| number = ML19263D066
| number = ML19263D066
| issue date = 02/14/1979
| issue date = 02/14/1979
| title = Responds to NRC 790117 Ltr Re Violations Noted in IE Insp Repts 50-498/78-16 & 50-499/78-16.Corrective Actions: Training Conducted in Housekeeping Insp Procedures,Megger Testing & Warehouse Maint Card Sys
| title = Responds to NRC Re Violations Noted in IE Insp Repts 50-498/78-16 & 50-499/78-16.Corrective Actions: Training Conducted in Housekeeping Insp Procedures,Megger Testing & Warehouse Maint Card Sys
| author name = Turner E
| author name = Turner E
| author affiliation = HOUSTON LIGHTING & POWER CO.
| author affiliation = HOUSTON LIGHTING & POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = ST-HL-AE-324, NUDOCS 7903210201
| document report number = ST-HL-AE-324, NUDOCS 7903210201
| title reference date = 01-17-1979
| package number = ML19263D065
| package number = ML19263D065
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:j     Houston
{{#Wiki_filter:Houston j }
    } Lighting
Lighting
      & Power Company Electric Tower                         February 14, 1979 RQ Box 1700 Houston. Texas 77001                   ST-IIL- AE- 324 SFN: C-0570 b!r. W. C. Seidle, Chief Reactor Construction 6 Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 SUBJEC'I : ADDITIONAL INFOR>lATION FOR NRC INSPECTION REPORT 50-498/78-16 AND 50-499/78-16 FOR THE SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION
& Power Company Electric Tower February 14, 1979 RQ Box 1700 Houston. Texas 77001 ST-IIL-AE-324 SFN: C-0570 b!r. W. C. Seidle, Chief Reactor Construction 6 Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 SUBJEC'I : ADDITIONAL INFOR>lATION FOR NRC INSPECTION REPORT 50-498/78-16 AND 50-499/78-16 FOR THE SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION


==Dear b!r. Seidle:==
==Dear b!r. Seidle:==
Your letter of January 17, 1979, requested additional information for recurrence control for the three items of noncompliance identified during IE Inspection No. 78-16 at the South Texas Project. The following actions have been implemented to preclude recurrence:
Your letter of January 17, 1979, requested additional information for recurrence control for the three items of noncompliance identified during IE Inspection No. 78-16 at the South Texas Project. The following actions have been implemented to preclude recurrence:
A. Training sessions have been conducted in the use of procedures for housekeeping inspection, the development of inspection acceptance criteria for megger testing, and implementation of the h'arehouse >!aintenance Card system.
A.
B. Regularly scheduled surveillance of these specific activities is performed to verify adherence to procedures.
Training sessions have been conducted in the use of procedures for housekeeping inspection, the development of inspection acceptance criteria for megger testing, and implementation of the h'arehouse >!aintenance Card system.
B.
Regularly scheduled surveillance of these specific activities is performed to verify adherence to procedures.
These actions have been implemented since February 9, 1979.
These actions have been implemented since February 9, 1979.
Very truly yours, DI                       E. A. Turner, Vice President Power Plant Construction 6 Technical Services EAT /cas cc: Stessrs. G. h'. Oprea, Jr.                 R. L. Ilancock (COA)
Very truly yours, DI E. A. Turner, Vice President Power Plant Construction 6 Technical Services EAT /cas cc: Stessrs. G.
: 51. L. Borchelt (CPL)         11. L. Peterson (COA)
h'. Oprea, Jr.
J . W. Bloo re (CPL)           R. A. Frazar J. B. Poston (CPS)             D. G. Barker R. C. h!ecke (CPS)             C. W. Vincent (BSR)
R. L. Ilancock (COA)
: 51. L. Borchelt (CPL)
: 11. L. Peterson (COA)
J. W. Bloo re (CPL)
R. A. Frazar J. B. Poston (CPS)
D. G. Barker R. C. h!ecke (CPS)
C. W. Vincent (BSR)
STP R5!S}}
STP R5!S}}

Latest revision as of 07:52, 3 January 2025

Responds to NRC Re Violations Noted in IE Insp Repts 50-498/78-16 & 50-499/78-16.Corrective Actions: Training Conducted in Housekeeping Insp Procedures,Megger Testing & Warehouse Maint Card Sys
ML19263D066
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/14/1979
From: Eric Turner
HOUSTON LIGHTING & POWER CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19263D065 List:
References
ST-HL-AE-324, NUDOCS 7903210201
Download: ML19263D066 (1)


Text

Houston j }

Lighting

& Power Company Electric Tower February 14, 1979 RQ Box 1700 Houston. Texas 77001 ST-IIL-AE-324 SFN: C-0570 b!r. W. C. Seidle, Chief Reactor Construction 6 Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 SUBJEC'I : ADDITIONAL INFOR>lATION FOR NRC INSPECTION REPORT 50-498/78-16 AND 50-499/78-16 FOR THE SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

Dear b!r. Seidle:

Your letter of January 17, 1979, requested additional information for recurrence control for the three items of noncompliance identified during IE Inspection No. 78-16 at the South Texas Project. The following actions have been implemented to preclude recurrence:

A.

Training sessions have been conducted in the use of procedures for housekeeping inspection, the development of inspection acceptance criteria for megger testing, and implementation of the h'arehouse >!aintenance Card system.

B.

Regularly scheduled surveillance of these specific activities is performed to verify adherence to procedures.

These actions have been implemented since February 9, 1979.

Very truly yours, DI E. A. Turner, Vice President Power Plant Construction 6 Technical Services EAT /cas cc: Stessrs. G.

h'. Oprea, Jr.

R. L. Ilancock (COA)

51. L. Borchelt (CPL)
11. L. Peterson (COA)

J. W. Bloo re (CPL)

R. A. Frazar J. B. Poston (CPS)

D. G. Barker R. C. h!ecke (CPS)

C. W. Vincent (BSR)

STP R5!S