ML20070P135: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:(y | {{#Wiki_filter:(y glt hW t | ||
Harry Tauber Detroit EEc:issc)r1 January 11, 1983 EF2 - 60,742 Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 | |||
==Dear Mr. Youngblood:== | ==Dear Mr. Youngblood:== | ||
==Reference:== | ==Reference:== | ||
Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 | Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 | ||
| Line 26: | Line 25: | ||
==Subject:== | ==Subject:== | ||
Radiological Emergency Response Plan Table D-1, Emergency Action Levels The column headings on Table D-1 will be revised as shown below for consistency with Emergency Plan Implementing Procedure EP-101. | Radiological Emergency Response Plan Table D-1, Emergency Action Levels The column headings on Table D-1 will be revised as shown below for consistency with Emergency Plan Implementing Procedure EP-101. | ||
TABLE D-1 | TABLE D-1 EMERGENCY ACTION LEVELS 1. | ||
FUEL DAMAGE /HIGH RADIATION Indication / | |||
Initial Condition | Initial Condition Emergency Action Level Information l | ||
UNUSUAL EVENT A. | |||
Fuel Damage la. High offgas, etc. | |||
Offgas PRMS Indicaticn or Recorder, etc. | |||
1b. | 1b. | ||
Ic. | Ic. | ||
8301260183 830111 PDR e.DDCK 05000341 F | 8301260183 830111 PDR e.DDCK 05000341 F | ||
PDR | |||
R 43V6 | R 43V6 | ||
'N o | |||
Mr. B. J. Yo*ungblood January 11, 1983 EF2 - 60,742 Page 2 To further clarify Table D-1, a Guide to Classifying Emergencies will be included in Section D. | Mr. B. J. Yo*ungblood January 11, 1983 EF2 - 60,742 Page 2 To further clarify Table D-1, a Guide to Classifying Emergencies will be included in Section D. | ||
The above changes will be included in Revision 2 to the Plan. | The above changes will be included in Revision 2 to the Plan. | ||
The format of Table D-1 and EP-101 has been reviewed by personnel from the Fermi 2 Operations Staff. Those who have reviewed the documents are able to follow and | The format of Table D-1 and EP-101 has been reviewed by personnel from the Fermi 2 Operations Staff. | ||
Those who have reviewed the documents are able to follow and l | |||
understand the information as presented. | |||
Should you have any additional questions, please con-tact Mr. L. E. Schuerman, (313) 649-7562. | Should you have any additional questions, please con-tact Mr. L. E. Schuerman, (313) 649-7562. | ||
Sincerely, | Sincerely, | ||
,r/ | |||
(gat 4wk cc: | f/ | ||
(gat 4wk cc: | |||
Mr. B. Little Mr. M. D. Lynch | |||
__ _}} | __ _}} | ||
Latest revision as of 09:19, 16 December 2024
| ML20070P135 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/11/1983 |
| From: | Tauber H DETROIT EDISON CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| References | |
| EF2-60-742, NUDOCS 8301260183 | |
| Download: ML20070P135 (2) | |
Text
(y glt hW t
Harry Tauber Detroit EEc:issc)r1 January 11, 1983 EF2 - 60,742 Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Youngblood:
Reference:
Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341
Subject:
Radiological Emergency Response Plan Table D-1, Emergency Action Levels The column headings on Table D-1 will be revised as shown below for consistency with Emergency Plan Implementing Procedure EP-101.
TABLE D-1 EMERGENCY ACTION LEVELS 1.
FUEL DAMAGE /HIGH RADIATION Indication /
Initial Condition Emergency Action Level Information l
UNUSUAL EVENT A.
Fuel Damage la. High offgas, etc.
Offgas PRMS Indicaticn or Recorder, etc.
1b.
Ic.
8301260183 830111 PDR e.DDCK 05000341 F
R 43V6
'N o
Mr. B. J. Yo*ungblood January 11, 1983 EF2 - 60,742 Page 2 To further clarify Table D-1, a Guide to Classifying Emergencies will be included in Section D.
The above changes will be included in Revision 2 to the Plan.
The format of Table D-1 and EP-101 has been reviewed by personnel from the Fermi 2 Operations Staff.
Those who have reviewed the documents are able to follow and l
understand the information as presented.
Should you have any additional questions, please con-tact Mr. L. E. Schuerman, (313) 649-7562.
Sincerely,
,r/
f/
(gat 4wk cc:
Mr. B. Little Mr. M. D. Lynch
__ _