NRC-89-0227, Forwards Rev 1 to Safety Evaluation 89-0098 Re Control Ctr HVAC Ductwork,Per J Stang Request at 891025 Meeting.Safety Evaluation Written for Plant Configuration of Control Ctr HVAC & Standby Gas Treatment Sys Ductwork: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:gv     ,
{{#Wiki_filter:q gv 4-l UdN?i[3*"
q 4-l     '          '
Detroit
UdN?i[3*"
,,,,ni e MlSOn HE9F" r
Detroit         ,,,,ni e p      MlSOn HE9F"                                                                       r 8;',% .
8;',%.
I                                                                       November 3, 1989 N10-09-0227 U. S. Ibclear Regulatory Ccanission Attn     Docunent Control Desk Washington, D. C. 20555
p I
November 3, 1989 N10-09-0227 U. S. Ibclear Regulatory Ccanission Attn Docunent Control Desk Washington, D. C.
20555


==References:==
==References:==
Line 29: Line 31:


==Subject:==
==Subject:==
Control Center Ikating, Ventilation and Air CoMitioning S_ yrtam (CCINAC) Duetwork On October 25, 1989, a meeting was held at NIC Ibadquarters on the Fermi 2 Control Center Heating Ventilating and Air CoMitioning Systern (CCINAC) . One of the topics discussed was the structural analysis of the ductwork performed as a result of LER 89-010-00. 'he analysis concluded that the ductwork is fully capable of performing as an energency filtration flow path for all operational con 3itions. Mr.
Control Center Ikating, Ventilation and Air CoMitioning S_ yrtam (CCINAC) Duetwork On October 25, 1989, a meeting was held at NIC Ibadquarters on the Fermi 2 Control Center Heating Ventilating and Air CoMitioning Systern (CCINAC). One of the topics discussed was the structural analysis of the ductwork performed as a result of LER 89-010-00. 'he analysis concluded that the ductwork is fully capable of performing as an energency filtration flow path for all operational con 3itions. Mr.
John Stang, NIC Project Manager, requested that Detroit R31 son formally submit the safety evaluation which was perforned on the ductwork condition. The supporting analysis has been previously provided to him and is available onsite. Attached is a copy of Safety Evaluation SE 89-0098, Revision 1, per his request.
John Stang, NIC Project Manager, requested that Detroit R31 son formally submit the safety evaluation which was perforned on the ductwork condition. The supporting analysis has been previously provided to him and is available onsite. Attached is a copy of Safety Evaluation SE 89-0098, Revision 1, per his request.
If there are any questions, please contact Lynne Goodman at (313) 586-4211.
If there are any questions, please contact Lynne Goodman at (313) 586-4211.
Sincerely, Attachnent ec:   A. B. Davis                                                     (
Sincerely, Attachnent ec:
R..C. Knop W. G. Pogers J..F. Stang g      1 I   )
A. B. Davis
8911090304 991103 PDR     ADOCK 05000341 P                     PNU
(
_ .}}
R..C. Knop W. G. Pogers g
J..F. Stang 1
I )
8911090304 991103 PDR ADOCK 05000341 P
PNU
.}}

Latest revision as of 17:36, 23 December 2024

Forwards Rev 1 to Safety Evaluation 89-0098 Re Control Ctr HVAC Ductwork,Per J Stang Request at 891025 Meeting.Safety Evaluation Written for Plant Configuration of Control Ctr HVAC & Standby Gas Treatment Sys Ductwork
ML19354D478
Person / Time
Site: Fermi 
Issue date: 11/03/1989
From: Gipson D
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19354D479 List:
References
CON-NRC-89-0227, CON-NRC-89-227 NUDOCS 8911090304
Download: ML19354D478 (1)


Text

q gv 4-l UdN?i[3*"

Detroit

,,,,ni e MlSOn HE9F" r

8;',%.

p I

November 3, 1989 N10-09-0227 U. S. Ibclear Regulatory Ccanission Attn Docunent Control Desk Washington, D. C.

20555

References:

1) Fermi 2 NIC Docket No. 50-341 NIC License Ib. IFF-43
2) Detroit Riison letter, NIC-89-0075, IER 89-010-00, dated May 22, 1989

Subject:

Control Center Ikating, Ventilation and Air CoMitioning S_ yrtam (CCINAC) Duetwork On October 25, 1989, a meeting was held at NIC Ibadquarters on the Fermi 2 Control Center Heating Ventilating and Air CoMitioning Systern (CCINAC). One of the topics discussed was the structural analysis of the ductwork performed as a result of LER 89-010-00. 'he analysis concluded that the ductwork is fully capable of performing as an energency filtration flow path for all operational con 3itions. Mr.

John Stang, NIC Project Manager, requested that Detroit R31 son formally submit the safety evaluation which was perforned on the ductwork condition. The supporting analysis has been previously provided to him and is available onsite. Attached is a copy of Safety Evaluation SE 89-0098, Revision 1, per his request.

If there are any questions, please contact Lynne Goodman at (313) 586-4211.