ML19338D493: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. ;   - ,                                        __- -                                                                                    .
{{#Wiki_filter:. ;
R,
R,
  - 9
.f-
          .f-       >
- 9 t
    ,                                                                                                                                                  t OPERATING DATA REPORT DOCKEINO.         50-336
OPERATING DATA REPORT DOCKEINO.
                                                                                                                    . DATE MF
50-336 DATE MF
                                                                                                          .CO3!PLETED BY - C2.H. ITOW ett '
.CO3!PLETED BY - C2.H. ITOW ett '
OPERATING STATUS :
OPERATING STATUS :
: 1. Unir Namei         Millstone 2                                   Notes
: 1. Unir Namei Millstone 2 Notes
* Items 21 & 22-,
* Items 21 & 22-,
: 2. Reporting Period:         August                                 cumulative ~ are computed
: 2. Reporting Period:
August cumulative ~ are computed
: 3. Licensed Thennal Power (31Wri: 2700 using a weighted average.
: 3. Licensed Thennal Power (31Wri: 2700 using a weighted average.
: 4. Nameplate Rating (Gross .\!We):         909
: 4. Nameplate Rating (Gross.\\!We):
: 5. Design Electrical Rating (Net .\fWe):870
909
: 5. Design Electrical Rating (Net.\\fWe):870
: 6. 31asimum Dependable Capacity (Gross 31We):' 864
_895
_895
: 6. 31asimum Dependable Capacity (Gross 31We):' 864
: 7. Stasimum Dependable Capacity (Net 31We):
: 7. Stasimum Dependable Capacity (Net 31We):
S. If Chans cut in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
S. If Chans cut in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 9. Power Lesel To Which Restricted.lf Any (Net 31We):     one 10.- Reasons For Restrictions. If Any: --None This 5fonth         ' Yr..to.Date             Cumulatise i1. Hours in Reporting Period .                           744                   5,855                   41,063
: 9. Power Lesel To Which Restricted.lf Any (Net 31We):
: 12. Number Of Hours Reactor Was Critical                   368.5                 4,276.7                 29,355.8
one 10.- Reasons For Restrictions. If Any: --None This 5fonth
: 13. Reactor Reserie Shutdown Ifours                         U                     .U                     2,0/2.4
' Yr..to.Date Cumulatise i1. Hours in Reporting Period.
: 14. Hours Generator On Line                               368.0                 4, I83.6 ~
744 5,855 41,063
0 28,003.8
: 12. Number Of Hours Reactor Was Critical 368.5 4,276.7 29,355.8
: 15. Unit Resene Shutdown Hours                                                         0
: 13. Reactor Reserie Shutdown Ifours U
                                                                                                                      ~
.U 2,0/2.4
: 16. Gross Therma! Emigy Generated O!WH)               958,023-                                               335.4 11,020,276                   68,718,904
: 14. Hours Generator On Line 368.0 4, I83.6 ~
: 17. Gross Electrical Energy Generated (>!WHI           315,545 _ ,,     3,614,072                   22,198,71/
: 15. Unit Resene Shutdown Hours 0
: 18. Net Electrical Energy Generated (31WH)             302,334           3,471,253.
0
~
28,003.8 335.4
: 16. Gross Therma! Emigy Generated O!WH) 958,023-11,020,276 68,718,904
: 17. Gross Electrical Energy Generated (>!WHI 315,545 _,,
3,614,072 22,198,71/
: 18. Net Electrical Energy Generated (31WH) 302,334 3,471,253.
21,251,511__
: 19. Unit Senice Factor--
: 19. Unit Senice Factor--
21,251,511__
-20. Unit Assi! ability Factor 49.5
_        49.5                      ~71.5                  68.2
~71.5 68.2 49.5
                  -20. Unit Assi! ability Factor                                 49.5                       71.5                 DTT 47.0
: 21. Unit Capacity Factor (Using af CC Nett 47.0
                                                                                          ~
~
: 21. Unit Capacity Factor (Using af CC Nett                                               68.6~ '"             bd . tf             .
71.5 DTT 68.6~ '"
22.- Unit Capacity Factor (U>ing DER Netl ~                   46.7                       bd.I     *
bd. tf 22.- Unit Capacity Factor (U>ing DER Netl ~
                  ~ 23. Unit Forced Outage Rate                                                                                     61.6-0                         23.6
46.7 bd.I 61.6-
                                                                  ~
~ 23. Unit Forced Outage Rate 0
23.8
23.6 23.8
                  ' 24. Shutdowns Scheduled Oser Nest 6 Stonths (Type. Date.and Duration of Each1:
' 24. Shutdowns Scheduled Oser Nest 6 Stonths (Type. Date.and Duration of Each1:
Currently =in Cycle 4 refuel outage, 1
~
Currently =in Cycle 4 refuel outage,
: 25. If Shur Down At End Of Report Period. Estimared Date of Startup: - October 18, 1980,
i
i
: 25. If Shur Down At End Of Report Period. Estimared Date of Startup: - October 18, 1980 ,
: 26. Units in Test Statu> (Prior to Commercial Operationi:
: 26. Units in Test Statu> (Prior to Commercial Operationi:
Forecast                 Achiesed INITIA L CRITICA llTY                             _ N/A                         N/A INITIA L ELECTRICITY                                   N/A                     N/A Cost \tERCI \L OPER \ TION                             N/A                   _ N/A l
Forecast Achiesed INITIA L CRITICA llTY
H en n                   !
_ N/A N/A INITIA L ELECTRICITY N/A N/A Cost \\tERCI \\L OPER \\ TION N/A
l 80092303"47:                                               ^ - " - -                                                    ' - - -
_ N/A l
H en n l
80092303"47:
^ - " - -
E_
E_
                                    '                                                          ~
~
J
J


yy-                                    , . - . .=                   -        .-
,. -..=
l a
yy-l a
t.*.                                                           ~
t.*.
    ~
~
AVER AGE D ril UNITPOWER LEVEL .
~
DOCKET NO.
AVER AGE D ril UNITPOWER LEVEL.
50-336 Millstone 2
50-336 DOCKET NO.
                                                                                                                                        ~
Millstone 2
                                                                                                  .              UNIT _
~
DATE    9/2/80l CO\fPLETED BY-      G.H. Howlett--       .
UNIT _
TELEPHONE ' :(203)447-1791X364 -
9/2/80l DATE G.H. Howlett--
CO\\fPLETED BY-TELEPHONE ' :(203)447-1791X364 -
SloNTH IAugust 1980-DAY-
SloNTH IAugust 1980-DAY-
                                  . AVERAGE DAILY POWER LEVEL                       DAY (SiWr Net)                         AVERAGE DAILY POWER LEVEL 857                                             (MWe Net) 3 37            0-   (-6) 2                           857                                             0     (-5) gg 3                          857:
. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (SiWr Net) 857 (MWe Net) 3 0-(-6) 37 2
19          0     (-5) 4                         857 20
857 0
: 0.   (-4) 5                         858
(-5) gg 857:
                  ,                                                                  21            0    (-4) 6                         857
3 0
                                                ~
(-5) 19 857 4
22           0     (-4) 7-                       856 23            0     (-4) 8                       - 856 24           0     (-4)'
0.
9                         854 25           0   ~( 4) 10                       - 854-26           0-   -(-4) 31                         818                                                                                             l 27           0     (.-4 )
(-4) 20 5
12                         632' 2S           0     (. 4)                                   l
858 0
                    -13                           788                                                                                             l 29           0     (.4) 14                          838' 30            0     (-5)'                                 l
(-4) 21 6
"                      15                         854                                                                                         :l 31           0     (.5) 16-                         171 I
857
                                                                                                                                                ~!
~
INSTRUCTIONS Onnearest the    this form'21.!ist whole megawatt.        the averale daily unit power leselin MWe-Net for each day in the repo     -
22 0
(-4) 7-856 0
(-4) 23 8
- 856 24 0
(-4)'
9 854 25 0
~( 4) 10
- 854-26 0-
-(-4) 31 818 27 0
(.-4 )
12 632' 2S 0
(. 4)
-13 788 29 0
(.4) 838' l
14 0
(-5)'
30 15 854
:l 31 0
(.5) 16-171
~
INSTRUCTIONS On this form'21.!ist the averale daily unit power leselin MWe-Net for each day in the repo the nearest whole megawatt.
19 G 7 )
19 G 7 )
,'          -- ''                          s ,
s,


F d )
F d
I  KE
)
                                                                                                                            '50-336 UNIT SilUTDOWNS AND POWER REDUCTIONS                             '
'50-336 UNIT SilUTDOWNS AND POWER REDUCTIONS I
1 NAME. Miilstone 2--
KE 1 NAME. Miilstone 2--
DATE       9/4/80 REPORT MONTil August                     COMPLETED BY         G.H. Howlett ELEPHONE       (2UdI447-l7.qX364
DATE 9/4/80 REPORT MONTil August COMPLETED BY G.H. Howlett ELEPHONE (2UdI447-l7.qX364 "b
                                                  -    "b                           y No.      Date g
y
                                      .!Y j
.!Y )
                                            )    $ .Y 5 g5 Ucensee Event
$.Y 5 Ucensee
                                                                            .E%
.E%
p      %                  . Cause & Corrective Action to o ::. a:  ga             Report #   in U   g{                  Prevent Recurrence 6
. Cause & Corrective No.
          '12 800811       F       0   -H   N/A         LER 80-28     RB   CRDDRVE Dropped C.E.A. #41 forced a power reduction ( 70%) per specs. Upon retrieval of C.E.A. #41 a seconct L.E.A. #65 dropped. The apparent cause was due to a. faulty jumper cable         .
Date g
The rod was realigned,with' subsequent nonnal power operations.
j g5 Event p
g{
Action to ga Report #
in U Prevent Recurrence o ::.
a:
6
'12 800811 F
0
-H N/A LER 80-28 RB CRDDRVE Dropped C.E.A. #41 forced a power reduction ( 70%) per specs. Upon retrieval of C.E.A. #41 a seconct L.E.A. #65 dropped. The apparent cause was due to a. faulty jumper cable The rod was realigned,with' subsequent nonnal power operations.
A checkout of the complete cabling system is scheduled during the cycle 4 refuel outage.
A checkout of the complete cabling system is scheduled during the cycle 4 refuel outage.
13   800816       S     376     C     1                                     Commenced Cycle 4 refuel outage.
13 800816 S
Summary:     The unit operated.at or near 100% rated thermal power except for the down po.fer on the lith for dropped C.E. A. 's and the shutdown for cycle 4 refueling.
376 C
(9/77)                                                           ,
1 Commenced Cycle 4 refuel outage.
Summary:
The unit operated.at or near 100% rated thermal power except for the down po.fer on the lith for dropped C.E. A. 's and the shutdown for cycle 4 refueling.
(9/77)


Dock:;t No. . 50-336-
Dock:;t No..
    ~-*                                                            'Date:' S:ptemoer iI, I20
50-336-
  ,-                                                                 Completed By: G.H. Howlett III Telephon : 203/447-1971 X364
'Date:' S:ptemoer iI, I20
                                      -REFUELING INFORMATION REQUEST
~-*
: 1. Name of facility:     Millstone 2
Completed By: G.H. Howlett III Telephon : 203/447-1971 X364
: 2. Scheduled date for next refueling shutdown:
-REFUELING INFORMATION REQUEST 1.
Name of facility:
Millstone 2 2.
Scheduled date for next refueling shutdown:
Consnenced refuel outage August 16, 1980.
Consnenced refuel outage August 16, 1980.
: 3. Schedule date for restart following-refueling:-October 18, 1980
3.
: 4. Will refueling or' resumption of operation thereafter require a technical specification change or other license amendment?
Schedule date for restart following-refueling:-October 18, 1980 4.
Will refueling or' resumption of operation thereafter require a technical specification change or other license amendment?
Technical Specification changes will be necessary as a result of the change in fuel and safety analysis supplier.
Technical Specification changes will be necessary as a result of the change in fuel and safety analysis supplier.
: 5. Scheduled date(s) for submitting licensing action and supporting infornation:
5.
Scheduled date(s) for submitting licensing action and supporting infornation:
The schedule far subm;mng license action is as follows:
The schedule far subm;mng license action is as follows:
Basic Safety-Report       3-6-80.
Basic Safety-Report 3-6-80.
Additional licensing documentation in support of cycle four (4) operation will be provided in response to Nuclear Regulatory-Commission staff questions.
Additional licensing documentation in support of cycle four (4) operation will be provided in response to Nuclear Regulatory-Commission staff questions.
        - 6. Important licensing considerations associated with refueling, e.g., new or         .
- 6.
dif'erent fuel design or supplier, unreviewed design'or performance analysis         '
Important licensing considerations associated with refueling, e.g., new or dif'erent fuel design or supplier, unreviewed design'or performance analysis methods, significant changes in fuel design, new operating procedures.
methods, significant changes in fuel design, new operating procedures.
Cycle 4 will be unique in that it will be the first where the fuel l
Cycle 4 will be unique in that it will be the first where the fuel                   l and safety analysis will be supplied by Westinghouse.
and safety analysis will be supplied by Westinghouse.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:                                                                         1
7.
                        ~
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core:         217                       (b)     144
1 (a) In Core:
: 8. The present licensed ~ spent fuel pool storage capacity and the size of any increase in licensed storage cape. city that has been requested or is planned,
217 (b) 144
              . in number of fuel assemblies:                                                         i 667 9.
~
8.
The present licensed ~ spent fuel pool storage capacity and the size of any increase in licensed storage cape. city that has been requested or is planned,
. in number of fuel assemblies:
i 667 9.
The projected date of the last' refueling that can be discharged to the spent fuel pool assuming the presert licensed capacity:
The projected date of the last' refueling that can be discharged to the spent fuel pool assuming the presert licensed capacity:
1985, Spent Fuel Pool, full core off load capability is reached.
1985, Spent Fuel Pool, full core off load capability is reached.
Line 140: Line 194:


Dockst No. 50-336-
Dockst No. 50-336-
      ~ Pag 2 of-                                                                                                                                           Date       Teptemoer it, ivuu ~
~ Pag 2 of-Date Teptemoer it, ivuu
3 Unit Name utiistnn, p-Completed By G.'H Howlett Telephone (2031447-1791 X364 CORRECTIVE MAINTENANCE -SUPNARY FOR SAFETY RELATED EQUIPMENT Report Month July 1980 DATE'-         3YSTEM                                                                                                 COMPONENT                           MAINTENANCE ACTION 7/1/80                                                                                                                                     No major corrective maintenance-was reported-7/31/80-                                                                                                                                   during'this time period.
~
3 Unit Name utiistnn, p-Completed By G.'H Howlett Telephone (2031447-1791 X364 CORRECTIVE MAINTENANCE -SUPNARY FOR SAFETY RELATED EQUIPMENT Report Month July 1980 DATE'-
3YSTEM COMPONENT MAINTENANCE ACTION 7/1/80 No major corrective maintenance-was reported-7/31/80-during'this time period.
e I
e I
_ _ _ _ . . _ . _ _ _ _ . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _              _ _ _ _}}
.}}

Latest revision as of 15:31, 25 December 2024

Monthly Operating Rept for Aug 1980
ML19338D493
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/03/1980
From: Howlett G
NORTHEAST UTILITIES
To:
Shared Package
ML19338D492 List:
References
NUDOCS 8009230347
Download: ML19338D493 (5)


Text

. ;

R,

.f-

- 9 t

OPERATING DATA REPORT DOCKEINO.

50-336 DATE MF

.CO3!PLETED BY - C2.H. ITOW ett '

OPERATING STATUS :

1. Unir Namei Millstone 2 Notes
  • Items 21 & 22-,
2. Reporting Period:

August cumulative ~ are computed

3. Licensed Thennal Power (31Wri: 2700 using a weighted average.
4. Nameplate Rating (Gross.\\!We):

909

5. Design Electrical Rating (Net.\\fWe):870
6. 31asimum Dependable Capacity (Gross 31We):' 864

_895

7. Stasimum Dependable Capacity (Net 31We):

S. If Chans cut in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Lesel To Which Restricted.lf Any (Net 31We):

one 10.- Reasons For Restrictions. If Any: --None This 5fonth

' Yr..to.Date Cumulatise i1. Hours in Reporting Period.

744 5,855 41,063

12. Number Of Hours Reactor Was Critical 368.5 4,276.7 29,355.8
13. Reactor Reserie Shutdown Ifours U

.U 2,0/2.4

14. Hours Generator On Line 368.0 4, I83.6 ~
15. Unit Resene Shutdown Hours 0

0

~

28,003.8 335.4

16. Gross Therma! Emigy Generated O!WH) 958,023-11,020,276 68,718,904
17. Gross Electrical Energy Generated (>!WHI 315,545 _,,

3,614,072 22,198,71/

18. Net Electrical Energy Generated (31WH) 302,334 3,471,253.

21,251,511__

19. Unit Senice Factor--

-20. Unit Assi! ability Factor 49.5

~71.5 68.2 49.5

21. Unit Capacity Factor (Using af CC Nett 47.0

~

71.5 DTT 68.6~ '"

bd. tf 22.- Unit Capacity Factor (U>ing DER Netl ~

46.7 bd.I 61.6-

~ 23. Unit Forced Outage Rate 0

23.6 23.8

' 24. Shutdowns Scheduled Oser Nest 6 Stonths (Type. Date.and Duration of Each1:

~

Currently =in Cycle 4 refuel outage,

25. If Shur Down At End Of Report Period. Estimared Date of Startup: - October 18, 1980,

i

26. Units in Test Statu> (Prior to Commercial Operationi:

Forecast Achiesed INITIA L CRITICA llTY

_ N/A N/A INITIA L ELECTRICITY N/A N/A Cost \\tERCI \\L OPER \\ TION N/A

_ N/A l

H en n l

80092303"47:

^ - " - -

E_

~

J

,. -..=

yy-l a

t.*.

~

~

AVER AGE D ril UNITPOWER LEVEL.

50-336 DOCKET NO.

Millstone 2

~

UNIT _

9/2/80l DATE G.H. Howlett--

CO\\fPLETED BY-TELEPHONE ' :(203)447-1791X364 -

SloNTH IAugust 1980-DAY-

. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (SiWr Net) 857 (MWe Net) 3 0-(-6) 37 2

857 0

(-5) gg 857:

3 0

(-5) 19 857 4

0.

(-4) 20 5

858 0

(-4) 21 6

857

~

22 0

(-4) 7-856 0

(-4) 23 8

- 856 24 0

(-4)'

9 854 25 0

~( 4) 10

- 854-26 0-

-(-4) 31 818 27 0

(.-4 )

12 632' 2S 0

(. 4)

-13 788 29 0

(.4) 838' l

14 0

(-5)'

30 15 854

l 31 0

(.5)16-171

~

INSTRUCTIONS On this form'21.!ist the averale daily unit power leselin MWe-Net for each day in the repo the nearest whole megawatt.

19 G 7 )

s,

F d

)

'50-336 UNIT SilUTDOWNS AND POWER REDUCTIONS I

KE 1 NAME. Miilstone 2--

DATE 9/4/80 REPORT MONTil August COMPLETED BY G.H. Howlett ELEPHONE (2UdI447-l7.qX364 "b

y

.!Y )

$.Y 5 Ucensee

.E%

. Cause & Corrective No.

Date g

j g5 Event p

g{

Action to ga Report #

in U Prevent Recurrence o ::.

a:

6

'12 800811 F

0

-H N/A LER 80-28 RB CRDDRVE Dropped C.E.A. #41 forced a power reduction ( 70%) per specs. Upon retrieval of C.E.A. #41 a seconct L.E.A. #65 dropped. The apparent cause was due to a. faulty jumper cable The rod was realigned,with' subsequent nonnal power operations.

A checkout of the complete cabling system is scheduled during the cycle 4 refuel outage.

13 800816 S

376 C

1 Commenced Cycle 4 refuel outage.

Summary:

The unit operated.at or near 100% rated thermal power except for the down po.fer on the lith for dropped C.E. A. 's and the shutdown for cycle 4 refueling.

(9/77)

Dock:;t No..

50-336-

'Date:' S:ptemoer iI, I20

~-*

Completed By: G.H. Howlett III Telephon : 203/447-1971 X364

-REFUELING INFORMATION REQUEST 1.

Name of facility:

Millstone 2 2.

Scheduled date for next refueling shutdown:

Consnenced refuel outage August 16, 1980.

3.

Schedule date for restart following-refueling:-October 18, 1980 4.

Will refueling or' resumption of operation thereafter require a technical specification change or other license amendment?

Technical Specification changes will be necessary as a result of the change in fuel and safety analysis supplier.

5.

Scheduled date(s) for submitting licensing action and supporting infornation:

The schedule far subm;mng license action is as follows:

Basic Safety-Report 3-6-80.

Additional licensing documentation in support of cycle four (4) operation will be provided in response to Nuclear Regulatory-Commission staff questions.

- 6.

Important licensing considerations associated with refueling, e.g., new or dif'erent fuel design or supplier, unreviewed design'or performance analysis methods, significant changes in fuel design, new operating procedures.

Cycle 4 will be unique in that it will be the first where the fuel l

and safety analysis will be supplied by Westinghouse.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

1 (a) In Core:

217 (b) 144

~

8.

The present licensed ~ spent fuel pool storage capacity and the size of any increase in licensed storage cape. city that has been requested or is planned,

. in number of fuel assemblies:

i 667 9.

The projected date of the last' refueling that can be discharged to the spent fuel pool assuming the presert licensed capacity:

1985, Spent Fuel Pool, full core off load capability is reached.

1987, Core Full, Spent Fuel Pool contains 648 bundles.

R

Dockst No. 50-336-

~ Pag 2 of-Date Teptemoer it, ivuu

~

3 Unit Name utiistnn, p-Completed By G.'H Howlett Telephone (2031447-1791 X364 CORRECTIVE MAINTENANCE -SUPNARY FOR SAFETY RELATED EQUIPMENT Report Month July 1980 DATE'-

3YSTEM COMPONENT MAINTENANCE ACTION 7/1/80 No major corrective maintenance-was reported-7/31/80-during'this time period.

e I

.