d '                       NRC DIS;.ilBUTION FGR PART 50 DOCKET h.,,TERI AL (TEMPORARY FORM)
d '
CONTROL NO.           13069 FILE:
NRC DIS;.ilBUTION FGR PART 50 DOCKET h.,,TERI AL (TEMPORARY FORM)
FROM: Arkansas Pouer & Light Co. DATE OF DOC                         DATE REC'D           LTR     TWX     RPT       OTHER Little Reck, Ark.         72203 19, nitity                               11-7-75           11-14-75               XX TO:                         .
CONTROL NO.
ORIG           CC OTHER               SENTERC POR               XX Mr. D. L. Ziemann .                           I signed     39 SENT LOCAL PDR               XX CLASS         UNCLASS           PROPINFO             INPUT       NO CYS REC'D               DOCKET NO:
13069 FILE:
XXX                                                     -
FROM: Arkansas Pouer & Light Co. DATE OF DOC DATE REC'D LTR TWX RPT OTHER Little Reck, Ark.
40                     50-313                   .
72203 19, nitity 11-7-75 11-14-75 XX TO:
DESCRIPTION: Ltr re our 1-10-75 ltr...requestiENCLOSURES: Revised Tech Spec Page Changes for change to tech specs to the ANO-1 Tect                       to ANO-1 Tech Specs..
ORIG CC OTHER SENTERC POR XX Mr. D. L. Ziemann.
I signed 39 SENT LOCAL PDR XX CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXX 40 50-313 DESCRIPTION: Ltr re our 1-10-75 ltr...requestiENCLOSURES:
Revised Tech Spec Page Changes for change to tech specs to the ANO-1 Tect to ANO-1 Tech Specs..
Specs in re cn air filtration sytems...&
Specs in re cn air filtration sytems...&
trans the following:                                             (40 cys enc 1 rec'd)                   ..      OVe is PLANT NAME:               Ark. 1 FOR ACTION /INFC RMATION                         DHL     11-15-75 BUTLER (L)                     SCHWENCER (L) l@lE ANN (L)                       REGAN (E)             REID(L)
trans the following:
W/ Copies                       W/ Copies             W opies                   W/ Copies           W/ COPIES CLARK (L)                     STOLZ (L)             DI   ER (E)               LEAR (I.)
(40 cys enc 1 rec'd)
W/ Copies                       W/ Copies             W/ Copies                 W/ Copies PARR (L)                       VASSALLO (L)           KNIGHTON (E)               SPIES W/ Copies                       W/ Copies             W/ Copies -               " / Copies                                   --
OVe is PLANT NAME:
KNIEL (L)                     PURPLE (L)             YOUNGBLOOD (E)               PitCogl/pRgd W/ Copies                       W/ Copies             W/ Copies                 W/rCopies INTERNAL DISTRIBUTION TECH REVIEW             DENTON                     LIC ASST                   A/T IND .
Ark. 1 FOR ACTION /INFC RMATION DHL 11-15-75 BUTLER (L)
              .' PDR                   SCH RO E D E.R .       GRIMES thGC, ROOM P 506A                                                           M . DIGGS (L)
SCHWENCER (L) l@lE ANN (L)
R
REGAN (E)
                                                                                                                      $ R AITM AN. m MACCARY                 GAMMILL             H. GEARIN (L                     SALTZMAN eCOSSICK/STAF F                 j<NIG HT                 KASTNE R                                               MELTZ CASE E. GOULBOURNE (L)
REID(L)
                                    " ' FPAWLICKI                 BALLARD             P. KREUTZER (E)
W/ Copies W/ Copies W
GIAMBUSSO                     SHAO                   SPANGLER             J. LEE (L)         '
opies W/ Copies W/ COPIES CLARK (L)
PLANS 80YD STELLO                                                                       MCDONALD MOORE (L)                                                                M. RU3'52R00K(L)
STOLZ (L)
HOUSTON               _ ENVIRO             S. REED (E)                     CHAPMAN DEYOUNG (L)                   NOVAK                   MULLER             M. SERVICE (L)                   DUBE (Ltr)
DI ER (E)
SKOVHOLT (L)                 ROSS                   DICKER               S. SHEPPAR D (L)                 E. COUPE GOLLER (L) (Ltr)               IPPOLITO               KNIGHTON           M. SLATER (E)                     PETERSON P. CO L LINS                 TEDESCO                 YOUNGBLOOD           H. SMITH (L)                     HARTFIELD (2)
LEAR (I.)
DENISE                       J. COLLINS               EGAN                                               KLECKER TEG OPR S. TEETS (L)             .
W/ Copies W/ Copies W/ Copies W/ Copies PARR (L)
L AllyAS                       T     R     G. WILLI AMS (E)                 EISENHUT             -
VASSALLO (L)
KNIGHTON (E)
SPIES W/ Copies W/ Copies W/ Copies -
" / Copies KNIEL (L)
PURPLE (L)
YOUNGBLOOD (E)
PitCogl/pRgd W/ Copies W/ Copies W/ Copies W/rCopies INTERNAL DISTRIBUTION TECH REVIEW DENTON LIC ASST A/T IND.
M. DIGGS (L)
$ R AITM AN. m
' PDR SCH RO E D E.R.
GRIMES R
.i thGC, ROOM P 506A MACCARY GAMMILL H. GEARIN (L SALTZMAN eCOSSICK/STAF F j<NIG HT KASTNE R E. GOULBOURNE (L)
MELTZ CASE
' FPAWLICKI BALLARD P. KREUTZER (E)
GIAMBUSSO SHAO SPANGLER J. LEE (L)
PLANS 80YD STELLO M. RU3'52R00K(L)
MCDONALD MOORE (L)
HOUSTON
_ ENVIRO S. REED (E)
CHAPMAN DEYOUNG (L)
NOVAK MULLER M. SERVICE (L)
DUBE (Ltr)
SKOVHOLT (L)
ROSS DICKER S. SHEPPAR D (L)
E. COUPE GOLLER (L) (Ltr)
IPPOLITO KNIGHTON M. SLATER (E)
PETERSON P. CO L LINS TEDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
DENISE J. COLLINS EGAN S. TEETS (L)
KLECKER TEG OPR L AllyAS T
R G. WILLI AMS (E)
EISENHUT
[lLE & REGION (2)
[lLE & REGION (2)
HIPC BENAROYA VOLLMER                H AR _ SS
BENAROYA
                                                                                /$     V. WILSON (L)
/$
R. INGR "4 (L)
V. WILSON (L)
WIGGINTON Oh i
WIGGINTON HIPC VOLLMER H AR _ SS R. INGR "4 (L) i M. DUNCAN (a Oh EXTEriNAL DISTRIBUTION N m%
M. DUNCAN (a EXTEriNAL DISTRIBUTION                           N m%
- LOCAL PDR R aussellville, Ark.
                  - LOCAL PDR R aussellville, Ark.
-TIC (ABERNATHY) (1)(2)(10)- NATIONAL LABS 1 - PDR SAN /LA/NY i
                -TIC (ABERNATHY) (1)(2)(10)- NATIONAL LABS                                                 1 - PDR SAN /LA/NY i               - NSIC (BUCHANAN)                 "
- NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKHAVEN NAT LAB l
1 - W. PENNINGTON, Rm E 201 GT                     1 - BROOKHAVEN NAT LAB                   l i             1 - ASLB                                 1 - CONSU LTANTS                                   1 - G. ULRIKSON ORNL l                   Newton Anderson                             EWM ARK /BLUME/AGBABI AN l                   ACRS M SENT fp g,                         ,                                                            ,
i 1 - ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON ORNL l
1                                                                                                           ^
Newton Anderson EWM ARK /BLUME/AGBABI AN l
s con sa59 Y f                                                       -
ACRS M SENT fp g, 1
1
s con sa59 Y f
^


g   s                           f                                                          _ _ ,
f g
t                                                                            N"U*++--es     ,~
s 1,L h;( fj]g N"U*++--es t
1,L h;( fj]g m
,~
H EL PIN G BUILO ARKANSAS A AK ANS AS POWER & LIGHT COMPANY STH & LOygglANA STREE TS . LITTLE ACCK. A AK ANSAS 72203.(501)372-4311 November 7, 1975               -- .
m H EL PIN G BUILO ARKANSAS A AK ANS AS POWER & LIGHT COMPANY STH & LOygglANA STREE TS. LITTLE ACCK. A AK ANSAS 72203.(501)372-4311 November 7, 1975
[/. %,
[/.. '..-Q ',.
                                                                . ' '..-Q g7               p,, y,,'\                         -        -
g7 p,,
p/q.                         s   '':\  .
y,,'\\
'':\\
p/q.
s (q,
j -.
j -.
(q,
c'
                                                        . _ .            ,                c'
\\*
                                                      \*                                 ~       ..,.
~
Director of Nuclear Reactor Regulation ', -                     /             17         ""Y         '
Director of Nuclear Reactor Regulation ', -
j 'O,7 7     --
/
ATTN: h!r. Dennis L. Ziemann, Chief               ' ' g 's         b," #My' ,               -
17
2 Operating Reactor Branch #2                         'y@
""Y j 'O,7 7 ATTN: h!r. Dennis L. Ziemann, Chief
                                                                    /                 R\'                .            ;
' ' g 's b," #My',
U. S. Nuclear Regulatory Commission
2
                                                                                                              . !;        Q Washington, D. C.       20555                                                                                       .
'y@
I
R\\
Operating Reactor Branch #2
/
U. S. Nuclear Regulatory Commission Q
Washington, D. C.
20555 I


==Subject:==
==Subject:==
Line 79: Line 122:


==Dear htr. Ziemann:==
==Dear htr. Ziemann:==
Your letter of January 10, 1975, transmitted model Technical Specifications
Your letter of January 10, 1975, transmitted model Technical Specifications
                                                                                                                                  ~
~
for air filtration systems to us for consideration in preparing a change to our Technical Specifications for ANO-1.               In our letter of February 7, we expressed our concerns relative to the need for such expanded Technical Specifications and did not submit the requested changes. Based on sub-sequent discussions with the NRC staff we have reconsidered our positions and have prepared the attached request for changes to the ANO-1 Technical Specifications.
for air filtration systems to us for consideration in preparing a change to our Technical Specifications for ANO-1.
The attached changes differ significantly in format from those model spec-ifications due to the need to maintain similarity with our existing Technical Specifications. Each air filtration system for which credit was taken in the ANO-1 safety analyses has been included under individual sections to avoid confusion among systems. The systems which are now included are the Control Room Emergency Air Conditioning System, the Penetration Room Ventila-tion System, the Hydrogen Purge System and the Fuel Handling Area Ventilation System. 'Ihe Radwaste Area Ventilation System is not included because it is not considered operable in any safety analyses. Deleted from the existing specifications would be the requirements related to the Reactor Building Purge System since the only assumptions made concerning that system was oper-ability of the isolation feature as noted in Specification 3.8.10 along with the bases to that specification.
In our letter of February 7, we expressed our concerns relative to the need for such expanded Technical Specifications and did not submit the requested changes.
Based on sub-sequent discussions with the NRC staff we have reconsidered our positions and have prepared the attached request for changes to the ANO-1 Technical Specifications.
The attached changes differ significantly in format from those model spec-ifications due to the need to maintain similarity with our existing Technical Specifications.
Each air filtration system for which credit was taken in the ANO-1 safety analyses has been included under individual sections to avoid confusion among systems. The systems which are now included are the Control Room Emergency Air Conditioning System, the Penetration Room Ventila-tion System, the Hydrogen Purge System and the Fuel Handling Area Ventilation System. 'Ihe Radwaste Area Ventilation System is not included because it is not considered operable in any safety analyses.
Deleted from the existing specifications would be the requirements related to the Reactor Building Purge System since the only assumptions made concerning that system was oper-ability of the isolation feature as noted in Specification 3.8.10 along with the bases to that specification.
d 13068 m
d 13068 m
                    .                                                                                  l
l


    , ,',  Mr. Dennis L. Ziemann, Chicf                             q  Novemb r 7, 1975 To aid in preparing a change package that can be more readily inserted into the existing specifications, we have included overleaves (unchanged) for pages printed on two sides. R ese pages include p. 35, 39, 59a, 89, 97, and 100. It should also be noted that the specification numbers and proposed changes are based on the existing ANO-1 Technical Specifications as revised through change number 6. Other packages previously submitted to you or to be submitted in the near future may have the same specification number or may change other specifications on the same page. Bis should be considered when any changes are issued for implementation.
Mr. Dennis L. Ziemann, Chicf Novemb r 7, 1975 q
Due to the magnitude of the testing that will be required soon after issuance of this proposed change for iglementation we wish to request a pcriod of 90 days following issuance in which to perform the initial testing.         Pleas e indicate this in your issuance letter to avoid implementation problems.
To aid in preparing a change package that can be more readily inserted into the existing specifications, we have included overleaves (unchanged) for pages printed on two sides. R ese pages include p. 35, 39, 59a, 89, 97, and 100.
It should also be noted that the specification numbers and proposed changes are based on the existing ANO-1 Technical Specifications as revised through change number 6.
Other packages previously submitted to you or to be submitted in the near future may have the same specification number or may change other specifications on the same page. Bis should be considered when any changes are issued for implementation.
Due to the magnitude of the testing that will be required soon after issuance of this proposed change for iglementation we wish to request a pcriod of 90 days following issuance in which to perform the initial testing.
Pleas e indicate this in your issuance letter to avoid implementation problems.
We will be glad to discuss this proposed change with you during your review.
We will be glad to discuss this proposed change with you during your review.
Very truly yours,
Very truly yours,
                                                            ,hy   .
,hy "J. D. Phillips Senior Vice President JDP:ay Attachment f
                                                          "J. D. Phillips #
Senior Vice President JDP:ay Attachment f
l 4
l 4
a e
a e
v   .-ww , , -,}}
v
.-ww
,, -,}}

Latest revision as of 08:50, 31 December 2024

Forwards Proposed Tech Spec Changes Re Air Filtration Sys & Requests 90 Day Period After Issuance for Initial Testing
ML19326B858
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/07/1975
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
Shared Package
ML19326B859 List:
References
13068, NUDOCS 8004180594
Download: ML19326B858 (3)


Text

"

e O

\\

d '

NRC DIS;.ilBUTION FGR PART 50 DOCKET h.,,TERI AL (TEMPORARY FORM)

CONTROL NO.

13069 FILE:

FROM: Arkansas Pouer & Light Co. DATE OF DOC DATE REC'D LTR TWX RPT OTHER Little Reck, Ark.

72203 19, nitity 11-7-75 11-14-75 XX TO:

ORIG CC OTHER SENTERC POR XX Mr. D. L. Ziemann.

I signed 39 SENT LOCAL PDR XX CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXX 40 50-313 DESCRIPTION: Ltr re our 1-10-75 ltr...requestiENCLOSURES:

Revised Tech Spec Page Changes for change to tech specs to the ANO-1 Tect to ANO-1 Tech Specs..

Specs in re cn air filtration sytems...&

trans the following:

(40 cys enc 1 rec'd)

OVe is PLANT NAME:

Ark. 1 FOR ACTION /INFC RMATION DHL 11-15-75 BUTLER (L)

SCHWENCER (L) l@lE ANN (L)

REGAN (E)

REID(L)

W/ Copies W/ Copies W

opies W/ Copies W/ COPIES CLARK (L)

STOLZ (L)

DI ER (E)

LEAR (I.)

W/ Copies W/ Copies W/ Copies W/ Copies PARR (L)

VASSALLO (L)

KNIGHTON (E)

SPIES W/ Copies W/ Copies W/ Copies -

" / Copies KNIEL (L)

PURPLE (L)

YOUNGBLOOD (E)

PitCogl/pRgd W/ Copies W/ Copies W/ Copies W/rCopies INTERNAL DISTRIBUTION TECH REVIEW DENTON LIC ASST A/T IND.

M. DIGGS (L)

$ R AITM AN. m

' PDR SCH RO E D E.R.

GRIMES R

.i thGC, ROOM P 506A MACCARY GAMMILL H. GEARIN (L SALTZMAN eCOSSICK/STAF F j<NIG HT KASTNE R E. GOULBOURNE (L)

MELTZ CASE

' FPAWLICKI BALLARD P. KREUTZER (E)

GIAMBUSSO SHAO SPANGLER J. LEE (L)

PLANS 80YD STELLO M. RU3'52R00K(L)

MCDONALD MOORE (L)

HOUSTON

_ ENVIRO S. REED (E)

CHAPMAN DEYOUNG (L)

NOVAK MULLER M. SERVICE (L)

DUBE (Ltr)

SKOVHOLT (L)

ROSS DICKER S. SHEPPAR D (L)

E. COUPE GOLLER (L) (Ltr)

IPPOLITO KNIGHTON M. SLATER (E)

PETERSON P. CO L LINS TEDESCO YOUNGBLOOD H. SMITH (L)

HARTFIELD (2)

DENISE J. COLLINS EGAN S. TEETS (L)

KLECKER TEG OPR L AllyAS T

R G. WILLI AMS (E)

EISENHUT

[lLE & REGION (2)

BENAROYA

/$

V. WILSON (L)

WIGGINTON HIPC VOLLMER H AR _ SS R. INGR "4 (L) i M. DUNCAN (a Oh EXTEriNAL DISTRIBUTION N m%

- LOCAL PDR R aussellville, Ark.

-TIC (ABERNATHY) (1)(2)(10)- NATIONAL LABS 1 - PDR SAN /LA/NY i

- NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKHAVEN NAT LAB l

i 1 - ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON ORNL l

Newton Anderson EWM ARK /BLUME/AGBABI AN l

ACRS M SENT fp g, 1

s con sa59 Y f

^

f g

s 1,L h;( fj]g N"U*++--es t

,~

m H EL PIN G BUILO ARKANSAS A AK ANS AS POWER & LIGHT COMPANY STH & LOygglANA STREE TS. LITTLE ACCK. A AK ANSAS 72203.(501)372-4311 November 7, 1975

[/.. '..-Q ',.

g7 p,,

y,,'\\

:\\

p/q.

s (q,

j -.

c'

\\*

~

Director of Nuclear Reactor Regulation ', -

/

17

""Y j 'O,7 7 ATTN: h!r. Dennis L. Ziemann, Chief

' ' g 's b," #My',

2

'y@

R\\

Operating Reactor Branch #2

/

U. S. Nuclear Regulatory Commission Q

Washington, D. C.

20555 I

Subject:

Arkansas Power 6 Light Company Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Technical Specification Change Request Air Filtration Systems

Dear htr. Ziemann:

Your letter of January 10, 1975, transmitted model Technical Specifications

~

for air filtration systems to us for consideration in preparing a change to our Technical Specifications for ANO-1.

In our letter of February 7, we expressed our concerns relative to the need for such expanded Technical Specifications and did not submit the requested changes.

Based on sub-sequent discussions with the NRC staff we have reconsidered our positions and have prepared the attached request for changes to the ANO-1 Technical Specifications.

The attached changes differ significantly in format from those model spec-ifications due to the need to maintain similarity with our existing Technical Specifications.

Each air filtration system for which credit was taken in the ANO-1 safety analyses has been included under individual sections to avoid confusion among systems. The systems which are now included are the Control Room Emergency Air Conditioning System, the Penetration Room Ventila-tion System, the Hydrogen Purge System and the Fuel Handling Area Ventilation System. 'Ihe Radwaste Area Ventilation System is not included because it is not considered operable in any safety analyses.

Deleted from the existing specifications would be the requirements related to the Reactor Building Purge System since the only assumptions made concerning that system was oper-ability of the isolation feature as noted in Specification 3.8.10 along with the bases to that specification.

d 13068 m

l

Mr. Dennis L. Ziemann, Chicf Novemb r 7, 1975 q

To aid in preparing a change package that can be more readily inserted into the existing specifications, we have included overleaves (unchanged) for pages printed on two sides. R ese pages include p. 35, 39, 59a, 89, 97, and 100.

It should also be noted that the specification numbers and proposed changes are based on the existing ANO-1 Technical Specifications as revised through change number 6.

Other packages previously submitted to you or to be submitted in the near future may have the same specification number or may change other specifications on the same page. Bis should be considered when any changes are issued for implementation.

Due to the magnitude of the testing that will be required soon after issuance of this proposed change for iglementation we wish to request a pcriod of 90 days following issuance in which to perform the initial testing.

Pleas e indicate this in your issuance letter to avoid implementation problems.

We will be glad to discuss this proposed change with you during your review.

Very truly yours,

,hy "J. D. Phillips Senior Vice President JDP:ay Attachment f