ML19263E369: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-$
{{#Wiki_filter:-$
POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMBUS CIRCLE     NEW YORK. N. Y.10019 t2121 397 6200 TRUSTEES                                                             GECRGE T. BERRY E E ECLTivE Df RECTOR FREDCRfCK R. CLARK CMalRM AN                                     e                     LEWi$ R. BENNETT GECRGE L. ING ALLS
POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMBUS CIRCLE NEW YORK. N. Y.10019 t2121 397 6200 TRUSTEES GECRGE T. BERRY E E ECLTivE Df RECTOR FREDCRfCK R. CLARK CMalRM AN e
      .......,R...                               p cg,                            .sorsf  aw? E
LEWi$ R. BENNETT
                                                                                    . RECT.R se t RICH ARD M. FLYNN                                 #[                             gw   g', gg   gg, June 7, 1979               ""a"(((k)", , , , , , , ,
.sorsf aw? E se t GECRGE L. ING ALLS p cg,
wiLu Au r. LuDDy JPN-79-31                 THOM AS F. McCR ANN JR.
. RECT.R
CONTROLLER Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.       20555 Attention:     Mr. Thomas A. Ippolito, Chief Operating Reactors Branch No. 3 Division of Operating Reactors
.......,R...
RICH ARD M. FLYNN
#[
gw g', gg gg, June 7, 1979
""a"(((k)"
wiLu Au r. LuDDy JPN-79-31 THOM AS F. McCR ANN JR.
CONTROLLER Director of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 Attention:
Mr. Thomas A.
Ippolito, Chief Operating Reactors Branch No. 3 Division of Operating Reactors


==Subject:==
==Subject:==
James A. Fit: Patrick Nuclear Power Plant Docket No. 50-333 Piping Stress Reanalysis - Plant Shutdown
James A.
Fit: Patrick Nuclear Power Plant Docket No. 50-333 Piping Stress Reanalysis - Plant Shutdown


==Dear Sir:==
==Dear Sir:==
Attached for your information is the weekly report of the status of the Stone & Webster piping reanalysis effort, as of May 25, 1979.
Attached for your information is the weekly report of the status of the Stone & Webster piping reanalysis effort, as of May 25, 1979.
Very truly yours, Paul J. Early Assistant Chief Engineer-Projects 2357 156 ko#\
Very truly yours, Paul J.
g                   k 790613037f                   q
Early Assistant Chief Engineer-Projects 2357 156 ko#\\
k g
790613037f q


JAMES A. FITZPATRICK NUCLEAR POWER PLANT PIPE STRESS REANALYSIS -
JAMES A.
FITZPATRICK NUCLEAR POWER PLANT PIPE STRESS REANALYSIS -
STONE & WEBSTER ENGINEERING CORP.
STONE & WEBSTER ENGINEERING CORP.
STATUS OF WORK AS OF MAY 25, 1979 Piping
STATUS OF WORK AS OF MAY 25, 1979 Piping 1.
: 1. Total number of piping reanalyses to perform.       96
Total number of piping reanalyses to perform.
: 2. Number of reanalyses completed and pipe             65 stresses determined to be within allowable limits.
96 2.
: 3. Number of reanalyses completed and pipe stresses determined to be above allowable             -
Number of reanalyses completed and pipe 65 stresses determined to be within allowable limits.
limits.
3.
Pipe               Containment Supports   Nozzles   Penetrations
Number of reanalyses completed and pipe stresses determined to be above allowable limits.
: 1. Total number of components           1156         81         55 to analyze.
Pipe Containment Supports Nozzles Penetrations 1.
: 2. Number of reanalyses com-               85         5           5 plete and loads determined to be within allowable limits.
Total number of components 1156 81 55 to analyze.
: 3. Number of reanalyses com-plete and loads determined to be above allowable limits.           56         -          -
2.
Estimated date of startup.                                               July 1,   1979 2357 157}}
Number of reanalyses com-85 5
5 plete and loads determined to be within allowable limits.
3.
Number of reanalyses com-plete and loads determined to be above allowable limits.
56 Estimated date of startup.
July 1, 1979 2357 157}}

Latest revision as of 07:39, 3 January 2025

Submits Weekly Rept of Status of S&W Piping Reanalysis Effort,As of 790525
ML19263E369
Person / Time
Site: FitzPatrick 
Issue date: 06/07/1979
From: Early P
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
References
JPN-79-31, NUDOCS 7906130374
Download: ML19263E369 (2)


Text

-$

POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMBUS CIRCLE NEW YORK. N. Y.10019 t2121 397 6200 TRUSTEES GECRGE T. BERRY E E ECLTivE Df RECTOR FREDCRfCK R. CLARK CMalRM AN e

LEWi$ R. BENNETT

.sorsf aw? E se t GECRGE L. ING ALLS p cg,

. RECT.R

.......,R...

RICH ARD M. FLYNN

  1. [

gw g', gg gg, June 7, 1979

""a"(((k)"

wiLu Au r. LuDDy JPN-79-31 THOM AS F. McCR ANN JR.

CONTROLLER Director of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 Attention:

Mr. Thomas A.

Ippolito, Chief Operating Reactors Branch No. 3 Division of Operating Reactors

Subject:

James A.

Fit: Patrick Nuclear Power Plant Docket No. 50-333 Piping Stress Reanalysis - Plant Shutdown

Dear Sir:

Attached for your information is the weekly report of the status of the Stone & Webster piping reanalysis effort, as of May 25, 1979.

Very truly yours, Paul J.

Early Assistant Chief Engineer-Projects 2357 156 ko#\\

k g

790613037f q

JAMES A.

FITZPATRICK NUCLEAR POWER PLANT PIPE STRESS REANALYSIS -

STONE & WEBSTER ENGINEERING CORP.

STATUS OF WORK AS OF MAY 25, 1979 Piping 1.

Total number of piping reanalyses to perform.

96 2.

Number of reanalyses completed and pipe 65 stresses determined to be within allowable limits.

3.

Number of reanalyses completed and pipe stresses determined to be above allowable limits.

Pipe Containment Supports Nozzles Penetrations 1.

Total number of components 1156 81 55 to analyze.

2.

Number of reanalyses com-85 5

5 plete and loads determined to be within allowable limits.

3.

Number of reanalyses com-plete and loads determined to be above allowable limits.

56 Estimated date of startup.

July 1, 1979 2357 157