ML20055B746: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ | {{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ | ||
Malling Addrns | Malling Addrns Alabama Power Company 600 North 18th Street Post Offica Box 2S41 p | ||
Birmingham, Alabama 35291 | |||
'l' Telephone 205 783-6081 F. L. Clayton, Jr. | |||
b Senior Vice President SC Alabama Power 2. | |||
Senior Vice President | Flintridge Building | ||
Flintridge Building | ''v y | ||
tte souttern chricc system July 15, 1982 Docket No. 364 CORRECTED COPY U. S. | |||
Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W. | |||
Suite 3100 Atlanta, Georgia 30303 | Suite 3100 Atlanta, Georgia 30303 | ||
==Dear Si r:== | ==Dear Si r:== | ||
Joseph l1. Farley Nucl ea r Pl ant, Unit 2, Licensee Event Reports Nos. LER 82-027/03L-0 and LER 82-029/03L-0 were for-warded July 12, 1982 with incorrect report dates, i.e. June 12, 82. | |||
Joseph l1. Farley Nucl ea r Pl ant , Unit 2, Licensee Event Reports Nos. LER 82-027/03L-0 and LER 82-029/03L-0 were for-warded July 12, 1982 with incorrect report dates, i.e. June 12, 82. | Corrected copies are attached hereto. | ||
If you have any questions, please advise. | If you have any questions, please advise. | ||
Yours very truly, J | Yours very truly, J | ||
f.se / J L. | |||
f.se / J Cl ayton , Jr. | Cl ayton, Jr. | ||
FLCJr/KWM:nac Enclosures xc: Di rector, IE Director, MIPC | FLCJr/KWM:nac Enclosures xc: Di rector, IE Director, MIPC | ||
, tirTjfhN' F | |||
l 8207230239 820715 PDR ADOCK 05000364 S | |||
PDR l | |||
l}} | |||
Latest revision as of 15:44, 17 December 2024
| ML20055B746 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/15/1982 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20055B747 | List:
|
| References | |
| NUDOCS 8207230239 | |
| Download: ML20055B746 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Malling Addrns Alabama Power Company 600 North 18th Street Post Offica Box 2S41 p
Birmingham, Alabama 35291
'l' Telephone 205 783-6081 F. L. Clayton, Jr.
b Senior Vice President SC Alabama Power 2.
Flintridge Building
v y
tte souttern chricc system July 15, 1982 Docket No. 364 CORRECTED COPY U. S.
Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.
Suite 3100 Atlanta, Georgia 30303
Dear Si r:
Joseph l1. Farley Nucl ea r Pl ant, Unit 2, Licensee Event Reports Nos. LER 82-027/03L-0 and LER 82-029/03L-0 were for-warded July 12, 1982 with incorrect report dates, i.e. June 12, 82.
Corrected copies are attached hereto.
If you have any questions, please advise.
Yours very truly, J
f.se / J L.
Cl ayton, Jr.
FLCJr/KWM:nac Enclosures xc: Di rector, IE Director, MIPC
, tirTjfhN' F
l 8207230239 820715 PDR ADOCK 05000364 S
PDR l
l