ML20064F321: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:n M:lling Addr:ss k | {{#Wiki_filter:n M:lling Addr:ss k | ||
AlaDama Power Company e | |||
Senior Vice President Fhntridge Building | 600 North 18th Street Post Ofhce Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr. | ||
the southern &ctic system | Senior Vice President AlabamaPower Fhntridge Building the southern &ctic system December 30, 1982 Docket No. 348 Docket No. 364 | ||
U. S. Nuclear Regulatory Commission | .w U. S. Nuclear Regulatory Commission 2 | ||
w | Of fice of Inspection and Enforcement w | ||
Region II 101 Marietta Street, N.W. | |||
3 Suite 3100 is Atlanta, Georgia 30303 w | |||
==Dear Sir:== | ==Dear Sir:== | ||
cra Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Report No. LER 82-059/03L-0 and Unit 2, Licensee Event Report No. LER 82-052/03L-0 are | cra Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Report No. LER 82-059/03L-0 and Unit 2, Licensee Event Report No. LER 82-052/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9 to provide thirty (30) days written notification of the occurrences. | ||
forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9 to provide thirty (30) days written notification of the occurrences. | |||
If you have any questions, please advise. | If you have any questions, please advise. | ||
Yours very truly, F. L. Clayt | Yours very truly, F. L. Clayt | ||
, J r. | |||
FLCJ r/KWM:nac Enclosures xc: Director, IE (30 copies) | FLCJ r/KWM:nac Enclosures xc: Director, IE (30 copies) | ||
Director, MIPC (3 copies) 8301060306 821230 | Director, MIPC (3 copies) 8301060306 821230 | ||
Or3: | 'e' Or3: | ||
DR ADOCK 05000 | DR ADOCK 05000 V | ||
g;}} | |||
Latest revision as of 20:51, 16 December 2024
| ML20064F321 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/30/1982 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20064F323 | List: |
| References | |
| NUDOCS 8301060306 | |
| Download: ML20064F321 (1) | |
Text
n M:lling Addr:ss k
AlaDama Power Company e
600 North 18th Street Post Ofhce Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.
Senior Vice President AlabamaPower Fhntridge Building the southern &ctic system December 30, 1982 Docket No. 348 Docket No. 364
.w U. S. Nuclear Regulatory Commission 2
Of fice of Inspection and Enforcement w
Region II 101 Marietta Street, N.W.
3 Suite 3100 is Atlanta, Georgia 30303 w
Dear Sir:
cra Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Report No. LER 82-059/03L-0 and Unit 2, Licensee Event Report No. LER 82-052/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9 to provide thirty (30) days written notification of the occurrences.
If you have any questions, please advise.
Yours very truly, F. L. Clayt
, J r.
FLCJ r/KWM:nac Enclosures xc: Director, IE (30 copies)
Director, MIPC (3 copies) 8301060306 821230
'e' Or3:
DR ADOCK 05000 V
g;