{{#Wiki_filter:Y/0 Commonwealth Edison v Or.e First National Plaza. Chicago. Illinors Address Reply to: Post Office Box 767 e   Chicago. Ilknois 60690 April 16, 1981 s (D   @
{{#Wiki_filter:Y/0 Commonwealth Edison v
Mr. James G. Keppler, Director Directorate of Inspection and
Or.e First National Plaza. Chicago. Illinors Address Reply to: Post Office Box 767 e
                                                                                    //     I/
Chicago. Ilknois 60690 April 16, 1981 s (D Mr. James G. Keppler, Director
Enforcement - Region III p
//
MRg     I h '9{  T U.S. Nuclear Regulatory Commission                                     "., 4       IS8/w 0 799 Roosevelt Road                                                       g     %*'c%g Glen Ellyn, IL         60137 f}
I/I h '9{
Directorate of Inspection and p
Enforcement - Region III MRg T
U.S. Nuclear Regulatory Commission 4
IS8/w 0 799 Roosevelt Road g
%*'c%g Glen Ellyn, IL 60137 f}


==Subject:==
==Subject:==
Byron Station Units 1 and 2                         _    (a Braidwood Station Units 1 and 2 Supplemental Response to IE Bulletin 80-23
Byron Station Units 1 and 2 (a
                                  " Failures of Solenoid Valves Manufactured By Valcor Engineering Coporation" NRC Docket Nos. 50-454/455 and 50-456/457 Reference (a):           T. J. Rausch letter to J. G. Xeppler dated February 11, 1981
Braidwood Station Units 1 and 2 Supplemental Response to IE Bulletin 80-23
" Failures of Solenoid Valves Manufactured By Valcor Engineering Coporation" NRC Docket Nos. 50-454/455 and 50-456/457 Reference (a):
T. J. Rausch letter to J. G. Xeppler dated February 11, 1981


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
 
Commonwealth Edison Company provided in Reference (a) our response to IE Bulletin 80-23 for Byron Units 1 and 2 and Braidwood Units 1 ana 2.
Commonwealth Edison Company provided in Reference (a) our response to IE Bulletin 80-23 for Byron Units 1 and 2 and Braidwood Units 1 ana 2.         In that response we indicated our intent to replace certain Valcor solenoid valve coils at these stations and that our schedule was to have repl6 cement completed by April 16, 1981.                                 This letter is to advise you that our schedule now is to have coil replacement completed by June, 1981.
In that response we indicated our intent to replace certain Valcor solenoid valve coils at these stations and that our schedule was to have repl6 cement completed by April 16, 1981.
This letter is to advise you that our schedule now is to have coil replacement completed by June, 1981.
Please address any questions you may have concerning this matter to this office.
Please address any questions you may have concerning this matter to this office.
I                                                             Very truly yours, h&h             W Thomas J. Rausch Nuclear Licensing Administrator i                                                             Special Projects l   cc:   Director, Division of Reactor Operations Inspection, Washington, DC 2372B l
I Very truly yours, h&h W
G   8105060 0 26
Thomas J. Rausch Nuclear Licensing Administrator i
                                                                                                    'APR 2 01981}}
Special Projects l
cc:
Director, Division of Reactor Operations Inspection, Washington, DC 2372B l
G 8105060 0 26
'APR 2 01981}}

Latest revision as of 12:02, 23 December 2024

Suppls Response to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Replacement Schedule Re Valcor Solenoid Valve Coils Revised to Reflect June 1981 Completion Date
ML20003H460
Person / Time
Site: Byron, Braidwood  
Issue date: 04/16/1981
From: Rausch T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-80-23, NUDOCS 8105060026
Download: ML20003H460 (1)


Text

Y/0 Commonwealth Edison v

Or.e First National Plaza. Chicago. Illinors Address Reply to: Post Office Box 767 e

Chicago. Ilknois 60690 April 16, 1981 s (D Mr. James G. Keppler, Director

//

I/I h '9{

Directorate of Inspection and p

Enforcement - Region III MRg T

U.S. Nuclear Regulatory Commission 4

IS8/w 0 799 Roosevelt Road g

%*'c%g Glen Ellyn, IL 60137 f}

Subject:

Byron Station Units 1 and 2 (a

Braidwood Station Units 1 and 2 Supplemental Response to IE Bulletin 80-23

" Failures of Solenoid Valves Manufactured By Valcor Engineering Coporation" NRC Docket Nos. 50-454/455 and 50-456/457 Reference (a):

T. J. Rausch letter to J. G. Xeppler dated February 11, 1981

Dear Mr. Keppler:

Commonwealth Edison Company provided in Reference (a) our response to IE Bulletin 80-23 for Byron Units 1 and 2 and Braidwood Units 1 ana 2.

In that response we indicated our intent to replace certain Valcor solenoid valve coils at these stations and that our schedule was to have repl6 cement completed by April 16, 1981.

This letter is to advise you that our schedule now is to have coil replacement completed by June, 1981.

Please address any questions you may have concerning this matter to this office.

I Very truly yours, h&h W

Thomas J. Rausch Nuclear Licensing Administrator i

Special Projects l

cc:

Director, Division of Reactor Operations Inspection, Washington, DC 2372B l

G 8105060 0 26

'APR 2 01981