ,.                    .}}
20555 7912280
.}}

Latest revision as of 09:16, 3 January 2025

RO-79-048 on 791224:backup Battery Charger,In Use Due to Main Battery Charger 791223 Failure,Tripped & Could Not Be Reset.Cause Under Investigation.Spare Battery Charger Will Be in Svc by 791224
ML19262B569
Person / Time
Site: Pilgrim
Issue date: 12/24/1979
From: Graham E
BOSTON EDISON CO.
To:
References
NUDOCS 7912280475
Download: ML19262B569 (1)


Text

.

BOSTON EDISON COMPANY TELECbPY MESSAGE To:

'215-337-5324 Date/ Time: 12/24/79

/

Telephone Number T

E M

To: Director, Region I From:

Office of Inspection and Enforcement Pilgrim Nuclear Power Station U. S. Nuclear Regulatory Commission

.RFD #1 Rocky 11111 Road 631 Park Avenue Plymouth, MA 02360 King of Prussia, PA 19406 Subj ect: PROMPT REPORTABLE OCCURRENCE Docket Number 50-293; License DPR-35

(

Assigned LER Number 79-048/01X-0 chyard 12$olt M,_bacbp bag day w S Mu e su Event

Description:

because of a failure of the main battery charger en Dec. 23, 1979. At 08 0 Dec. 24, 1979, the backup battery charger tripped and could not be z' set. This is a limiting e

condition for operation as addressed in Section 3.9.3.5 of Tech. Specs.

Cause and Corrective Actionj The cause of the Battery Charger Failures is under in-vestigation. A spare battery charger is being brought on site and is expected to be

~

in service by 1300 Dec. 24,1979.

Facility Status:

1904 % Thermal MW c) Routine Startup d) Routine Shutdown g) Shutdown h) Refueling e) Steady State X

1) Other f) Load Changing j) Not Applicaple A written follow-up report will be sent within two weeks.

HRC person notified Mr. R. McClintock Prepared by Mr. E. T. Graham

,~

P00R BRIGlWl.

wa m Q

~~

^ :.-

r...n..

Mail (2) copies to:

Office of Management Information and Program Control 4

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 7912280

.