L-90-353, Documents Written & Verbal Request of Region II Personnel Re Temporary Waiver of Compliance of Tech Spec 3.6: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
*N i | |||
i | O P.O. Box 0291D, Miami, FL,33102-9100 i | ||
O | I 5: P L SEP'2 61990 1 | ||
. L - 9 0'-3 5 3 l | |||
Stewart D. Ebneter-Regional Administrator, Region II | |||
] | |||
Atlanta, GA 30323 I | U. | ||
S. Nuclear Regulatory Commission l | |||
101 Marietta St., | |||
N.W., Suite 2900 Atlanta, GA 30323 I | |||
Mr. Stewart D. Ebneter: | Mr. Stewart D. Ebneter: | ||
Re: | lh Re: | ||
Boric Acid Filter Discharge Isolation Valve 3-348 | Turkey Point Unit 3 Docket No. 50-250 j | ||
This letter documents a written and verbal request of ; Region ;IIl personnel | Boric Acid Filter Discharge Isolation Valve 3-348 y | ||
Specifica. tion .3. 6, | Temporary Waiver of Compliance This letter documents a written and verbal request of ; Region ;IIl personnel for a. temporary waiver of compliance of Technical Specifica. tion.3. 6, | ||
On Septembar 26, 1990 leakage was detected from the boric . acid . | " Chemical and Volume Control--~ System.'"' | ||
filter discu rge isolation diaphragm valve-3-346. .The-boric" acid filter by paes line must .be . isolated to repair the valve. . This configuration results in no flow path from:the boric-acidu | On Septembar 26, 1990 leakage was detected from the boric. acid. | ||
tanks to the Rt. actor Coolant' System (RCS)'during valve' repair.' | filter discu rge isolation diaphragm valve-3-346..The-boric" acid filter by paes line must.be. isolated to repair the valve.. This configuration results in no flow path from:the boric-acidu torage s | ||
tanks to the Rt. actor Coolant' System (RCS)'during valve' repair.' | |||
path to the RCS from the boric acid -storage tanks and one flow . path- | ~i Technical Specification (TS) 3.6 requires system piping, interlocks. | ||
from the refueling water storage tank, . to the RCS when the reactor. | l and valves to be operable to'the extent of establishing one' flow path to the RCS from the boric acid -storage tanks and one flow. path-from the refueling water storage tank,. to the RCS when the reactor. | ||
is critical. - TS 3.6 has no Limiting Conditions For . Operation (LCO) for flow path unavailability and therefore TS 3.0.1. applies. TS 3.0.l' requires that when an LCO action statement can=not.be met, action shall be initiated within one hour to place the unit ~1n a. | ~ | ||
is critical. - TS 3.6 has no Limiting Conditions For. Operation (LCO) for flow path unavailability and therefore TS 3.0.1. applies. | |||
TS 3.0.l' requires that when an LCO action statement can=not.be met, action shall be initiated within one hour to place the unit ~1n a. | |||
i condition where the specification does not apply. -In this. case the reactor would need to be placed in a subcritical condit' ion within 6 hours. | |||
The revised Technical Specifications (RTS) approved by the;NRClon August 28, 1990 provides an LCO for this condition as follows: | The revised Technical Specifications (RTS) approved by the;NRClon August 28, 1990 provides an LCO for this condition as follows: | ||
RTS 3.1.2.2 ACTION: | RTS 3.1.2.2 ACTION: | ||
: a. With no boration source path from a boric' acid storage . tank; OPERABLF., | ~ | ||
: 1. Demonstrate the OPERABILITY of the second flow path-from the refueling water storage tank - to - the. charging pump | : a. With no boration source path from a boric' acid storage. tank; OPERABLF., | ||
: 1. Demonstrate the OPERABILITY of the second flow path-from the refueling water storage tank - to - the. charging pump suction by verifying the flow path valve alignment; and 9010230164 900926 PDR ADOCK 0500 GO P | |||
an FPL Group company | an FPL Group company | ||
[c, | [c, y | ||
y | |||
. 4, | |||
-l | |||
) | |||
2. | |||
Restore the boration source - path from.a boric acid storage tank to OPERABLE status within'72 hours or be in-at least HOT STANDBY..._within the next 6-hours.. | |||
]) | |||
The revision. allows operation with the flow path isolated for' 72' | The revision. allows operation with the flow path isolated for' 72' | ||
. i hours if the paths from the Refueling Water Storage Tank (RWST) are-1 operable. | |||
At this time the flow paths--from'the RWST are operable. | |||
No credit is taken for the concentrated boric acid contain~ed in the | No credit is taken for the concentrated boric acid contain~ed in the 1 | ||
Accidents described in the Turkey Point Final Safety Analysis | Boric Acid Storage Tanks.(BAST) in any of.the Design Basis Accidents described in the Turkey Point Final Safety Analysis i | ||
conditions for the most severe anticipated cooldown transient -(main'. | Report (FSAR). | ||
cluster to be fully withdraun, is achieved via the usenof boron | Sufficient shutdown. margin under hot. shutdown-conditions for the most severe anticipated cooldown transient -(main'. | ||
from the RWST through the Safety Injection System.- The MSLB | q steamline break (MSLB)), assuming the most reactive rod control cluster to be fully withdraun, is achieved via the usenof boron from the RWST through the Safety Injection System.- | ||
The MSLB if analysis does allow the reactor to return to. criticality 1due tol | |||
j transients, and changes- in- power levels. | .j cooldown inserted positive reactivity, provided no core damage exists. | ||
conditions. | A Westinghouse analysis has demonstrated that no: core I | ||
Due to difficulties which could be encountered during<the_ repair- | damage is expected to occur during cooldown. | ||
1 effort, a temporary waiver of compliance with TS 3.0.1. is requested | -i The BASTS and the boric acid transfer pumps provide a-source-of concentrated boric acid to be added to the-primary coolant? to offset reactivity changes caused by n'ormal plant operating ~ | ||
allowing Turkey Point Unit 3 to continue;to-operate'for.'up:tos24 | j transients, and changes-in-power levels. | ||
These~ borict. acid i | |||
additions are also made to attain and maintain cold. shutdown : | |||
conditions. | |||
Based upon the above analysis and the expedited, repair of valve 3- | An additional means for providing borated water 'isl i | ||
348, the plant will not.be placed in-a condition.that/ compromises the health and safety of plant personnel or the general publ'ic. | 2 from the RWST through the charging pumps'to the primary, coolant. | ||
Following review by the Plant Nuclear Safety. Committee,' approval 'of | Due to difficulties which could be encountered during<the_ repair-1 effort, a temporary waiver of compliance with TS 3.0.1. is requested allowing Turkey Point Unit 3 to continue;to-operate'for.'up:tos24 j | ||
t | ~ | ||
hours with the flow path from the; boric acid storage: tanks to thei il primary coolant inoperable. | |||
] | |||
1 i'' | Based upon the above analysis and the expedited, repair of valve 3-348, the plant will not.be placed in-a condition.that/ compromises the health and safety of plant personnel or the general publ'ic. | ||
l! .' | Following review by the Plant Nuclear Safety. Committee,' approval 'of j | ||
this document was recommended to L: thel Plant Manager. | |||
The Plant Manager subsequently approved this-document. | |||
.f t | |||
a l | |||
i j | |||
1 i'' | |||
l!.' | |||
I; | |||
7 | 7 i c; 4 ;;. | ||
i c; 4 ;; . | i-' | ||
'e q., | |||
~ | |||
v q.. | |||
s | |||
v | |||
:i? | :i? | ||
st | st 4 4 e | ||
It 'you' have any questions concerning this ' issue please). contact us, i | |||
Very truly yours, | t 7: | ||
Very truly yours, H | |||
Vic< | s# | ||
Vic< | |||
Dr. G. E. Edison, Project. Manager, NRR,:USNRC' | resident Tur;tey Point Nuclear KNH/JEK/jek | ||
Senior ResidentLInspector,LUSNRC,. Turkey Point Plant- | . 0 cc:- | ||
Document Control Desk,-USNRC.: | |||
Dr. G. E. Edison, Project. Manager, NRR,:USNRC' Senior ResidentLInspector,LUSNRC,. Turkey Point Plant- | |||
~ | |||
i g),. | i g),. | ||
i i | i i | ||
},, | |||
l | ih' rJ; I | ||
l | |||
.l O, | |||
. I'- | |||
1 f | 1 f | ||
4 | lg 4 | ||
1 | |||
( ,- | -l | ||
o-g | - i i | ||
(,- | |||
n o-g y^ | |||
l m. | |||
\\ | |||
ii | ii | ||
$ ;E s | |||
1 r | |||
i 1 | |||
5 | .g, y | ||
''1 4 | |||
:.. p a | 5 r | ||
t | |||
,f 5 | |||
r | |||
,- ;4., | |||
:.. p a | |||
s | |||
+ | |||
g | g | ||
.:tv | |||
- ',,k. : | |||
: 4 .5 | y j | ||
ap,p.M,i q p | |||
: 4.5 i | |||
s> | |||
+ | |||
r | + | ||
o q | |||
4,}} | Y r | ||
,l./ N') Ja | |||
'i ' | |||
j 4,}} | |||
Latest revision as of 00:25, 17 December 2024
| ML20062A831 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/26/1990 |
| From: | Harris K FLORIDA POWER & LIGHT CO. |
| To: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| L-90-353, NUDOCS 9010230164 | |
| Download: ML20062A831 (3) | |
Text
-
- N i
O P.O. Box 0291D, Miami, FL,33102-9100 i
I 5: P L SEP'2 61990 1
. L - 9 0'-3 5 3 l
Stewart D. Ebneter-Regional Administrator, Region II
]
U.
S. Nuclear Regulatory Commission l
101 Marietta St.,
N.W., Suite 2900 Atlanta, GA 30323 I
Mr. Stewart D. Ebneter:
lh Re:
Turkey Point Unit 3 Docket No. 50-250 j
Boric Acid Filter Discharge Isolation Valve 3-348 y
Temporary Waiver of Compliance This letter documents a written and verbal request of ; Region ;IIl personnel for a. temporary waiver of compliance of Technical Specifica. tion.3. 6,
" Chemical and Volume Control--~ System.'"'
On Septembar 26, 1990 leakage was detected from the boric. acid.
filter discu rge isolation diaphragm valve-3-346..The-boric" acid filter by paes line must.be. isolated to repair the valve.. This configuration results in no flow path from:the boric-acidu torage s
tanks to the Rt. actor Coolant' System (RCS)'during valve' repair.'
~i Technical Specification (TS) 3.6 requires system piping, interlocks.
l and valves to be operable to'the extent of establishing one' flow path to the RCS from the boric acid -storage tanks and one flow. path-from the refueling water storage tank,. to the RCS when the reactor.
~
is critical. - TS 3.6 has no Limiting Conditions For. Operation (LCO) for flow path unavailability and therefore TS 3.0.1. applies.
TS 3.0.l' requires that when an LCO action statement can=not.be met, action shall be initiated within one hour to place the unit ~1n a.
i condition where the specification does not apply. -In this. case the reactor would need to be placed in a subcritical condit' ion within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
The revised Technical Specifications (RTS) approved by the;NRClon August 28, 1990 provides an LCO for this condition as follows:
RTS 3.1.2.2 ACTION:
~
- a. With no boration source path from a boric' acid storage. tank; OPERABLF.,
- 1. Demonstrate the OPERABILITY of the second flow path-from the refueling water storage tank - to - the. charging pump suction by verifying the flow path valve alignment; and 9010230164 900926 PDR ADOCK 0500 GO P
an FPL Group company
[c, y
. 4,
-l
)
2.
Restore the boration source - path from.a boric acid storage tank to OPERABLE status within'72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in-at least HOT STANDBY..._within the next 6-hours..
])
The revision. allows operation with the flow path isolated for' 72'
. i hours if the paths from the Refueling Water Storage Tank (RWST) are-1 operable.
At this time the flow paths--from'the RWST are operable.
No credit is taken for the concentrated boric acid contain~ed in the 1
Boric Acid Storage Tanks.(BAST) in any of.the Design Basis Accidents described in the Turkey Point Final Safety Analysis i
Report (FSAR).
Sufficient shutdown. margin under hot. shutdown-conditions for the most severe anticipated cooldown transient -(main'.
q steamline break (MSLB)), assuming the most reactive rod control cluster to be fully withdraun, is achieved via the usenof boron from the RWST through the Safety Injection System.-
The MSLB if analysis does allow the reactor to return to. criticality 1due tol
.j cooldown inserted positive reactivity, provided no core damage exists.
A Westinghouse analysis has demonstrated that no: core I
damage is expected to occur during cooldown.
-i The BASTS and the boric acid transfer pumps provide a-source-of concentrated boric acid to be added to the-primary coolant? to offset reactivity changes caused by n'ormal plant operating ~
j transients, and changes-in-power levels.
These~ borict. acid i
additions are also made to attain and maintain cold. shutdown :
conditions.
An additional means for providing borated water 'isl i
2 from the RWST through the charging pumps'to the primary, coolant.
Due to difficulties which could be encountered during<the_ repair-1 effort, a temporary waiver of compliance with TS 3.0.1. is requested allowing Turkey Point Unit 3 to continue;to-operate'for.'up:tos24 j
~
hours with the flow path from the; boric acid storage: tanks to thei il primary coolant inoperable.
]
Based upon the above analysis and the expedited, repair of valve 3-348, the plant will not.be placed in-a condition.that/ compromises the health and safety of plant personnel or the general publ'ic.
Following review by the Plant Nuclear Safety. Committee,' approval 'of j
this document was recommended to L: thel Plant Manager.
The Plant Manager subsequently approved this-document.
.f t
a l
i j
1 i
l!.'
I;
7 i c; 4 ;;.
i-'
'e q.,
~
v q..
s
- i?
st 4 4 e
It 'you' have any questions concerning this ' issue please). contact us, i
t 7:
Very truly yours, H
s#
Vic<
resident Tur;tey Point Nuclear KNH/JEK/jek
. 0 cc:-
Document Control Desk,-USNRC.:
Dr. G. E. Edison, Project. Manager, NRR,:USNRC' Senior ResidentLInspector,LUSNRC,. Turkey Point Plant-
~
i g),.
i i
},,
ih' rJ; I
l
.l O,
. I'-
1 f
lg 4
1
-l
- i i
(,-
n o-g y^
l m.
\\
ii
$ ;E s
1 r
i 1
.g, y
1 4
5 r
t
,f 5
r
,- ;4.,
- .. p a
s
+
g
.:tv
- ',,k. :
y j
ap,p.M,i q p
- 4.5 i
s>
+
+
o q
Y r
,l./ N') Ja
'i '
j 4,