I                CORRECTED PAGES TO REVISED REPORT ON THE
CORRECTED PAGES TO REVISED REPORT ON THE
,[
,[
REANALYSIS OF SAFETY-RELATED PIPING SYSTEMS SURRY POWER STATION - UNIT 1 VIRGINI A ELECTRIC AND POWER COMPANY t
REANALYSIS OF SAFETY-RELATED PIPING SYSTEMS SURRY POWER STATION - UNIT 1 VIRGINI A ELECTRIC AND POWER COMPANY t
i               1. Section 2, Page 2-2                                                                 Replace page in existing report.
i 1.
: 2. Section 2, Table 2-1, Page 6 of 7                                                   Replace page in existing report.
Section 2, Page 2-2 Replace page in existing report.
3   Sect ion 3, Page 3- I                                                               Replace page in existing report.
2.
: 4. Section -3, Tabic 3-18, Page 2 of 3,                                               Replace page in existing report.
Section 2, Table 2-1, Page 6 of 7 Replace page in existing report.
: 5. Section 3, Table 3-2, Pages 8, 9, 10                                               Replace pages in existing report.
3 Sect ion 3, Page 3-I Replace page in existing report.
4.
Section -3, Tabic 3-18, Page 2 of 3, Replace page in existing report.
5.
Section 3, Table 3-2, Pages 8, 9, 10 Replace pages in existing report.
1 I
1 I
1 4
1 4
i i
i i
I O                 3 gas
I O
                                                                                                                      , _ , _ _ _ , , - . . . , _ _ . . - - - - - , - . . ~ . - . - . , - _ , - - - , - . ,
3 gas
,, -..., _ _.. - - - - -, -.. ~. -. -., - _, - - -, -.,


E
E SURRY POWER STATION, UNIT 1 technique which is always more conservative than the approved SRSS method, and an SRSS technique for inter-modal combination.
  -                                  SURRY POWER STATION, UNIT 1 technique which is always more conservative than the approved SRSS method, and an SRSS technique for inter-modal combination.
Additionally, in some cases, piping is analyzed utilizing amplified response spectra (ARS) that are developed using soil structure interaction techniques (SSI-ARS).
Additionally,     in some cases, piping is analyzed utilizing amplified response spectra (ARS) that are developed using soil structure interaction techniques (SSI-ARS). The resultant stresses and loads are used to evaluate piping, supports, nozzles, and penetrations.     In accordance with the NRC letter af May 25,   1979 to Virginia Electric and Power Company (VEFCO), the seismic inertial stresses typical loads computed using the SSI-ARS have been increased by a factor of 1.5 for the DBE condition.
The resultant stresses and loads are used to evaluate piping, supports, nozzles, and penetrations.
All 63 SHOCK 2 problems have been teanalyzed and approved by S&W Engineering l Assurance or NSC Project Management.               Tatie   2-1 for the Design Basis Earthquake shows the results for these 63 stress problems.           In Table 2-1, the figures for Original Total Stress, at the point of maximum total stress in the pipe,   and Original Seismic Stress,         at the same point, are extracted from Table 3-1 of the " Seismic Design Review Equipment and Piping,           Surry Fever Station," dated September 15, 1971. The original calculations for the seismic design review report are no longer available;         therefore, correlations were made to the original stresses in Table 3-1 on the basis of the MSK's.
In accordance with the NRC letter af May 25, 1979 to Virginia Electric and Power Company (VEFCO), the seismic inertial stresses typical loads computed using the SSI-ARS have been increased by a factor of 1.5 for the DBE condition.
;          In Table 2-1, the columns for New Total Stress, at the point of maximum total stress in the pipe, and New Seismic Stress, at the same point, were taken from 2-2
All 63 SHOCK 2 problems have been teanalyzed and approved by S&W Engineering l Assurance or NSC Project Management.
Tatie 2-1 for the Design Basis Earthquake shows the results for these 63 stress problems.
In Table 2-1, the figures for Original Total Stress, at the point of maximum total stress in the
: pipe, and Original Seismic Stress, at the same point, are extracted from Table 3-1 of the " Seismic Design Review Equipment and Piping, Surry Fever Station," dated September 15, 1971. The original calculations for the seismic design review report are no longer available; therefore, correlations were made to the original stresses in Table 3-1 on the basis of the MSK's.
In Table 2-1, the columns for New Total Stress, at the point of maximum total stress in the pipe, and New Seismic Stress, at the same point, were taken from 2-2


II SURRY POWER STATION, UNIT 1 TAPLE 2-1 (Cont)                                                 -
II SURRY POWER STATION, UNIT 1 TAPLE 2-1 (Cont)
  -                                                                                                                                                        PIPE STRESS REEVALUATION  
PIPE STRESS REEVALUATION  


==SUMMARY==
==SUMMARY==
 
DESIGN BASIS E RTHQUAKE LIgend:
DESIGN BASIS E RTHQUAKE
-s NA : Not Available l Allowable Stress : 1.8 S h l N:w Total Stress : SLP + SDW + 1.5 SDBEI + SDBEA (f or SSI/ARS) l New Seismic = 1.5 SDBE1 (for SSI/ARS) l New Total Stress : Sgp + SDW + SDBEI
  -s           LIgend:                                                                                                                            .
NA : Not Available l Allowable Stress : 1.8 S h l N:w Total Stress : SLP + SDW + 1.5 SDBEI + SDBEA (f or SSI/ARS) l New Seismic = 1.5 SDBE1 (for SSI/ARS) l New Total Stress : Sgp + SDW + SDBEI
* SDBEA ( riginal ARS) l New Seismic : SDBEL ( riginal ARS)
* SDBEA ( riginal ARS) l New Seismic : SDBEL ( riginal ARS)
NOTE:
NOTE:
  *'          The    original totalM and original seismicMThestresses                                                                                                                    shown in Table 2-1 were computed using new total and new seismic stresses were SHOCK 2 for the original design conditions.                                                                                                                                         in some cases, different ARS's computed by the NUPIPE program More                                                                                                          usingimportantly, different massthe models   and, were based on field-verified reanalyses than the original calculations.                                                                                                                  which, in some cases, differ significantly from the original
stresses shown in Table 2-1 were computed using original totalM and original seismicMThe new total and new seismic stresses were The SHOCK 2 for the original design conditions.
  *"          piping configurationsFor this reason, the new stresses and the originalthe same physical                                             in 1979,                                            stresses in Table 2-1 design conditions.                                                                                                                                                                           conditions.
in some cases, different ARS's by the NUPIPE program using different mass models and, the reanalyses were based on field-verified computed which, in some cases, differ significantly from the original More importantly, than the original calculations.
are not comparable, as they do not necessarily represent J                                                                                                                                                                                          1, 1979 table and table submitted DESCRIPTIVE NOTES (To explain differences between the August in this report):                                                                                         --
stresses in Table 2-1 in 1979, piping configurationsFor this reason, the new stresses and the originalthe same physical conditions.
    --          1. The    high stress point occurs on a portion of the piping with a lower temperature therefore the higher allowable.
design conditions.
This supports were added or modified to reduce loads on other existing supports.
are not comparable, as they do not necessarily represent 1, 1979 table and table submitted J
s-
DESCRIPTIVE NOTES (To explain differences between the August in this report):
: 2. Pipe stress analysis performed since the August 1, 1979 submittal.
high stress point occurs on a portion of the piping with a lower temperature therefore 1.
k-
The the higher allowable.
: 3. The high stress point occurs on a portion of the piping with a higher temperature therefore the lower allowable.
This modified to reduce loads on other existing supports.
4   In the original stress analysis bothAs-built                                                                                                        spray headers     wereinconsidered differences                  as being pipe supports   caused similar two
s-supports were added or Pipe stress analysis performed since the August 1, 1979 submittal.
        "~          therefore only one analysis made.
2.
separate pipe stress runs be made. This resulted in different hardware modifications due
k-The high stress point occurs on a portion of the piping with a higher temperature therefore 3.
    'v              to pipe support analysis.
the lower allowable.
: 5. System operating temperature revised therefore allowable stress changed accordingly.
4 In the original stress analysis both spray headers were considered as being similar As-built differences in pipe supports caused two therefore only one analysis made.
      %-        6. Problem rerun with revised building displacements.
This resulted in different hardware modifications due
"~
separate pipe stress runs be made.
to pipe support analysis.
'v System operating temperature revised therefore allowable stress changed accordingly.
5.
6.
Problem rerun with revised building displacements.
6 of 7 v
6 of 7 v
                                                                                                                                                                                                                                            %) l
%) l


l SURRY POWER STATION, UNIT 1                                                     l SECTION 3 PIPE SUPPORT RESULTS Tables 3-1A and 3-1B summarize the pipe supports evaluated in the reanalysis program. There are 944 supports     (487 inside containment, 457                       outside containment) on lines originally analyzed by SHOCK 2. All 944 pipe supports l
l SURRY POWER STATION, UNIT 1 SECTION 3 PIPE SUPPORT RESULTS Tables 3-1A and 3-1B summarize the pipe supports evaluated in the reanalysis program.
have been reanalyzed, and 136 pipe support hardware modifications have been identified. The modifications identified, due to pipe support analysis, are listed in Table 3-2.
There are 944 supports (487 inside containment, 457 outside containment) on lines originally analyzed by SHOCK 2.
In cases where SSI-ARS was used,         the DBE seismic inertial reactions on i
All 944 pipe supports l
supports are multiplied by 1.5. Anchor movenents are not considered in the calculation of support stresses for the DBE conditions.
have been reanalyzed, and 136 pipe support hardware modifications have been identified.
l 3-1
The modifications identified, due to pipe support analysis, are listed in Table 3-2.
  ,-                                                                                                  --            m
In cases where SSI-ARS was used, the DBE seismic inertial reactions on i
supports are multiplied by 1.5.
Anchor movenents are not considered in the calculation of support stresses for the DBE conditions.
l 3-1 m -
e
=
n m


      '                                  SURRY POWER STATION, UNIT 1
SURRY POWER STATION, UNIT 1 TABLE 3-1B (Cont)
* TABLE 3-1B (Cont)
PIPE SUPPORT STATUS  
PIPE SUPPORT STATUS  


==SUMMARY==
==SUMMARY==
OUISIDE CO'''sINMENT - SHOCK 2 1
OUISIDE CO'''sINMENT - SHOCK 2 1
No. Accep-                           Modifica-                          ,
Modifica-No. Accep-tions or table System and Total No. of (Evaluation No. Under Additions Prob. No.
table                                tions or (Evaluation No. Under Additions System
Surrerts Corolete) __ Evaluatiqn Recuired_ Con-ent Component Cooline l
:              and              Total No. of            Corolete) __ Evaluatiqn Recuired_ Con-ent Prob. No.              Surrerts Component Cooline i                                                                                -                          6 26                    26 l   488/480
488/480 26 26 6
                                                                                  -                          4 20                  20 507/481
i 507/481 20 20 4
;                                                                                  -                        9 27                  27 509A/D                                                                                                                           ,
509A/D 27 27 9
                                                                                    -                        1 6                       6 i         l      5093 2                       2 509C
1 l
                                                                                    -                        3 5                      5 512
5093 6
                                                                                    -                          7 34                   34 517
6 i
                                                                                      -                          3 11                     11 526C
509C 2
!                                                                                      -                        3 13                    13 527A/C
2 512 5
                                                                                        -                        1 15                     15 612 J
5 3
                                                                                        -                      8 14                     14 614
517 34 34 7
                                                                                          -                      6 17                     17 766
526C 11 11 3
                                                                                          -                      3 6                       6 1512
527A/C 13 13 3
                                                                                          -                      5 11                     11 2526
612 15 15 1
                                                                                            -                      4
J 614 14 14 8
'l 14                      14 2527/2529 Containment I               Vacuun
766 17 17 6
                                                                                            -                      1 3                      3 CV1 3" MP Stean 19                     19 746 l'
3 6
6 1512 5
2526 11 11 2527/2529 14 14 4
'l Containment I
Vacuun CV1 3
3 1
3" MP Stean 746 19 19 l
2 of 3
2 of 3


A F
A F
SURRY POWER STATION, UNIT 1
SURRY POWER STATION, UNIT 1 TABLE 3-2 (Cont)
                                                                                                                                    ~
~
TABLE 3-2 (Cont)                                                       .
PIPE SUPPORT HARDWARE MODIFICATION  
-                                          PIPE SUPPORT HARDWARE MODIFICATION  


==SUMMARY==
==SUMMARY==
 
Description of Modified Since Pre' lam Support Modification or August 21, 1979 Attributable No.
Description of             Modified Since Pre' lam Support       Modification or           August 21, 1979 Attributable     Resolution To:
No.
No.     No. Overstressed Condition             Submittal Uplift problem                 Note 1. Yes     Seismic     Replace rod hanger with sway strut.           -
Overstressed Condition Submittal To:
13                                                        Roanalysis Uplift problem                 Note 1. Yes     Seismic     Replace rod hanger with sway strut.
Resolution 13 Uplift problem Note 1. Yes Seismic Replace rod hanger with sway strut.
14                                                        Reanalysis U-bolt overstressed           Note 1. Yes     Seismic     Replace with frame.
Roanalysis 14 Uplift problem Note 1. Yes Seismic Replace rod hanger with sway strut.
CF-2    2                                                        Roanalysis Seismic     Added weld and gusset plater.
Reanalysis CF-2 2
4        Weld overstressed              Note 1. Yes Reanalysis Note 1. Yes     Seismic     Add baseplate and shims and added 21        Improper support l 488                                                                Reanalysis lateral restraint.
U-bolt overstressed Note 1. Yes Seismic Replace with frame.
Seismic     Increase weld, add brace (S1W).
Roanalysis 4
22        Weld and bolts overstressed Note 1. Yes        Reanalysis Weld overstressed             Note 1. Yes     Seismic     Increase weld.
Weld overstressed Note 1. Yes Seismic Added weld and gusset plater.
I          6                                                        Reanalysis Note 1. Yes     Seismic     Replace with frame, add bracings l 509B    28        U-bolt overstressed                            Reanalysis and baseplate.
Reanalysis l 488 21 Improper support Note 1. Yes Seismic Add baseplate and shims and added Reanalysis lateral restraint.
Structure, weld and U-bolt     Note 1. Yes     Seismic     Removs support, add frame w/ brace.
22 Weld and bolts overstressed Note 1. Yes Seismic Increase weld, add brace (S1W).
512      3                                                        Reanalysis overstressel Note 1. Yes     Seismic   Modify support, remove support, 6        Structure, weld and U-bolt Reanalysis add frame.
Reanalysis I
overstressed 8         Integral welded attachment     Note 1. Yes     Seismic     Add pad, add braces.
6 Weld overstressed Note 1. Yes Seismic Increase weld.
Reanalysis overstressed 4         Structure and weld over-       Note 1. Yes     Seismic     Add stanchion and slide l 612                stressed                                       Reanalysis plates.
Reanalysis l 509B 28 U-bolt overstressed Note 1. Yes Seismic Replace with frame, add bracings Reanalysis and baseplate.
Seismic    Add plates and shims.
512 3
  ~l     614     1         Structure overstressed         Note 1. Yes Reanalysis ganged with H27 Pro. 8509B Seismic     Replace U-bolt w/ frame, add brace.
Structure, weld and U-bolt Note 1. Yes Seismic Removs support, add frame w/ brace.
2        Structure and U-bolt          Note 1. Yes Reanalysis overstressed
overstressel Reanalysis 6
    ~
Structure, weld and U-bolt Note 1. Yes Seismic Modify support, remove support, overstressed Reanalysis add frame.
8 Integral welded attachment Note 1. Yes Seismic Add pad, add braces.
overstressed Reanalysis l 612 4
Structure and weld over-Note 1. Yes Seismic Add stanchion and slide stressed Reanalysis plates.
~l 614 1
Structure overstressed Note 1. Yes Seismic Add plates and shims.
ganged with H27 Pro. 8509B Reanalysis 2
Structure and U-bolt Note 1. Yes Seismic Replace U-bolt w/ frame, add brace.
overstressed Reanalysis i
8 of 10
8 of 10
~
l


~
~
f%                                                                                                                                                                                                          #%
f%
SURRY POWER STATION, UNIT 1                                               [
SURRY POWER STATION, UNIT 1
[
TABLE 3-2 (cont)
TABLE 3-2 (cont)
PIPE SUPPORT HARDWARE MODIFICATION  
PIPE SUPPORT HARDWARE MODIFICATION  


==SUMMARY==
==SUMMARY==
                                      \~
\\~
Description of                                   Modified Since Problem                                                           Support   hodification or                                 August 21, 1979 Attributable No.                                             No. Overstressed Condition                                 Submitral         To:       Resolution 5       Support structure over-                             Note 1. Yes     Seismic     Revise IWA; add lateral brace and stressed (ganged with                                               Reanalysis closure plate to column.
Description of Modified Since Problem Support hodification or August 21, 1979 Attributable No.
H31, Pro. #509B, H7 Pro. #512) 7       Structure and U-bolt                               Note 1. Yes     Seismic     Replace U-bolt w/ beams, add brace.       -
No.
overstressed                                                         Reanalysis l                                                                   8       Improper support                                   Note 1. Yes     Seismic     Add lateral restraint.
Overstressed Condition Submitral To:
Reanalysis                                             -
Resolution 5
l                                                                  9       Structure overstress                               Note 1. Yes     Seismic     Add gussets to baseplate.
Support structure over-Note 1. Yes Seismic Revise IWA; add lateral brace and stressed (ganged with Reanalysis closure plate to column.
Reanalysis 10     Integral welded attachment                         Note 1. Yes     Seismic     Replace exist. support w/lWA and overstressed                                                         Reanalysis frame to floor.
H31, Pro. #509B, H7 Pro. #512) 7 Structure and U-bolt Note 1. Yes Seismic Replace U-bolt w/ beams, add brace.
13     Uplift restraint required                           Note 1. Yes     Seismic     Replace vs by vc.
overstressed Reanalysis l
Reanalysis 766                                                               5       Support structure and                               Note 1. Yes     Support     Modify support.
8 Improper support Note 1. Yes Seismic Add lateral restraint.
weld overstressed (ganged                                           Reanalysis                                           -
Reanalysis l
with H39, Pro. #517) 7       Support, structure over-                           Note L. Yes     Support     Modify support, stress (ganged with                                                 Reanalysis H32, Pro. #517) 8       Support uplift over-                               Note 1. Yes     Support     Modify support.
9 Structure overstress Note 1. Yes Seismic Add gussets to baseplate.
stress problem (ganged with                                         Reanalysis H33, Pro. #517) l                                                                   9       Support veld overstressed                           Note 1. Yes     Support     Add shim plate and angle, and uplift (ganged with                                             Reanalysis H34, Pro. #517) 14     U-bolt, welds and structure Note 1. Yes                             Support     Remove U-bolt, add frame and brace.
Reanalysis 10 Integral welded attachment Note 1. Yes Seismic Replace exist. support w/lWA and overstressed Reanalysis frame to floor.
overstressed                                                         Reanalysis 15     Structure and weld over-                           Note 1. Yes     Support     Add braces.
13 Uplift restraint required Note 1. Yes Seismic Replace vs by vc.
stress                                                               Reanalysis
Reanalysis 766 5
        ~
Support structure and Note 1. Yes Support Modify support.
weld overstressed (ganged Reanalysis with H39, Pro. #517) 7 Support, structure over-Note L. Yes Support Modify support, stress (ganged with Reanalysis H32, Pro. #517) 8 Support uplift over-Note 1. Yes Support Modify support.
stress problem (ganged with Reanalysis H33, Pro. #517) l 9
Support veld overstressed Note 1. Yes Support Add shim plate and angle, and uplift (ganged with Reanalysis H34, Pro. #517) 14 U-bolt, welds and structure Note 1. Yes Support Remove U-bolt, add frame and brace.
overstressed Reanalysis 15 Structure and weld over-Note 1. Yes Support Add braces.
stress Reanalysis
~
9 of 10 f
9 of 10 f
(-----___~   - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(-----
~


b                                                                                                                               -
b SURRY POWER STATION, UNZT 1 TABLE 3-2 (Cont)
SURRY POWER STATION, UNZT 1                                                     ,"
TABLE 3-2 (Cont)                                                       .'
PIPE SUPPORT HARDWARE MODIFICATION  
PIPE SUPPORT HARDWARE MODIFICATION  


==SUMMARY==
==SUMMARY==
Description of             Modified Since Problem   Support     Modification or             August 21, 1979 Attributable                                                 -.
Description of Modified Since Problem Support Modification or August 21, 1979 Attributable No.
No.         No. Overstressed Condition             Submittal         To:             Resolution 2526       1       Support overstress (ganged     Note 1. Yes     Seismic         Modify support.                               -
No.
with H4 Pro. #512, H2,                         Reanalysis Pro. 82529)                                                                                                       '
Overstressed Condition Submittal To:
l           6       Integral velded attachment     Note 1. Yes     Seismic         Modify Support.
Resolution 2526 1
                                                                                                                                                    ~'
Support overstress (ganged Note 1. Yes Seismic Modify support.
overstressed                          -        Reanalysis 9       Uplift problem                 Note 1. Yes     Seismic         Replace rod hanger with sway Roanalysis       strut.
with H4 Pro. #512, H2, Reanalysis Pro. 82529) l 6
l           18       Vertical, lateral, axial       Note 1. Yes     Seismic         R'aplace rod hanger w/ frame, add restraint required by pipe                     Reanalysis       Jugs to modified support, relocate stress due to H2O overstress                                     support.
Integral velded attachment Note 1. Yes Seismic Modify Support.
20       Integral velded attachment     Note 1. Yes     Seismic         Rerun NUPIPE revise H18, and overstressed                                   Reanalysis       replace IWA w/(2) IWAs.
overstressed Reanalysis
j                   NOTES:
~'
: 1. Modification outside containment.
9 Uplift problem Note 1. Yes Seismic Replace rod hanger with sway Roanalysis strut.
: 2. Modified prior to interim operation as required per August 22, 1979 order.
l 18 Vertical, lateral, axial Note 1. Yes Seismic R'aplace rod hanger w/ frame, add restraint required by pipe Reanalysis Jugs to modified support, relocate stress due to H2O overstress support.
20 Integral velded attachment Note 1. Yes Seismic Rerun NUPIPE revise H18, and overstressed Reanalysis replace IWA w/(2) IWAs.
j NOTES:
1.
Modification outside containment.
2.
Modified prior to interim operation as required per August 22, 1979 order.
4 4
4 4
i t
i t
i~
i
10 of 10                                                                 -.
~
__}}
10 of 10
-.}}

Latest revision as of 03:47, 2 January 2025

Reanalysis of Safety-Related Piping Sys, Corrected Pages
ML19309B105
Person / Time
Site: Surry 
Issue date: 03/28/1980
From:
STONE & WEBSTER ENGINEERING CORP.
To:
Shared Package
ML19309B104 List:
References
NUDOCS 8004030128
Download: ML19309B105 (8)


Text

-

?

i I

CORRECTED PAGES TO REVISED REPORT ON THE

,[

REANALYSIS OF SAFETY-RELATED PIPING SYSTEMS SURRY POWER STATION - UNIT 1 VIRGINI A ELECTRIC AND POWER COMPANY t

i 1.

Section 2, Page 2-2 Replace page in existing report.

2.

Section 2, Table 2-1, Page 6 of 7 Replace page in existing report.

3 Sect ion 3, Page 3-I Replace page in existing report.

4.

Section -3, Tabic 3-18, Page 2 of 3, Replace page in existing report.

5.

Section 3, Table 3-2, Pages 8, 9, 10 Replace pages in existing report.

1 I

1 4

i i

I O

3 gas

,, -..., _ _.. - - - - -, -.. ~. -. -., - _, - - -, -.,

E SURRY POWER STATION, UNIT 1 technique which is always more conservative than the approved SRSS method, and an SRSS technique for inter-modal combination.

Additionally, in some cases, piping is analyzed utilizing amplified response spectra (ARS) that are developed using soil structure interaction techniques (SSI-ARS).

The resultant stresses and loads are used to evaluate piping, supports, nozzles, and penetrations.

In accordance with the NRC letter af May 25, 1979 to Virginia Electric and Power Company (VEFCO), the seismic inertial stresses typical loads computed using the SSI-ARS have been increased by a factor of 1.5 for the DBE condition.

All 63 SHOCK 2 problems have been teanalyzed and approved by S&W Engineering l Assurance or NSC Project Management.

Tatie 2-1 for the Design Basis Earthquake shows the results for these 63 stress problems.

In Table 2-1, the figures for Original Total Stress, at the point of maximum total stress in the

pipe, and Original Seismic Stress, at the same point, are extracted from Table 3-1 of the " Seismic Design Review Equipment and Piping, Surry Fever Station," dated September 15, 1971. The original calculations for the seismic design review report are no longer available; therefore, correlations were made to the original stresses in Table 3-1 on the basis of the MSK's.

In Table 2-1, the columns for New Total Stress, at the point of maximum total stress in the pipe, and New Seismic Stress, at the same point, were taken from 2-2

II SURRY POWER STATION, UNIT 1 TAPLE 2-1 (Cont)

PIPE STRESS REEVALUATION

SUMMARY

DESIGN BASIS E RTHQUAKE LIgend:

-s NA : Not Available l Allowable Stress : 1.8 S h l N:w Total Stress : SLP + SDW + 1.5 SDBEI + SDBEA (f or SSI/ARS) l New Seismic = 1.5 SDBE1 (for SSI/ARS) l New Total Stress : Sgp + SDW + SDBEI

  • SDBEA ( riginal ARS) l New Seismic : SDBEL ( riginal ARS)

NOTE:

stresses shown in Table 2-1 were computed using original totalM and original seismicMThe new total and new seismic stresses were The SHOCK 2 for the original design conditions.

in some cases, different ARS's by the NUPIPE program using different mass models and, the reanalyses were based on field-verified computed which, in some cases, differ significantly from the original More importantly, than the original calculations.

stresses in Table 2-1 in 1979, piping configurationsFor this reason, the new stresses and the originalthe same physical conditions.

design conditions.

are not comparable, as they do not necessarily represent 1, 1979 table and table submitted J

DESCRIPTIVE NOTES (To explain differences between the August in this report):

high stress point occurs on a portion of the piping with a lower temperature therefore 1.

The the higher allowable.

This modified to reduce loads on other existing supports.

s-supports were added or Pipe stress analysis performed since the August 1, 1979 submittal.

2.

k-The high stress point occurs on a portion of the piping with a higher temperature therefore 3.

the lower allowable.

4 In the original stress analysis both spray headers were considered as being similar As-built differences in pipe supports caused two therefore only one analysis made.

This resulted in different hardware modifications due

"~

separate pipe stress runs be made.

to pipe support analysis.

'v System operating temperature revised therefore allowable stress changed accordingly.

5.

6.

Problem rerun with revised building displacements.

6 of 7 v

%) l

l SURRY POWER STATION, UNIT 1 SECTION 3 PIPE SUPPORT RESULTS Tables 3-1A and 3-1B summarize the pipe supports evaluated in the reanalysis program.

There are 944 supports (487 inside containment, 457 outside containment) on lines originally analyzed by SHOCK 2.

All 944 pipe supports l

have been reanalyzed, and 136 pipe support hardware modifications have been identified.

The modifications identified, due to pipe support analysis, are listed in Table 3-2.

In cases where SSI-ARS was used, the DBE seismic inertial reactions on i

supports are multiplied by 1.5.

Anchor movenents are not considered in the calculation of support stresses for the DBE conditions.

l 3-1 m -

e

=

n m

SURRY POWER STATION, UNIT 1 TABLE 3-1B (Cont)

PIPE SUPPORT STATUS

SUMMARY

OUISIDE COsINMENT - SHOCK 2 1

Modifica-No. Accep-tions or table System and Total No. of (Evaluation No. Under Additions Prob. No.

Surrerts Corolete) __ Evaluatiqn Recuired_ Con-ent Component Cooline l

488/480 26 26 6

i 507/481 20 20 4

509A/D 27 27 9

1 l

5093 6

6 i

509C 2

2 512 5

5 3

517 34 34 7

526C 11 11 3

527A/C 13 13 3

612 15 15 1

J 614 14 14 8

766 17 17 6

3 6

6 1512 5

2526 11 11 2527/2529 14 14 4

'l Containment I

Vacuun CV1 3

3 1

3" MP Stean 746 19 19 l

2 of 3

A F

SURRY POWER STATION, UNIT 1 TABLE 3-2 (Cont)

~

PIPE SUPPORT HARDWARE MODIFICATION

SUMMARY

Description of Modified Since Pre' lam Support Modification or August 21, 1979 Attributable No.

No.

Overstressed Condition Submittal To:

Resolution 13 Uplift problem Note 1. Yes Seismic Replace rod hanger with sway strut.

Roanalysis 14 Uplift problem Note 1. Yes Seismic Replace rod hanger with sway strut.

Reanalysis CF-2 2

U-bolt overstressed Note 1. Yes Seismic Replace with frame.

Roanalysis 4

Weld overstressed Note 1. Yes Seismic Added weld and gusset plater.

Reanalysis l 488 21 Improper support Note 1. Yes Seismic Add baseplate and shims and added Reanalysis lateral restraint.

22 Weld and bolts overstressed Note 1. Yes Seismic Increase weld, add brace (S1W).

Reanalysis I

6 Weld overstressed Note 1. Yes Seismic Increase weld.

Reanalysis l 509B 28 U-bolt overstressed Note 1. Yes Seismic Replace with frame, add bracings Reanalysis and baseplate.

512 3

Structure, weld and U-bolt Note 1. Yes Seismic Removs support, add frame w/ brace.

overstressel Reanalysis 6

Structure, weld and U-bolt Note 1. Yes Seismic Modify support, remove support, overstressed Reanalysis add frame.

8 Integral welded attachment Note 1. Yes Seismic Add pad, add braces.

overstressed Reanalysis l 612 4

Structure and weld over-Note 1. Yes Seismic Add stanchion and slide stressed Reanalysis plates.

~l 614 1

Structure overstressed Note 1. Yes Seismic Add plates and shims.

ganged with H27 Pro. 8509B Reanalysis 2

Structure and U-bolt Note 1. Yes Seismic Replace U-bolt w/ frame, add brace.

overstressed Reanalysis i

8 of 10

~

l

~

f%

SURRY POWER STATION, UNIT 1

[

TABLE 3-2 (cont)

PIPE SUPPORT HARDWARE MODIFICATION

SUMMARY

\\~

Description of Modified Since Problem Support hodification or August 21, 1979 Attributable No.

No.

Overstressed Condition Submitral To:

Resolution 5

Support structure over-Note 1. Yes Seismic Revise IWA; add lateral brace and stressed (ganged with Reanalysis closure plate to column.

H31, Pro. #509B, H7 Pro. #512) 7 Structure and U-bolt Note 1. Yes Seismic Replace U-bolt w/ beams, add brace.

overstressed Reanalysis l

8 Improper support Note 1. Yes Seismic Add lateral restraint.

Reanalysis l

9 Structure overstress Note 1. Yes Seismic Add gussets to baseplate.

Reanalysis 10 Integral welded attachment Note 1. Yes Seismic Replace exist. support w/lWA and overstressed Reanalysis frame to floor.

13 Uplift restraint required Note 1. Yes Seismic Replace vs by vc.

Reanalysis 766 5

Support structure and Note 1. Yes Support Modify support.

weld overstressed (ganged Reanalysis with H39, Pro. #517) 7 Support, structure over-Note L. Yes Support Modify support, stress (ganged with Reanalysis H32, Pro. #517) 8 Support uplift over-Note 1. Yes Support Modify support.

stress problem (ganged with Reanalysis H33, Pro. #517) l 9

Support veld overstressed Note 1. Yes Support Add shim plate and angle, and uplift (ganged with Reanalysis H34, Pro. #517) 14 U-bolt, welds and structure Note 1. Yes Support Remove U-bolt, add frame and brace.

overstressed Reanalysis 15 Structure and weld over-Note 1. Yes Support Add braces.

stress Reanalysis

~

9 of 10 f

(-----

~

b SURRY POWER STATION, UNZT 1 TABLE 3-2 (Cont)

PIPE SUPPORT HARDWARE MODIFICATION

SUMMARY

Description of Modified Since Problem Support Modification or August 21, 1979 Attributable No.

No.

Overstressed Condition Submittal To:

Resolution 2526 1

Support overstress (ganged Note 1. Yes Seismic Modify support.

with H4 Pro. #512, H2, Reanalysis Pro. 82529) l 6

Integral velded attachment Note 1. Yes Seismic Modify Support.

overstressed Reanalysis

~'

9 Uplift problem Note 1. Yes Seismic Replace rod hanger with sway Roanalysis strut.

l 18 Vertical, lateral, axial Note 1. Yes Seismic R'aplace rod hanger w/ frame, add restraint required by pipe Reanalysis Jugs to modified support, relocate stress due to H2O overstress support.

20 Integral velded attachment Note 1. Yes Seismic Rerun NUPIPE revise H18, and overstressed Reanalysis replace IWA w/(2) IWAs.

j NOTES:

1.

Modification outside containment.

2.

Modified prior to interim operation as required per August 22, 1979 order.

4 4

i t

i

~

10 of 10

-.