ML20006F136: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML20006F136 | | number = ML20006F136 | ||
| issue date = 01/31/1990 | | issue date = 01/31/1990 | ||
| title = Monthly Operating Rept for Jan 1990 for Virgil C Summer Nuclear Station | | title = Monthly Operating Rept for Jan 1990 for Virgil C Summer Nuclear Station | ||
| author name = Bradham O, Haltiwanger J | | author name = Bradham O, Haltiwanger J | ||
| author affiliation = SOUTH CAROLINA ELECTRIC & GAS CO. | | author affiliation = SOUTH CAROLINA ELECTRIC & GAS CO. | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
^ | |||
~ | |||
So th at hr0 ElectHC & Ga6 Comptny | |||
. r m | |||
wueem opreons gging; setus scaan i | |||
February 12, 1990 i | February 12, 1990 i | ||
Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 | Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 | ||
. Attention: Mr. Learned W. Barry | |||
==SUBJECT:== | ==SUBJECT:== | ||
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 January Monthly Operating Report-Gentlemen: | Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 January Monthly Operating Report-Gentlemen: | ||
Please find enclosed the January 1990 Monthly Operating Report for the Virgil C. | Please find enclosed the January 1990 Monthly Operating Report for the Virgil C. | ||
Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of-Technical Specifications, Section 6.9.1.10. | Summer Nuclear Station Unit No. 1. | ||
This submittal is made in accordance with the requirements of-Technical Specifications, Section 6.9.1.10. | |||
If there are any questions, please call me at your convenience. | If there are any questions, please call me at your convenience. | ||
Very truly yours, hhst | Very truly yours, hhst W | ||
: 0. S. Bradham DCH/JWH/OSB: led Attachments c: | : 0. S. Bradham DCH/JWH/OSB: led Attachments c: | ||
E. C. Roberts R. V. Tanner | D. A. Nauman/0. W. Dixon, Jr./T. C. Nichols, Jr. | ||
S. D. Ebneter | E. C. Roberts R. V. Tanner J. B. Knotts, Jr. | ||
S. D. Ebneter J. W. Flitter J. J. Hayes, Jr. | |||
C. A. Price | INP0 Records Center General Managers ANI Library | ||
)._- | |||
C. A. Price Marsh & McLennan R. B. Clary NPCF | |||
7L | / | ||
K. E. Nodland NSRC | |||
/ | |||
'J. C. Snelson RTS MON 2000 R. L. Prevatte File 818.03-1 g2270197900131. | |||
'T R | |||
^ % 05000395 PNU 7L | |||
1 - | |||
1 | g p-f | ||
p-f | '4* | ||
Document Control-Desk Jantiary Monthly Operating Report Page 1 ATTACHMENT I | Document Control-Desk Jantiary Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL t-DOCKET NO.: 50/395 UNIT: | ||
V. C. SUMMER I DATE: 02/01/90 7 | |||
[ | [ | ||
COMPLETED BY: | COMPLETED BY: | ||
J. W. HALTIWANGER TELEPHONE: | |||
(803) 345-4297 JANUARY 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | |||
(HWe-Net) 1. | |||
785 17. | |||
881 2. | |||
'880 18. | |||
883 3. | |||
882 19, 883 4. | |||
882 20. | |||
10, | 883 5. | ||
883 21. | |||
883 6. | |||
881 22, 882 7. | |||
882 23. | |||
883 8. | |||
882 24 882 9. | |||
880 25. | |||
882 L | |||
10, 882 26. | |||
881 11, 882 27. | |||
881 12. | |||
-882 28. | |||
883 13.- | |||
880 29. | |||
882 14, 883 30. | |||
882 | |||
)} | |||
15. | |||
881 31. | |||
882 16. | |||
882 J | |||
7 | 7 | ||
( ;*,' | ( ;*,' | ||
p. | p. | ||
Document Control Desk January Monthly Operating Report Page 2 ATTACHMENT !! | Document Control Desk January Monthly Operating Report Page 2 ATTACHMENT !! | ||
OPERATING DATA REPORT DOCKET NO.: | OPERATING DATA REPORT DOCKET NO.: | ||
50/395 UNIT: | |||
OPERATING STATUS | V. C. SUMMER I DATE: 02/01/90 COMPLETED BY: | ||
: 1. Reporting Period: | J. W. HALTIWANGER TELEPHONE: | ||
: 2. Currently Authorized Power Level (MWt): 277/i Max. Depend. Capacity (MWe-Net): | (803)3454297 OPERATING STATUS | ||
Design Electrical Rating (MWe. Net): | : 1. Reporting Period: | ||
: 4. Reasons for Restrictions: !(/A THIS MONTH | January 1990 Gross Hours in Reporting Period: | ||
: 5. Number of Hours Reactor Critical | 744 | ||
: 6. 'teractor Reserve Shutdown Hours | : 2. Currently Authorized Power Level (MWt): 277/i Max. Depend. Capacity (MWe-Net): | ||
: 7. Hours Generator on Line | _ 6tM Design Electrical Rating (MWe. Net): | ||
: 8. Unit Reserve Shutdown Hours | 900 3.PowerLeveltoWhichRestricted(IfAny)(MWe. Net): N/A | ||
: 9. Gross Thermal Energy Generated (MWH) LO57016 | : 4. Reasons for Restrictions: !(/A THIS MONTH YR TO DATE CUMULATIVE | ||
: 10. Gross Electrical Energy (MWH) | : 5. Number of Hours Reactor Critical 744.0 744_0 | ||
: 12. Reactor Service Factor | -40756.8 | ||
: 13. Renctor Availability Factor | : 6. 'teractor Reserve Shutdown Hours 0.0 0.0 0.0 | ||
: 14. Unfit Service factor | : 7. Hours Generator on Line 744,0 744.0 39903.6 | ||
: 15. Un'lt Availability factor | : 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | ||
: 16. Unit Capacity _ Factor (Using MDC) | : 9. Gross Thermal Energy Generated (MWH) LO57016 2057016 104427329 | ||
: 10. Gross Electrical Energy (MWH) 681580 681580 3454328.2 11.HetElectricalEnergyGenerated(MWH) 653819 681580 32753731 | |||
: 18. Unit Forced Outage Rate | : 12. Reactor Service Factor 100.0 100.0 76.4 | ||
: 13. Renctor Availability Factor 100.0 100.0 76.4 | |||
: 14. Unfit Service factor 100.0 100.0 74.8 | |||
: 15. Un'lt Availability factor 100.0 100.0 74.8 | |||
: 16. Unit Capacity _ Factor (Using MDC) 99.3 99.3 69.4 | |||
~17.UnitCapacityFactor(DesignMWe) 97.6 97.6 68.2 | |||
: 18. Unit Forced Outage Rate 0.0 0.0 8.8 | |||
: 19. Shutdowns Scheduled Over Next 6 Months (Type. Date & Duration of Each): | : 19. Shutdowns Scheduled Over Next 6 Months (Type. Date & Duration of Each): | ||
Rgf.pglina. March 23. 1990. 65 Days | Rgf.pglina. March 23. 1990. 65 Days | ||
: 20. IV Shut Down at End of Report Period. Estimated Date of Startup: | : 20. IV Shut Down at End of Report Period. Estimated Date of Startup: | ||
!!/A | |||
: 21. Units in Test Status (Prior to Commerciai Operation): | : 21. Units in Test Status (Prior to Commerciai Operation): | ||
m | N/A m | ||
( | ( | ||
a 4 | |||
x | |||
. ;.s.. | |||
5.. | |||
j Document Control Desk January Monthly Operating Report Page 3 j | |||
Document Control Desk | i I | ||
January Monthly Operating Report Page 3 | ) | ||
I | ATTACHMENT III i | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS I | |||
ATTACHMENT III | l DOCKET NO.: | ||
50/395 UNIT: | |||
DOCKET NO.: | V. C. SUMMER I DATE: | ||
Forced or | 02/01/90' COMPLETED BY: | ||
Scheduled | J. W. HALTIWANGER TELEPHONE: | ||
(803) 345-4297 3 | |||
p JANUARY 1990 Method of' TYPE Shutting i | |||
F rS Duration Down the Corrective Actions / | |||
No. | |||
Date Reason Forced or (Hours) | |||
Reactor or Comments Scheduled Reducing Power l.;, | |||
None e | None e | ||
!= | != | ||
l 1h 1 | l 1h 1 | ||
L | L | ||
=_ | |||
ll | ll p | ||
,..-o f h..". g L. | |||
Document Control Desk | Document Control Desk | ||
' January Monthly Operating Report L | |||
Page 4 l | |||
ATTACHMENT IV NARRATIVE | ATTACHMENT IV NARRATIVE | ||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE DOCKET NO.: | OF OPERATING EXPERIENCE DOCKET NO.: | ||
50/395 UNIT: | |||
V. C. SUMMER I DATE: | |||
02/01/90 COMPLETED BY: | |||
J. W. HALTlWANGER TELEPHONE: | |||
(803) 345-4297 JANUARY 1990 | |||
' Virgil C. Summer Nuclear Station was operating at approximately 80% power at the beginning of January. | |||
100% power was reached at approximately 1600 hours on January 1. | |||
The plant operated at approximately'100% power for the remainder of January. | |||
i | i | ||
+ | |||
f | f | ||
-}} | |||
Latest revision as of 04:44, 23 December 2024
| ML20006F136 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 01/31/1990 |
| From: | Bradham O, Haltiwanger J SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | Barry L NRC |
| References | |
| NUDOCS 9002270197 | |
| Download: ML20006F136 (5) | |
Text
.
^
~
So th at hr0 ElectHC & Ga6 Comptny
. r m
wueem opreons gging; setus scaan i
February 12, 1990 i
Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555
. Attention: Mr. Learned W. Barry
SUBJECT:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 January Monthly Operating Report-Gentlemen:
Please find enclosed the January 1990 Monthly Operating Report for the Virgil C.
Summer Nuclear Station Unit No. 1.
This submittal is made in accordance with the requirements of-Technical Specifications, Section 6.9.1.10.
If there are any questions, please call me at your convenience.
Very truly yours, hhst W
- 0. S. Bradham DCH/JWH/OSB: led Attachments c:
D. A. Nauman/0. W. Dixon, Jr./T. C. Nichols, Jr.
E. C. Roberts R. V. Tanner J. B. Knotts, Jr.
S. D. Ebneter J. W. Flitter J. J. Hayes, Jr.
INP0 Records Center General Managers ANI Library
)._-
C. A. Price Marsh & McLennan R. B. Clary NPCF
/
K. E. Nodland NSRC
/
'J. C. Snelson RTS MON 2000 R. L. Prevatte File 818.03-1 g2270197900131.
'T R
^ % 05000395 PNU 7L
1 -
g p-f
'4*
Document Control-Desk Jantiary Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL t-DOCKET NO.: 50/395 UNIT:
V. C. SUMMER I DATE: 02/01/90 7
[
COMPLETED BY:
J. W. HALTIWANGER TELEPHONE:
(803) 345-4297 JANUARY 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(HWe-Net) 1.
785 17.
881 2.
'880 18.
883 3.
882 19, 883 4.
882 20.
883 5.
883 21.
883 6.
881 22, 882 7.
882 23.
883 8.
882 24 882 9.
880 25.
882 L
10, 882 26.
881 11, 882 27.
881 12.
-882 28.
883 13.-
880 29.
882 14, 883 30.
882
)}
15.
881 31.
882 16.
882 J
7
( ;*,'
p.
Document Control Desk January Monthly Operating Report Page 2 ATTACHMENT !!
OPERATING DATA REPORT DOCKET NO.:
50/395 UNIT:
V. C. SUMMER I DATE: 02/01/90 COMPLETED BY:
J. W. HALTIWANGER TELEPHONE:
(803)3454297 OPERATING STATUS
- 1. Reporting Period:
January 1990 Gross Hours in Reporting Period:
744
- 2. Currently Authorized Power Level (MWt): 277/i Max. Depend. Capacity (MWe-Net):
_ 6tM Design Electrical Rating (MWe. Net):
900 3.PowerLeveltoWhichRestricted(IfAny)(MWe. Net): N/A
- 4. Reasons for Restrictions: !(/A THIS MONTH YR TO DATE CUMULATIVE
- 5. Number of Hours Reactor Critical 744.0 744_0
-40756.8
- 6. 'teractor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator on Line 744,0 744.0 39903.6
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) LO57016 2057016 104427329
- 10. Gross Electrical Energy (MWH) 681580 681580 3454328.2 11.HetElectricalEnergyGenerated(MWH) 653819 681580 32753731
- 12. Reactor Service Factor 100.0 100.0 76.4
- 13. Renctor Availability Factor 100.0 100.0 76.4
- 14. Unfit Service factor 100.0 100.0 74.8
- 15. Un'lt Availability factor 100.0 100.0 74.8
- 16. Unit Capacity _ Factor (Using MDC) 99.3 99.3 69.4
~17.UnitCapacityFactor(DesignMWe) 97.6 97.6 68.2
- 18. Unit Forced Outage Rate 0.0 0.0 8.8
- 19. Shutdowns Scheduled Over Next 6 Months (Type. Date & Duration of Each):
Rgf.pglina. March 23. 1990. 65 Days
- 20. IV Shut Down at End of Report Period. Estimated Date of Startup:
!!/A
- 21. Units in Test Status (Prior to Commerciai Operation):
N/A m
(
a 4
x
. ;.s..
5..
j Document Control Desk January Monthly Operating Report Page 3 j
i I
)
ATTACHMENT III i
UNIT SHUTDOWNS AND POWER REDUCTIONS I
l DOCKET NO.:
50/395 UNIT:
V. C. SUMMER I DATE:
02/01/90' COMPLETED BY:
J. W. HALTIWANGER TELEPHONE:
(803) 345-4297 3
p JANUARY 1990 Method of' TYPE Shutting i
F rS Duration Down the Corrective Actions /
No.
Date Reason Forced or (Hours)
Reactor or Comments Scheduled Reducing Power l.;,
None e
!=
l 1h 1
L
=_
ll p
,..-o f h..". g L.
Document Control Desk
' January Monthly Operating Report L
Page 4 l
ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
50/395 UNIT:
V. C. SUMMER I DATE:
02/01/90 COMPLETED BY:
J. W. HALTlWANGER TELEPHONE:
(803) 345-4297 JANUARY 1990
' Virgil C. Summer Nuclear Station was operating at approximately 80% power at the beginning of January.
100% power was reached at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on January 1.
The plant operated at approximately'100% power for the remainder of January.
i
+
f
-