ML20009F427: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:''
{{#Wiki_filter:..
* i sosroN co:5CN CCMPANY GENanA4. orrtcts 800 SSTLaToes STmECT S G STO N. MASSacHu9CTTS oaI99
i sosroN co:5CN CCMPANY GENanA4. orrtcts 800 SSTLaToes STmECT S G STO N. MASSacHu9CTTS oaI99
: 3. CAmb ANCOGN4NS g'
: 3. CAmb ANCOGN4NS g'
                    .0ANAGER qucLEam omCmAttcNS CEPamTMENT                                           .
.0ANAGER qucLEam omCmAttcNS CEPamTMENT e'
                                                                                            . e'
~
                                                                          ~
:~ -
:~ -
Zn,                       . February 14, 1978 Q'1       .
Zn, February 14, 1978 Q'1 l
l                                                                                      -- . i.               -
--. i.
BEco. Ler. #78-26 l
BEco. Ler. #78-26
                                                                                      .C Ud
.C Ud 7
                                                                                      ~                    7 Director of Nuclear Reactor Regulation                                           .i       -
l Director of Nuclear Reactor Regulation
* i             U.S. Nuclear Regul'atory Com:21ssion                                             d l             Washington, D. C.           20555 Docket No. 50-293 l                                                                                                                     License No. DPR-35 l
.i
l                                     Reliability Study of Standby Diesel Generators
~
i U.S. Nuclear Regul'atory Com:21ssion d
l Washington, D. C.
20555 Docket No. 50-293 l
License No. DPR-35 l
l Reliability Study of Standby Diesel Generators


==Dear Sir:==
==Dear Sir:==
 
In letters dated December 15, 1977 and January 3,1978, power reactor licensees i
In letters dated December 15, 1977 and January 3,1978, power reactor licensees i             were requested to complete a questionnaire on standby diesel generators. The l             attached questionnaire for the Pilgrim Nuclear Powe,I Station diesels has been   ,
were requested to complete a questionnaire on standby diesel generators. The l
ec=pleted and is hereby submitted.
attached questionnaire for the Pilgrim Nuclear Powe,I Station diesels has been ec=pleted and is hereby submitted.
,              3osnn Edison Conpany regrets the delay in transmitting the survey results,
3osnn Edison Conpany regrets the delay in transmitting the survey results, however, due to some c: mission we were not aware of the request for such in-l for=ation until receipt of your {{letter dated|date=January 3, 1978|text=January 3, 1978 letter}}.
!              however, due to some c: mission we were not aware of the request for such in-l             for=ation until receipt of your January 3, 1978 letter. At that time appropriate
At that time appropriate steps were taken to obtain a copy of the questionnaire and begin ec= piling the responses.
!              steps were taken to obtain a copy of the questionnaire and begin ec= piling the responses.
We trust that this infor=ation will contribute to the reliability study.
We trust that this infor=ation will contribute to the reliability study. If additional infor=ation is required concerning this subj ect please contact the
If additional infor=ation is required concerning this subj ect please contact the
[             individual identified on the cover sheet of the question = aire.
[
individual identified on the cover sheet of the question = aire.
l l
l l
                                            .                        Very truly yours, l
Very truly yours, l
                                                                                                                    /     <
/
l :l; ['gh'u b ret u-
l :l; ['gh'u b ret u-
                                                                                .Yj'                     ,-
.Yj' 7?C550015 l
7?C550015 l     h IO, Attachments I     D
h IO, I
                                                                                                        .                            \ \
D Attachments
8107:.s10135 810720 PDR ADOCK 05000293 p                           PDR                                                     -
\\
\\
8107:.s10135 810720 PDR ADOCK 05000293 p
PDR


I s
I s
20-           .
20-Are any foreign cases sucn as pro;rane, freen, halon, carbon S.
S.      Are any foreign cases sucn as pro;rane, freen, halon, carbon dioxide, etc. storec in the: Diesel Engine roem?                                                         f!o Yes           flo                                         .#    or adjacent buildings? Yes w . . .. .                                                  If yes, (other than hand portacle fire extinguishers), then
dioxide, etc. storec in the:
  ,'                                                       identify gases and give approximate tar.k                                               size.
Diesel Engine roem?
    .'.                                                                                                                                          3 Volume (f t )
Yes flo or adjacent buildings? Yes f!o If yes, (other than hand portacle fire extinguishers), then w.....,'
Gases T.        Does control systect autenatically bypa:s, in cmergency
identify gases and give approximate tar.k size.
        . .:                                                      starting, any engine tem;orarily out of service for maintenance? Yes __                                                 fic _p <'
3 Volume (f t )
Gases Does control systect autenatically bypa:s, in cmergency starting, any engine tem;orarily out of service for T.
maintenance? Yes __
fic _p <'
If yes, then how many f ailures to bypass have occured?
If yes, then how many f ailures to bypass have occured?
        . .: :. .: -                                                ~
~
        .._7,.,
Does the control system aut:matically overritie the test
Does the control system aut:matically overritie                                                     the test raode under emergency conditiens? Yes j."'
*.._7,.,
                        ~
~
U.                                                                                                    !!o V.
U.
Have repetitive mechanical f ailures occurred in any com:onent part.
raode under emergency conditiens?
Yes j."'
!!o Have repetitive mechanical f ailures occurred in any com:onent part.
or subsystem of the engine, generator, or switen gear, eti.?
or subsystem of the engine, generator, or switen gear, eti.?
Yes n #!!o 10 r/c3 _,
V.
if yes, then which part or sJbsys tem? 5'ri.A . - ,WA "T.:
n !!o Yes 10 r/c3 _,
How many failures? '/
if yes, then which part or sJbsys tem? 5'ri.A. -,WA "T.:
:                                                                                                                                        : Ka weie c,x-Give nature of failure. At*La d f-
How many failures?
                                                                      ':ould periccic (yearly or other) ovaluation and/or testing by "outside experts" contribute significantly to the diesel-generator reliability? Yes g lio g, . .
'/
                      'NS Give brief reasons for the answer.                                                       Av.<ww/%).b n          -                                                                                                                    cc < :+-c      r, se
Ka weie c,x-Give nature of failure. At*La d f-
                    .~..
':ould periccic (yearly or other) ovaluation and/or testing by "outside experts" contribute significantly to the diesel-generator reliability? Yes g lio g,..
Pe:Je .w.sti is 6Asin . c e":,%c
'NS Give brief reasons for the answer. Av.<ww/%).b Pe:Je.w.sti is 6Asin. c e":,%c cc < :+-c r, se n
                                                                                                                                                                                          ~
. ~..
                                        ..y                                                                                                                                             _.
..y
~


I 1
1 j
      ..              j                                                                                          21 X.         1.         Give the accunulated tir.e-load ccera-ing recore f:r each diesel-generator unit from insta,1.lati:n to the cresent (Running Mcurs):                                                                       -
21 X.
  . .-- h,                 r                                   Preoperational test Date m /7c.
1.
:      Engine     :    Surv. Testing &                 :        inargency       :  Total         :
Give the accunulated tir.e-load ccera-ing recore f:r each diesel-generator unit from insta,1.lati:n to the cresent (Running Mcurs):
: Serial No. :         liaintenance Hrs. :                       and Other     :  Hcurs         :
..-- h, r
        - -                                                :                :    No load : Loaded                 :      Service Hrs. :                    :
Preoperational test Date m /7c.
  - --!~
Engine Surv. Testing &
N.                 ~
inargency Total
: Serial No. :
liaintenance Hrs. :
and Other Hcurs No load : Loaded Service Hrs. :
- --!~
N.
~
2.
Surveillance test load (percent of cortinucus rating)
Surveillance test load (percent of cortinucus rating)
                                                                                                                                                    / ; 'c-2.
/ ; 'c-3.
: 3.          Give the projected or clannec tice-1cid coeratica for                                       .
Give the projected or clannec tice-1cid coeratica for eaca diesel-generator unit during tne text 12 cenths.'
eaca diesel-generator unit during tne text 12 cenths.'
: Surveillance &
        -                                                    : Surveillance &           :        Ecergency           :      '. ctal :                          :
Ecergency
                                                                                                                                ?.cu rs  :                            :
' ctal
:flaintenance Hrs. :                 and other :
:flaintenance Hrs. :
:                          :    Service Mrs. :                          :
and other :
:cac m:: A_x                                             .
?.cu rs Service Mrs. :
          .[,,                                                 :                          :      c< ,    e. t -         : 52.'.N L-S :
:cac m:: A_x
:* .m c < e c o           :
.[,,
e' re' W.   :                            :
c<
: 4.        Provide the follcuing succary of the iriccic surveillance testing experience:                                   ,
: e. t -
Starting date of surveillance testing (OL date)                               'D
: 52.'.N L-S :
                                                                                                                                                    .      '' 'J 77-a.
e' re' W.
        ,                                                      b. Periccic test interval / '55% v i                                                              c. Total number of surveillance tes 3 :erformed
:*.m c < e c o 4.
: d. Total nuceer of test f ailures                             m L;                 .
Provide the follcuing succary of the iriccic surveillance testing experience:
f aii re to accept load
'D
              ":                                                      failure to start
'' 'J 77-Starting date of surveillance testing (OL date) a.
              '~
b.
i                                              failure to carry icad                               f ail .res due to c:erator errc:
Periccic test interval
_"                                                        f ailure due to ecuir, rent not bein; perative curing cecrgency condi tions
/ '55% v Total number of surveillance tes 3 :erformed i
: e. Supply a copy of tna surveillarce test peccecures with this -
c.
d.
Total nuceer of test f ailures m
L;":
failure to start f aii re to accept load i
failure to carry icad f ail.res due to c:erator errc:
'~
f ailure due to ecuir, rent not bein; perative curing cecrgency condi tions e.
Supply a copy of tna surveillarce test peccecures with this -
concleted questionnaire.
concleted questionnaire.
: e.          .
e.
e-               -    -            ,
e-g
--m,  , ,
--m,
                                                                                                                                .,._-g     .--                  - , , -}}
.,._-g
-,, -}}

Latest revision as of 08:22, 21 December 2024

Forwards Completed Questionnaire Re Reliability Study of Standby Diesel Generators
ML20009F427
Person / Time
Site: Pilgrim
Issue date: 02/14/1978
From: Andognini G
BOSTON EDISON CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20009F426 List:
References
78-26, NUDOCS 8107310135
Download: ML20009F427 (3)


Text

..

i sosroN co:5CN CCMPANY GENanA4. orrtcts 800 SSTLaToes STmECT S G STO N. MASSacHu9CTTS oaI99

3. CAmb ANCOGN4NS g'

.0ANAGER qucLEam omCmAttcNS CEPamTMENT e'

~

~ -

Zn, February 14, 1978 Q'1 l

--. i.

BEco. Ler. #78-26

.C Ud 7

l Director of Nuclear Reactor Regulation

.i

~

i U.S. Nuclear Regul'atory Com:21ssion d

l Washington, D. C.

20555 Docket No. 50-293 l

License No. DPR-35 l

l Reliability Study of Standby Diesel Generators

Dear Sir:

In letters dated December 15, 1977 and January 3,1978, power reactor licensees i

were requested to complete a questionnaire on standby diesel generators. The l

attached questionnaire for the Pilgrim Nuclear Powe,I Station diesels has been ec=pleted and is hereby submitted.

3osnn Edison Conpany regrets the delay in transmitting the survey results, however, due to some c: mission we were not aware of the request for such in-l for=ation until receipt of your January 3, 1978 letter.

At that time appropriate steps were taken to obtain a copy of the questionnaire and begin ec= piling the responses.

We trust that this infor=ation will contribute to the reliability study.

If additional infor=ation is required concerning this subj ect please contact the

[

individual identified on the cover sheet of the question = aire.

l l

Very truly yours, l

/

l :l; ['gh'u b ret u-

.Yj' 7?C550015 l

h IO, I

D Attachments

\\

\\

8107:.s10135 810720 PDR ADOCK 05000293 p

PDR

I s

20-Are any foreign cases sucn as pro;rane, freen, halon, carbon S.

dioxide, etc. storec in the:

Diesel Engine roem?

Yes flo or adjacent buildings? Yes f!o If yes, (other than hand portacle fire extinguishers), then w.....,'

identify gases and give approximate tar.k size.

3 Volume (f t )

Gases Does control systect autenatically bypa:s, in cmergency starting, any engine tem;orarily out of service for T.

maintenance? Yes __

fic _p <'

If yes, then how many f ailures to bypass have occured?

~

Does the control system aut:matically overritie the test

  • .._7,.,

~

U.

raode under emergency conditiens?

Yes j."'

!!o Have repetitive mechanical f ailures occurred in any com:onent part.

or subsystem of the engine, generator, or switen gear, eti.?

V.

n !!o Yes 10 r/c3 _,

if yes, then which part or sJbsys tem? 5'ri.A. -,WA "T.:

How many failures?

'/

Ka weie c,x-Give nature of failure. At*La d f-

':ould periccic (yearly or other) ovaluation and/or testing by "outside experts" contribute significantly to the diesel-generator reliability? Yes g lio g,..

'NS Give brief reasons for the answer. Av.<ww/%).b Pe:Je.w.sti is 6Asin. c e":,%c cc < :+-c r, se n

. ~..

..y

~

1 j

21 X.

1.

Give the accunulated tir.e-load ccera-ing recore f:r each diesel-generator unit from insta,1.lati:n to the cresent (Running Mcurs):

..-- h, r

Preoperational test Date m /7c.

Engine Surv. Testing &

inargency Total

Serial No. :

liaintenance Hrs. :

and Other Hcurs No load : Loaded Service Hrs. :

- --!~

N.

~

2.

Surveillance test load (percent of cortinucus rating)

/ ; 'c-3.

Give the projected or clannec tice-1cid coeratica for eaca diesel-generator unit during tne text 12 cenths.'

Surveillance &

Ecergency

' ctal

flaintenance Hrs. :

and other :

?.cu rs Service Mrs. :

cac m:: A_x

.[,,

c<

e. t -
52.'.N L-S :

e' re' W.

  • .m c < e c o 4.

Provide the follcuing succary of the iriccic surveillance testing experience:

'D

'J 77-Starting date of surveillance testing (OL date) a.

b.

Periccic test interval

/ '55% v Total number of surveillance tes 3 :erformed i

c.

d.

Total nuceer of test f ailures m

L;":

failure to start f aii re to accept load i

failure to carry icad f ail.res due to c:erator errc:

'~

f ailure due to ecuir, rent not bein; perative curing cecrgency condi tions e.

Supply a copy of tna surveillarce test peccecures with this -

concleted questionnaire.

e.

e-g

--m,

.,._-g

-,, -