ML20002E153: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
G:crge Power Cor,pery Post Off:cs Com 442 Bailey. Georg:a 31513 Teleonone 912 367-7781 912 537-9444 Eawin 1. Hatch Nuclear Plant                                 Georgia Power the sa#wn entic system January 10, 1981 PM-81-5 PLANT E. I. HATCH NRC Monthly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission                         .
G:crge Power Cor,pery Post Off:cs Com 442 Bailey. Georg:a 31513 Teleonone 912 367-7781 912 537-9444 Georgia Power Eawin 1. Hatch Nuclear Plant the sa#wn entic system January 10, 1981 PM-81-5 PLANT E.
Washington, D. C. 20555
I. HATCH NRC Monthly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.
20555


==Dear Sir:==
==Dear Sir:==
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2, Docket #50-366.
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2, Docket #50-366.
LAn c '
LAn c '
si- L u t; "Mfnahrf Plant Manager)
si L u t; "Mfnahrf Plant Manager)
CLC/pebc 0
CLC/pebc 0
                          -                                                              f05 81033605454                                                                                 ql}}
f05 81033605454 ql}}

Latest revision as of 15:14, 23 December 2024

Forwards Monthly Operating Rept for Dec 1980
ML20002E153
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/10/1981
From: Manry M
GEORGIA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20002E154 List:
References
PM-81-5, NUDOCS 8101260525
Download: ML20002E153 (1)


Text

.

G:crge Power Cor,pery Post Off:cs Com 442 Bailey. Georg:a 31513 Teleonone 912 367-7781 912 537-9444 Georgia Power Eawin 1. Hatch Nuclear Plant the sa#wn entic system January 10, 1981 PM-81-5 PLANT E.

I. HATCH NRC Monthly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2, Docket #50-366.

LAn c '

si L u t; "Mfnahrf Plant Manager)

CLC/pebc 0

f05 81033605454 ql