| Line 13: | Line 13: | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 1 | | page count = 1 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:TOLEDO Docket Nos. 50-500, 50-501 | {{#Wiki_filter:TOLEDO EDISON Docket Nos. 50-500, 50-501 Serial No. 2-144 Acmao P Caouse O'[.7" November 17, 1980 m as u m b | ||
Mr. Harold Denton | Mr. Harold Denton Q | ||
U. S. Nuclear Regulatory Commission | Office of Nuclear Reactor Regulation j~ | ||
Washington, D. C. | U. S. Nuclear Regulatory Commission Q | ||
m | Washington, D. C. | ||
20555 E;p m | |||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
r-5 | r-5 ES 5 | ||
Y g}~ | |||
By letters dated January 24, 1980 and January 29, 1980, counsel u for the companies in the Central Area Power Coordinating Group | *n By letters dated January 24, 1980 and January 29, 1980, counsel u for the companies in the Central Area Power Coordinating Group | ||
("The CAPC0 companies"), co-owners of the Davis-Besse Nuclear Power Station, Units 2 and 3, notified the Chairman of the Atomic Safety and Licensing Appeal Board Panel and the Secretary of the Nuclear Regulatory Commission, respectively, of the CAPC0 companies' decision to cancel plans for those units. The letter to the Atomic Safety and Licensing Appeal Board Panel requested that the Appeal Board terminate any further proceed-ings in those dockets. | ("The CAPC0 companies"), co-owners of the Davis-Besse Nuclear Power Station, Units 2 and 3, notified the Chairman of the Atomic Safety and Licensing Appeal Board Panel and the Secretary of the Nuclear Regulatory Commission, respectively, of the CAPC0 companies' decision to cancel plans for those units. The letter to the Atomic Safety and Licensing Appeal Board Panel requested that the Appeal Board terminate any further proceed-ings in those dockets. | ||
In light of the decision to cancel plans fo- Davis-Besse Units 2 and 3, the CAPCO companies hereby withdraw their joint Application for Licenses before the Nuclear Regulatory Commi-sion. To the extent that action by the Atomic Safety and Licensing Board, Atomic Safety and Licensing Appeal Board, or Commission is required for this withdrawal to become effective, this letter requests that such action be promptly taken. | In light of the decision to cancel plans fo-Davis-Besse Units 2 and 3, the CAPCO companies hereby withdraw their joint Application for Licenses before the Nuclear Regulatory Commi-sion. To the extent that action by the Atomic Safety and Licensing Board, Atomic Safety and Licensing Appeal Board, or Commission is required for this withdrawal to become effective, this letter requests that such action be promptly taken. | ||
Very truly yours, | Very truly yours, | ||
/ /cJ: | |||
Subscribed a0d sworn to | before me this Seventeenth Subscribed a0d sworn to day of November, 1980. | ||
RPC:TJM: sic | RPC:TJM: sic m | ||
[h M '[ | |||
Dr. David L Hetrick | cc: | ||
Dr. Cadet H. Hand, Jr. | Samuel J. Chilk Alan S. Rosenthal, Esquire Dr. David L Hetrick Dr. Cadet H. Hand, Jr. | ||
LINCA L. CCSTI'_C Majorie Ulman Rothschild, Esquire a y C du b sI cY E b s e | |||
, 902 Docketing and Service Section | |||
%ool s | |||
lYO An: | lYO An: | ||
H. nb THE TOLEDO EDISON COMPANY | H. nb THE TOLEDO EDISON COMPANY ECISCN PLAZA 300 MACISCN AVENUE TCLECO, CHIO 43S52 80112106/5 | ||
//}} | |||
Latest revision as of 16:00, 23 December 2024
| ML20002A811 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/17/1980 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| 2-144, NUDOCS 8011210615 | |
| Download: ML20002A811 (1) | |
Text
TOLEDO EDISON Docket Nos. 50-500, 50-501 Serial No. 2-144 Acmao P Caouse O'[.7" November 17, 1980 m as u m b
Mr. Harold Denton Q
Office of Nuclear Reactor Regulation j~
U. S. Nuclear Regulatory Commission Q
Washington, D. C.
20555 E;p m
Dear Mr. Denton:
r-5 ES 5
Y g}~
- n By letters dated January 24, 1980 and January 29, 1980, counsel u for the companies in the Central Area Power Coordinating Group
("The CAPC0 companies"), co-owners of the Davis-Besse Nuclear Power Station, Units 2 and 3, notified the Chairman of the Atomic Safety and Licensing Appeal Board Panel and the Secretary of the Nuclear Regulatory Commission, respectively, of the CAPC0 companies' decision to cancel plans for those units. The letter to the Atomic Safety and Licensing Appeal Board Panel requested that the Appeal Board terminate any further proceed-ings in those dockets.
In light of the decision to cancel plans fo-Davis-Besse Units 2 and 3, the CAPCO companies hereby withdraw their joint Application for Licenses before the Nuclear Regulatory Commi-sion. To the extent that action by the Atomic Safety and Licensing Board, Atomic Safety and Licensing Appeal Board, or Commission is required for this withdrawal to become effective, this letter requests that such action be promptly taken.
Very truly yours,
/ /cJ:
before me this Seventeenth Subscribed a0d sworn to day of November, 1980.
RPC:TJM: sic m
[h M '[
cc:
Samuel J. Chilk Alan S. Rosenthal, Esquire Dr. David L Hetrick Dr. Cadet H. Hand, Jr.
LINCA L. CCSTI'_C Majorie Ulman Rothschild, Esquire a y C du b sI cY E b s e
, 902 Docketing and Service Section
%ool s
lYO An:
H. nb THE TOLEDO EDISON COMPANY ECISCN PLAZA 300 MACISCN AVENUE TCLECO, CHIO 43S52 80112106/5
//