| | #REDIRECT [[05000346/LER-1980-039-03, /03L-0:on 800423,Tech Specs Requirement Late Date Passed for Offsite Ac Sources Lineup & Available Weekly Test ST 5080.01.Caused by Oversight of Shift Supervisor When Test Not Indicated on Computer Printout Test Schedule]] |
| | number = ML20009D833
| |
| | issue date = 07/13/1981
| |
| | title = /03X-1:on 800423,weekly Test of Offsite Ac Sources Not Performed by Required Date.Caused by Oversight of Shift Supervisor.Addl Reminders Will Be Given by Section Personnel
| |
| | author name = Kocis R
| |
| | author affiliation = TOLEDO EDISON CO.
| |
| | addressee name =
| |
| | addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| |
| | docket = 05000346
| |
| | license number =
| |
| | contact person =
| |
| | document report number = LER-80-039-03X, LER-80-39-3X, NUDOCS 8107240395
| |
| | package number = ML20009D829
| |
| | document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| |
| | page count = 2
| |
| }}
| |
| {{LER
| |
| | Title = /03X-1:on 800423,weekly Test of Offsite Ac Sources Not Performed by Required Date.Caused by Oversight of Shift Supervisor.Addl Reminders Will Be Given by Section Personnel
| |
| | Plant =
| |
| | Reporting criterion =
| |
| | Power level =
| |
| | Mode =
| |
| | Docket = 05000346
| |
| | LER year = 1980
| |
| | LER number = 39
| |
| | LER revision = 3
| |
| | Event date =
| |
| | Report date =
| |
| | ENS =
| |
| | abstract =
| |
| }}
| |
| | |
| =text=
| |
| {{#Wiki_filter:U.S. NUCL'E AR REGULATORY COMMISSION faRC FORP13GG 87 171 LICENSEE EVENT REPORT CONTROL BLOCX: l l
| |
| l l
| |
| l l lh-(PLEASE P' TNT OR TYPE ALL REQUIRED INFORMATION) 1 6
| |
| l 0 l 0 l@l 4 l 1 l 1 l 1 l 1 l@]
| |
| l lg lo l s] l 0 l H l D l B l S l 1l@l 0 l 0 ] 0 l 0 l 0 l 0 l 0 l 0 i
| |
| d 9 LICENSEE CODE 14 15 LICENSE NUMBEM 25 26 L 4ENSE TYPE J0 SF CAT $8 lolil S0RCE I L 'rhdi S j 0 ] - l 0 l 3 l4 l 6 Ql 0 l 4 l 2 l 3 l 8 l 0 l@[0 l 7 Il l 318 ll i@
| |
| CON'T 7
| |
| 8 60 Of CCCKET NUYSER 68 69 EVENT DATE 74 76 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h I o 12 l l (NP-33-80-48) On April 23, 1980 at 0440 hours, the Technical Specification 3.8.1.2 l
| |
| AC Sources Lined U;. and l
| |
| l o l a l i surveillance requirement late date passed for the Of f-Site
| |
| ;o;4; l Available Weekly Test, ST 5080.01. There was no danger to the health and safety of I
| |
| ;o;3; ; the public or to station personnel. The test was successfully performed at 1030 hours l l
| |
| l o le l l the same day and was hte by only six hours and ten minutes.
| |
| I lo I7I I l
| |
| I o Is l I 80 CE CODE SUSC E COMPONENT CODE SUSCODE SU E
| |
| ITTTl I El Al@ W@ l A l@ lZ lZ lZ lZ lZ lZ l@ ]@ W @
| |
| 7 8
| |
| 9 10 11 12 13 18 19 20 SEQUENTI AL OCCURRENCE REPORT REVISION
| |
| ,_ EVENT YE AR REPORT NO.
| |
| CODE TYPE NO.
| |
| @,a'ER ROu Ep l8 l0 l l-l [0 l3 l9 l
| |
| ]/l l 0l 3l lXl
| |
| [-]
| |
| l1l L
| |
| 'R 1
| |
| _ 21 22 23 24 26 27 28 29 30 31 32 AK f A T ON O PLA T
| |
| .ETM HOURS SS IT O FORP.1 B.
| |
| 5 PPLIE MAN F C LRER ljtJ@lo l@
| |
| l zi@
| |
| (z_J@
| |
| l el el el el LyJ@
| |
| l N [@
| |
| lz l@
| |
| (7 lz lz lz l@
| |
| 33 34 35 J6 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l i l 0 l l The cause was an oversight by the Shif t Supervisor. The test did show up on the com- ]
| |
| 12 111 Iputer printed test schedule. Given the work load of the Shift Supervisor during an l
| |
| ,,, l outage, additional reminders of imminent tests are needed and will be supplied by l
| |
| l g Isection personnel.
| |
| 1 i 4 1
| |
| 7 8 9 STA S
| |
| % POWER OTHER STATUS IS C Y
| |
| DISCOVERY DESCRIPTION Q J @ l0 l0 10j @l NA l
| |
| lA[@lSurveillanceTestSchedule l
| |
| i s ACTIVITY CO TENT' RELEASED OF RELEASE AVOUNT oF ACTIVITY LOCATION OF RELE ASE [Z_j@lZj@lNA l
| |
| l NA l
| |
| 1 6 PERSONNet ExPosOES NUMBER TYPE JESCRIPTION l
| |
| I Ol 0 l O l@l Z l@l NA
| |
| ' 7 PERSONNE L INJURIES NUMBE R
| |
| | |
| ==DESCRIPTION==
| |
| l 101610l@l NA i a 80 7
| |
| 8 9 11 12 LOSS OF OR DAVAGE TO FACILITY Q TYPE DESCfhPTION v
| |
| l J@l NA i 9 8'
| |
| PusuSTv B107240395 810713 NRC USE ONLY cEscR;PTios h PDR ADOCK 05000346 PDR l
| |
| llll]lllllll [j issueo uuSLu^
| |
| s
| |
| : O 68 69 80 ;i 7
| |
| 8 9 10 m 8&O73 PHONE:
| |
| NAME OF PREPARER
| |
| | |
| TOLEDO EDISON COMPANY
| |
| (
| |
| DAVIS-BESSE NUCLEAR POL;ER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-80-48 DATE OF EVENT: April 23, 1980 FACILITY: Davis-9 esse Unit 1 1
| |
| IDENTIFICATIp 0F OCCURRENCE: Off-Site AC Sources Lined Up and Available Weekly
| |
| , Test, ST 50>J.01, was not performed within surveillance requiremenc frequency Conditions Prior to Occurrence: The unit was in Mode 6, with Power (MRT) = 0 and Load (Gross MRE) = 0.
| |
| Description of Occurrence: During a review of the surveillance test schedule on
| |
| . April.23, 1980, the Shift Supervisor discovered that ST 5080.01, Off-Site AC Sources Lined Upand Available Weekly Test, had gone past its surveillance require-ment late date of April 23,.1980 at 0440 hours.
| |
| This is being reported to document the failure to meet a surveillance requirement of Technical Specification 3.8.1.2 which requires, in Modes 5 and 6, an off-site AC-source to be determined operable at least once per seven days by verifying correct
| |
| ~ breaker' alignment and indicated power availability.
| |
| l 1
| |
| ST 5080.01 was completed at 1030 hours the same day and was late by only five hours and fifty minutes.
| |
| Des'ignation of Apparent Cause of Occurrence: The cause of this occurrence was opera-
| |
| . tor error since ST 5080.01 was overlooked on the surveillance test schedule. Given the workload and activity level created by the refueling outage, a procedural defi-ciency was evident since administrative controls were not sufficient to assist the Shif t Supervisor.by identifying pending late surveillasce tests.
| |
| Anslysis of Occurrence: There was no danger to the health and safety of the public
| |
| 'cr to station personnel. Jba emergency diesel generator was available to supply safety related. equipment in the event of a total loss of off-site power.
| |
| Surveillance Test ST, 5080.01 was completed without any discrepancies.
| |
| Corrective' Action: There is no evidence that the Shift Supervisor has difficulty in maintaining the surveillance test schedule when normal shift work loads exist. There-
| |
| ? fore, to preclude the consequences of an ina.ccurate schedule review during periods of
| |
| ' increased work activity, administrative controls which will inform the Shift Supervi-sor of surveillance tests approaching their late date have been implemented.
| |
| 1 t.
| |
| :- Failure Data:
| |
| Surveillance Test ST 5080,01.has previously been missed due to a per-sonnel error as reported in Licensee Evsnt Reports NP-33-80-37 (80-031) and 1NP-33-77-84.-
| |