ML19344E180: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 19: Line 19:
bec to DAC:ADM:
bec to DAC:ADM:
CENTRAL FILES
CENTRAL FILES
                                                        \
\\
PDR:HQ LPDR           ,
PDR:HQ LPDR M
M NSIC PUBLIC SERVICE COMPANY OF COLOR                                               -
NSIC PUBLIC SERVICE COMPANY OF COLOR P.
P. O. 5OX 840   . DENVER, C O t,O R A O O 802O OSCAR R. LEE                                                               Ju1y 22, 1980 vice -esier r                                                           Fort St. Vrain Unit No. 1 P-80224 Mr. Karl V. Seyfrit U. S. Nuclear Regulatory Commission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 Occket No. 50-267
O.
5OX 840 DENVER, C O t,O R A O O 802O OSCAR R. LEE Ju1y 22, 1980 vice -esier r Fort St. Vrain Unit No. 1 P-80224 Mr. Karl V. Seyfrit U. S. Nuclear Regulatory Commission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 Occket No. 50-267


==REFERENCE:==
==REFERENCE:==
Line 28: Line 29:


==Dear Mr. Seyfrit:==
==Dear Mr. Seyfrit:==
 
We have determined tnat no Rosemount Inc. model numbers 1151 or 1152 pressure transmitters with A or D output codes are installed, or planned, for Fort St. Vrain.
We have determined tnat no Rosemount Inc. model numbers 1151 or 1152 pressure transmitters with A or D output codes are installed, or i
i The Rosemount transmitters, numbers 1151 or 1152, that are installed, use B and E output codes, do not have safety-related functions, and have exhibited none of the behavior described in Bulletin 30-16.
planned, for Fort St. Vrain.
The Rosemount transmitters, numbers 1151 or 1152, that are installed, use B and E output codes, do not have safety-related functions, and have exhibited none of the behavior described in Bulletin 30-16.
Investigation and preparation of this report required four manhours.
Investigation and preparation of this report required four manhours.
We plan no further action.
We plan no further action.
Very truly yours,
Very truly yours,
                                                            /E4cw /fd4L 0' scar R. Lee Vice President                                     '
/E4cw /fd4L 0' scar R. Lee Vice President ORL/alk cc:
ORL/alk cc:   U. S. NRC, Director of Reactor Construction Inspection, 0.I.E.
U. S. NRC, Director of Reactor Construction Inspection, 0.I.E.
                        >800828 von                                           .    -}}
>800828 von
-}}

Latest revision as of 11:09, 24 December 2024

Responds to IE Bulletin 80-16.Util Determined That No Rosemount Model 1151 or 1152 Pressure Transmitters W/A or D Output Codes Installed in Facility.No Further Action Planned
ML19344E180
Person / Time
Site: Fort Saint Vrain 
Issue date: 07/22/1980
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-80-16, P-80224, NUDOCS 8008280009
Download: ML19344E180 (1)


Text

bec to DAC:ADM:

CENTRAL FILES

\\

PDR:HQ LPDR M

NSIC PUBLIC SERVICE COMPANY OF COLOR P.

O.

5OX 840 DENVER, C O t,O R A O O 802O OSCAR R. LEE Ju1y 22, 1980 vice -esier r Fort St. Vrain Unit No. 1 P-80224 Mr. Karl V. Seyfrit U. S. Nuclear Regulatory Commission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 Occket No. 50-267

REFERENCE:

I & E Bulletin 80-16

Dear Mr. Seyfrit:

We have determined tnat no Rosemount Inc. model numbers 1151 or 1152 pressure transmitters with A or D output codes are installed, or planned, for Fort St. Vrain.

i The Rosemount transmitters, numbers 1151 or 1152, that are installed, use B and E output codes, do not have safety-related functions, and have exhibited none of the behavior described in Bulletin 30-16.

Investigation and preparation of this report required four manhours.

We plan no further action.

Very truly yours,

/E4cw /fd4L 0' scar R. Lee Vice President ORL/alk cc:

U. S. NRC, Director of Reactor Construction Inspection, 0.I.E.

>800828 von

-