{{#Wiki_filter:m;; -
{{#Wiki_filter:m;; -
                                                  'E                             #
'E g
g                    1           ._.t.                 *
1
    ~ }<i Q 4 :
._.t.
e y39                .. .            _
~ }<i Q 4 :
p                                 ic               ;./                 N Commonweehh Edison                                 .
y39 e
y , gar              g ;b l,- '                         i         _ d 72 West Adams Street Chicago, Illinois b,'                           jy'                       \ '''' / Address Reply to: Pc.t Offica Box 767 ---
p ic
4,                                            ,            A4 Chicago, Illinois 60690 0767 jy Qi ,' <
;./
c_ ,
N Commonweehh Edison y, g ;b l,- '
t .-
gar i
p,g                                                                                                               : October 11, 1989:
_ d 72 West Adams Street Chicago, Illinois b,'
y   , 1
jy'
:[                                         Dr; Thomas E..Murley. Director?
\\ '''' / Address Reply to: Pc.t Offica Box 767 ---
                                                  ' Office of Nuclear Reactor Regulation                                                           4 U.SL Nuclear Regulatory Commission                                                         -l 4                                              '
A4 Chicago, Illinois 60690 0767 4,
Hashington, DC 20555                                                                             ,
jy Qi,' <
                                                                                                                                                  ^
c_,
t.-
p,g
: October 11, 1989:
y
, 1
:[
Dr; Thomas E..Murley. Director?
' Office of Nuclear Reactor Regulation 4
U.SL Nuclear Regulatory Commission
-l Hashington, DC 20555 4
^


==Subject:==
==Subject:==
Quad Cities Nuclear Power Station Unitel                           l Cycle 11 Reload
Quad Cities Nuclear Power Station Unitel l
  ,o JiRC Docket No. 50-254                                 ;
Cycle 11 Reload
    ~
,o JiRC Docket No. 50-254
~


==Reference:==
==Reference:==
J. A.;Silady to T.E. Murley, " Quad Cities Nuclear-       .t Power Station Units 1:and 2, Proposed Amendment               "
J. A.;Silady to T.E. Murley, " Quad Cities Nuclear-
m                                                                                      - to Remove Cycle-Specific Core Limits from the-.            .
.t Power Station Units 1:and 2, Proposed Amendment m
                                                                                        - Technical Specification", dated July' 11,:1989/             ,
- to Remove Cycle-Specific Core Limits from the-.
        .n                                     ,                                                                                                    ;
- Technical Specification", dated July' 11,:1989/
tv                           s A                                         ,
.n tv s
                                                    .Dr. Murley:'
A
\r
=
                                        =
.Dr. Murley:'
g-                             ,
\\r 1.
1 .
g-E[] -
E[] -                                                                      -                  -
' Quad Cities Station Unit 1,:which has completed its tenth cycle of
                                                                        ' Quad Cities Station Unit 1,:which has completed its tenth cycle of     u
~
      ~
u 3
L,                                                   operation,=is currently preparing for. Cycle-11 startup. The purpose of this                 3
L, operation,=is currently preparing for. Cycle-11 startup.
                                                    . letter is twofold: .'(1) -to advise you of: Commonwealth, Edison's review and                 ;
The purpose of this
$<                                                - approval..'of the Cycle 11-reload!under the provisions of 10 CFR 50.59,-and (2) .                 ,
. letter is twofold:.'(1) -to advise you of: Commonwealth, Edison's review and
C                                                     to transmit the attached Core Operating Limits Report (COLR) forLthe upcoming         .
- approval..'of the Cycle 11-reload!under the provisions of 10 CFR 50.59,-and (2).
                                                                                                                                              ~     l
C to transmit the attached Core Operating Limits Report (COLR) forLthe upcoming l
                                                    - cycle 7as required by Generic-Letter 88-16. Note that Edison has submitted the-
~
                                                  - necess'ary Technical Specification changes-(See Reference) to incorporate:the                     .
- cycle 7as required by Generic-Letter 88-16.
                                    /   ,      - COLR. . Edison's.10 CFR 50.59 evaluation assumes approval of-this-amendment                       -
Note that Edison has submitted the-
            <                                        prior to unit startup.
- necess'ary Technical Specification changes-(See Reference) to incorporate:the
* y               s
/
                                                                          - The Quad Cities Unit 1 Cycle 11 core consists of NRC approved fuel designs:and was designed to' operate under currently approved fuel design                       !
- COLR.. Edison's.10 CFR 50.59 evaluation assumes approval of-this-amendment prior to unit startup.
q                              parameters, Technical Specifications and related bases such that:                             {
y s
W                           '
- The Quad Cities Unit 1 Cycle 11 core consists of NRC approved fuel designs:and was designed to' operate under currently approved fuel design q
                                                                ' 1 )- . Core operating characteristics will be less limiting than those previously reviewed and accepted; or ll-}
parameters, Technical Specifications and related bases such that:
{
W
' 1 )-. Core operating characteristics will be less limiting than those ll-}
previously reviewed and accepted; or
: 2) For those' postulated incidents analyzed and reported in the Final Safety Analysis ~ Report (FSAR) which could potentially be affected by the fuel reload,: re-analysis using NRC-approved methods has demonstrated that the results of the postulated events are within allowable limits.
: 2) For those' postulated incidents analyzed and reported in the Final Safety Analysis ~ Report (FSAR) which could potentially be affected by the fuel reload,: re-analysis using NRC-approved methods has demonstrated that the results of the postulated events are within allowable limits.
Off  1           ,
Of f 1 0318T:1 891018o056 891011 i
0318T:1                             891018o056 891011                             i PDR   ADOCK 0500o254 p
PDR ADOCK 0500o254 m
m-                                                                        PDC
p PDC
: 5. k- -           3
: 5. k- -
3


  *  ",  [                                           .
[
          .c. 3, i
.c.
b       .
3, i
Dr. T.E. Nurley                                                           October 11, 1989 Commonwealth Edison has performed a detailed review of the relevant                   .
b Dr. T.E. Nurley October 11, 1989 Commonwealth Edison has performed a detailed review of the relevant licensing documents, the bases, and references.
licensing documents, the bases, and references. Based on the review..a safety                   j evaluation was prepared as required by 10 CFR 50.5?(a,b) and submitted to                       '
Based on the review..a safety j
On-Site and Off-Site Review. As in the past, the. reload licensing documents                   j
evaluation was prepared as required by 10 CFR 50.5?(a,b) and submitted to On-Site and Off-Site Review. As in the past, the. reload licensing documents j
              .were prepared using previously approved methodologies as reported in the FSAR                   ;
.were prepared using previously approved methodologies as reported in the FSAR NEDE-24011 (GESTAR), and other generically approved documents.
NEDE-24011 (GESTAR), and other generically approved documents.                                   i l
i
                      .: Edison has reviewed the cycle-specific licensing results and concluded               j that additional Technical-Specification changes are not required for Cycle 11-                   '
.: Edison has reviewed the cycle-specific licensing results and concluded j
operation at Quad Cities Unit 1 assuming the reference amendment receives NRC approval. Furthermore, Edison has completed On-Site and Off-Site Reviews-which determined that no unreviewed safety questions are created by the reload.               .)
that additional Technical-Specification changes are not required for Cycle 11-operation at Quad Cities Unit 1 assuming the reference amendment receives NRC approval.
1                                                                                                               \
Furthermore, Edison has completed On-Site and Off-Site Reviews-which determined that no unreviewed safety questions are created by the reload.
                        'Therefore, application for an amendment to the Quad Cities Unit 1 1
.)
operating license is not required for resumption of operation with the Cycle 11 reload core. The estimated startup is November 20, 1989.                                         1 l
1
L
\\
                        'If-there are any further questions regarding this matter, please                     j i
'Therefore, application for an amendment to the Quad Cities Unit 1 1
contact this office.                                                                             l I
operating license is not required for resumption of operation with the Cycle 11 reload core.
Very truly yours, l
The estimated startup is November 20, 1989.
g       -
l L
J. A. S11ady Nuclear Licensing Administrator im Attachment.
'If-there are any further questions regarding this matter, please j
              .cc: T.M. Ross - Project. Manager, NRR R.L. Higgins - Senior Resident Inspector, Quad Cities 0318T:2
contact this office.
_ - - - _ _ - _ - _ _ _ _ _ _ _ _}}
i Very truly yours, l
g J. A. S11ady Nuclear Licensing Administrator im Attachment.
.cc:
T.M. Ross - Project. Manager, NRR R.L. Higgins - Senior Resident Inspector, Quad Cities 0318T:2
-}}

Latest revision as of 17:41, 31 December 2024

Advises of Util Review & Approval of Cycle 11 Reload & Forwards Core Operating Limits Rept (COLR) for Upcoming Cycle Per Generic Ltr 86-16.Tech Spec Changes to Incorporate COLR Submitted
ML19325C897
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/11/1989
From: Silady J
COMMONWEALTH EDISON CO.
To: Murely T
Office of Nuclear Reactor Regulation
Shared Package
ML19325C898 List:
References
0318T:1, 318T:1, GL-88-16, NUDOCS 8910180056
Download: ML19325C897 (2)


Text

m;; -

'E g

1

._.t.

~ }<i Q 4 :

y39 e

p ic

./

N Commonweehh Edison y, g ;b l,- '

gar i

_ d 72 West Adams Street Chicago, Illinois b,'

jy'

\\ ' / Address Reply to: Pc.t Offica Box 767 ---

A4 Chicago, Illinois 60690 0767 4,

jy Qi,' <

c_,

t.-

p,g

October 11, 1989:

y

, 1

[

Dr; Thomas E..Murley. Director?

' Office of Nuclear Reactor Regulation 4

U.SL Nuclear Regulatory Commission

-l Hashington, DC 20555 4

^

Subject:

Quad Cities Nuclear Power Station Unitel l

Cycle 11 Reload

,o JiRC Docket No. 50-254

~

Reference:

J. A.;Silady to T.E. Murley, " Quad Cities Nuclear-

.t Power Station Units 1:and 2, Proposed Amendment m

- to Remove Cycle-Specific Core Limits from the-.

- Technical Specification", dated July' 11,:1989/

.n tv s

A

=

.Dr. Murley:'

\\r 1.

g-E[] -

' Quad Cities Station Unit 1,:which has completed its tenth cycle of

~

u 3

L, operation,=is currently preparing for. Cycle-11 startup.

The purpose of this

. letter is twofold:.'(1) -to advise you of: Commonwealth, Edison's review and

- approval..'of the Cycle 11-reload!under the provisions of 10 CFR 50.59,-and (2).

C to transmit the attached Core Operating Limits Report (COLR) forLthe upcoming l

~

- cycle 7as required by Generic-Letter 88-16.

Note that Edison has submitted the-

- necess'ary Technical Specification changes-(See Reference) to incorporate:the

/

- COLR.. Edison's.10 CFR 50.59 evaluation assumes approval of-this-amendment prior to unit startup.

y s

- The Quad Cities Unit 1 Cycle 11 core consists of NRC approved fuel designs:and was designed to' operate under currently approved fuel design q

parameters, Technical Specifications and related bases such that:

{

W

' 1 )-. Core operating characteristics will be less limiting than those ll-}

previously reviewed and accepted; or

2) For those' postulated incidents analyzed and reported in the Final Safety Analysis ~ Report (FSAR) which could potentially be affected by the fuel reload,: re-analysis using NRC-approved methods has demonstrated that the results of the postulated events are within allowable limits.

Of f 1 0318T:1 891018o056 891011 i

PDR ADOCK 0500o254 m

p PDC

5. k- -

3

[

.c.

3, i

b Dr. T.E. Nurley October 11, 1989 Commonwealth Edison has performed a detailed review of the relevant licensing documents, the bases, and references.

Based on the review..a safety j

evaluation was prepared as required by 10 CFR 50.5?(a,b) and submitted to On-Site and Off-Site Review. As in the past, the. reload licensing documents j

.were prepared using previously approved methodologies as reported in the FSAR NEDE-24011 (GESTAR), and other generically approved documents.

i

.: Edison has reviewed the cycle-specific licensing results and concluded j

that additional Technical-Specification changes are not required for Cycle 11-operation at Quad Cities Unit 1 assuming the reference amendment receives NRC approval.

Furthermore, Edison has completed On-Site and Off-Site Reviews-which determined that no unreviewed safety questions are created by the reload.

.)

1

\\

'Therefore, application for an amendment to the Quad Cities Unit 1 1

operating license is not required for resumption of operation with the Cycle 11 reload core.

The estimated startup is November 20, 1989.

l L

'If-there are any further questions regarding this matter, please j

contact this office.

i Very truly yours, l

g J. A. S11ady Nuclear Licensing Administrator im Attachment.

.cc:

T.M. Ross - Project. Manager, NRR R.L. Higgins - Senior Resident Inspector, Quad Cities 0318T:2

-