ML19263D066: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML19263D066 | | number = ML19263D066 | ||
| issue date = 02/14/1979 | | issue date = 02/14/1979 | ||
| title = Responds to NRC | | title = Responds to NRC Re Violations Noted in IE Insp Repts 50-498/78-16 & 50-499/78-16.Corrective Actions: Training Conducted in Housekeeping Insp Procedures,Megger Testing & Warehouse Maint Card Sys | ||
| author name = Turner E | | author name = Turner E | ||
| author affiliation = HOUSTON LIGHTING & POWER CO. | | author affiliation = HOUSTON LIGHTING & POWER CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = ST-HL-AE-324, NUDOCS 7903210201 | | document report number = ST-HL-AE-324, NUDOCS 7903210201 | ||
| title reference date = 01-17-1979 | |||
| package number = ML19263D065 | | package number = ML19263D065 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:j | {{#Wiki_filter:Houston j } | ||
Lighting | |||
& Power Company Electric Tower February 14, 1979 RQ Box 1700 Houston. Texas 77001 ST-IIL-AE-324 SFN: C-0570 b!r. W. C. Seidle, Chief Reactor Construction 6 Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 SUBJEC'I : ADDITIONAL INFOR>lATION FOR NRC INSPECTION REPORT 50-498/78-16 AND 50-499/78-16 FOR THE SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION | |||
==Dear b!r. Seidle:== | ==Dear b!r. Seidle:== | ||
Your letter of January 17, 1979, requested additional information for recurrence control for the three items of noncompliance identified during IE Inspection No. 78-16 at the South Texas Project. The following actions have been implemented to preclude recurrence: | Your letter of January 17, 1979, requested additional information for recurrence control for the three items of noncompliance identified during IE Inspection No. 78-16 at the South Texas Project. The following actions have been implemented to preclude recurrence: | ||
A. Training sessions have been conducted in the use of procedures for housekeeping inspection, the development of inspection acceptance criteria for megger testing, and implementation of the h'arehouse >!aintenance Card system. | A. | ||
B. Regularly scheduled surveillance of these specific activities is performed to verify adherence to procedures. | Training sessions have been conducted in the use of procedures for housekeeping inspection, the development of inspection acceptance criteria for megger testing, and implementation of the h'arehouse >!aintenance Card system. | ||
B. | |||
Regularly scheduled surveillance of these specific activities is performed to verify adherence to procedures. | |||
These actions have been implemented since February 9, 1979. | These actions have been implemented since February 9, 1979. | ||
Very truly yours, DI | Very truly yours, DI E. A. Turner, Vice President Power Plant Construction 6 Technical Services EAT /cas cc: Stessrs. G. | ||
: 51. L. Borchelt (CPL) | h'. Oprea, Jr. | ||
J . W. Bloo re (CPL) | R. L. Ilancock (COA) | ||
: 51. L. Borchelt (CPL) | |||
: 11. L. Peterson (COA) | |||
J. W. Bloo re (CPL) | |||
R. A. Frazar J. B. Poston (CPS) | |||
D. G. Barker R. C. h!ecke (CPS) | |||
C. W. Vincent (BSR) | |||
STP R5!S}} | STP R5!S}} | ||
Latest revision as of 07:52, 3 January 2025
| ML19263D066 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 02/14/1979 |
| From: | Eric Turner HOUSTON LIGHTING & POWER CO. |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19263D065 | List: |
| References | |
| ST-HL-AE-324, NUDOCS 7903210201 | |
| Download: ML19263D066 (1) | |
Text
Houston j }
Lighting
& Power Company Electric Tower February 14, 1979 RQ Box 1700 Houston. Texas 77001 ST-IIL-AE-324 SFN: C-0570 b!r. W. C. Seidle, Chief Reactor Construction 6 Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 SUBJEC'I : ADDITIONAL INFOR>lATION FOR NRC INSPECTION REPORT 50-498/78-16 AND 50-499/78-16 FOR THE SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION
Dear b!r. Seidle:
Your letter of January 17, 1979, requested additional information for recurrence control for the three items of noncompliance identified during IE Inspection No. 78-16 at the South Texas Project. The following actions have been implemented to preclude recurrence:
A.
Training sessions have been conducted in the use of procedures for housekeeping inspection, the development of inspection acceptance criteria for megger testing, and implementation of the h'arehouse >!aintenance Card system.
B.
Regularly scheduled surveillance of these specific activities is performed to verify adherence to procedures.
These actions have been implemented since February 9, 1979.
Very truly yours, DI E. A. Turner, Vice President Power Plant Construction 6 Technical Services EAT /cas cc: Stessrs. G.
h'. Oprea, Jr.
R. L. Ilancock (COA)
- 51. L. Borchelt (CPL)
- 11. L. Peterson (COA)
J. W. Bloo re (CPL)
R. A. Frazar J. B. Poston (CPS)
D. G. Barker R. C. h!ecke (CPS)
C. W. Vincent (BSR)
STP R5!S