AVERAGE DAILY UNIT POWER LEVEL                                                           -
AVERAGE DAILY UNIT POWER LEVEL s.
s.
DOCKET NO.
1 DOCKET NO. 50-346 UNIT Davis-Besse Unit 1 DATE January 7, 1983 COMPLETED BY Bilal Sarsour TELEPHONE 419-259-5000, Ext..
50-346 1
384 Deceder, 1982 MONTH DAY         AVERAGE DAILY POWER LEVEL                               DAY               AVERAGE DAILY POWER LEVEL (MWe-Net)                                                                   (MWe-Net) 3 873                                       g7                                 877' 2                     871                               s'   gg                                 873 3                     826                                     gg                                 876 4     .
UNIT Davis-Besse Unit 1 DATE January 7, 1983 COMPLETED BY Bilal Sarsour TELEPHONE 419-259-5000, Ext..
33                                     20                                 876 5                     386                                                                          879 21 6                       737                                     22 -                               RRn 0                                                                           070 7                                                               23 8                     876                                     24                                 871 9                     874                                     25                                 867 10                     874                                                                         873 26 3g                     874                                                                         872 27 12                     873                                                                         871 23                                                                             fI g3                     870                                                                         870 29 14                     874                                     30                                 875                                 1 15                     374                                     31                                 877       #
384 Deceder, 1982 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
16                     874 l
(MWe-Net) 3 873 g7 877' 2
871 s'
gg 873 3
826 gg 876 4
33 20 876 386 5
21 879 6
737 22 -
RRn 0
7 23 070 8
876 24 871 9
874 25 867 10 874 26 873 3g 874 27 872 f
12 873 871 23 I
g3 870 870 29 14 874 30 875 1
15 374 31 877 16 874 l
l l
l l
INSTRUCTIONS                       ;
INSTRUCTIONS l
l On this format. list the average daily unit power lese! in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
On this format. list the average daily unit power lese! in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) 8303080170 830107 gDRADOCK 05000346 PDR
(9/77) 8303080170 830107 gDRADOCK 05000346 PDR n -
* n_- ,,. - - .          ,.          . , . , , _ .      . - - - ,


s s
s s
OPERATING DATA REPORT DOCKET NO. 50-346 DATE January /, 1983
OPERATING DATA REPORT DOCKET NO.
                  '                                                                                    COMPLETED BY Bilal Sarsour TELEPHONE     419-259-5000. Ext, 384 OPERATING STATUS
50-346 DATE January /, 1983 COMPLETED BY Bilal Sarsour TELEPHONE 419-259-5000. Ext, 384
[
[
Davis-Besse Unit i                                Notes
OPERATING STATUS
: 1. Unit Name:
: 1. Unit Name:
: 2. Reporting Period:         December. 1982
Davis-Besse Unit i Notes
: 3. Licensed Thermal Power (MWt):           2772                       ,
: 2. Reporting Period:
: 4. Nameplate Rating (Gross MWe):             925
December. 1982
: 5. Design Electrical Rating (Net MWe):       906
: 3. Licensed Thermal Power (MWt):
: 6. Maximum Dependable Capacity (Gross MWe):         918
2772 925
: 7. Maximum Dependable Capacity (Net MWe):           874 8.. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
: 4. Nameplate Rating (Gross MWe):
                                                                                        ~
: 5. Design Electrical Rating (Net MWe):
906
: 6. Maximum Dependable Capacity (Gross MWe):
918
: 7. Maximum Dependable Capacity (Net MWe):
874 8.. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
~
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 10. Revons For Restrictions.If Any:
: 10. Revons For Restrictions.If Any:
This Month             Yr.-to-Date         Cumulative
This Month Yr.-to-Date Cumulative
: 11. Hours in Reporting Period                                   744                 8,760             38,761
: 11. Hours in Reporting Period 744 8,760 38,761
: 12. Number Of Hours Reactor Was Critical                         744                 4,665.5           20,895.5 13' Reactor Reserve Shutdown Hours                                 0                     29.4           3,364.1
: 12. Number Of Hours Reactor Was Critical 744 4,665.5 20,895.5 13' Reactor Reserve Shutdown Hours 0
: 14. Hours Generator On-Line                                     729.4               4,509.4           19,759.6
29.4 3,364.1
: 15. Unit Reserve Shutdown Hours                                     0                     1.1           1.732.5
: 14. Hours Generator On-Line 729.4 4,509.4 19,759.6
: 16. Gross Thermal Energy Generated (MWH)                 1,926,651             10,251,236           45,372,761
: 15. Unit Reserve Shutdown Hours 0
: 17. Gross Electrical Energy Generated (MWH)                 646,648 _,         3,423,453           15,105,654
1.1 1.732.5
: 18. Net Electrical Energy Generated (MWH)                   613,947           3,218,155           14,115,440
: 16. Gross Thermal Energy Generated (MWH) 1,926,651 10,251,236 45,372,761
: 19. Unit Service Factor                                           98.0                   51. 5             51.0
: 17. Gross Electrical Energy Generated (MWH) 646,648 _,
: 20. Unit Availability Factor                                       98.0                   51.5               55.4
3,423,453 15,105,654
: 21. Unit Capacity Factor iUsing MDC Net)                           94.4                   42.0               41.7
: 18. Net Electrical Energy Generated (MWH) 613,947 3,218,155 14,115,440
: 22. Unit Capacity Factor (Using DER Net)                           91.1                   40.5               40.2
: 19. Unit Service Factor 98.0
: 23. Unit Forced Outage Rate                                         0                     1.1               20.6
: 51. 5 51.0
: 20. Unit Availability Factor 98.0 51.5 55.4
: 21. Unit Capacity Factor iUsing MDC Net) 94.4 42.0 41.7
: 22. Unit Capacity Factor (Using DER Net) 91.1 40.5 40.2
: 23. Unit Forced Outage Rate 0
1.1 20.6
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
l             25. If Shut Down At End Of Report Period. Estimated Date of Startup:
l
: 26. Units in Test Status (Prior to Commercial Operation):                         Forecast           Achiesed INITIAL CRITICALI f Y                                                                 -
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
INITIA L ELECTRICITY COMMFRCIA L OPERATION (4/77)
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALI f Y INITIA L ELECTRICITY COMMFRCIA L OPERATION (4/77)
(
(
* l t
 
* DOCKET NO.         50-346                ',    -
l t
UNIT S!!U1 DOWNS AND PObut REDUCliONS
50-346 DOCKET NO.
* UNIT NAME Davis-Besse Unit 1
UNIT S!!U1 DOWNS AND PObut REDUCliONS UNIT NAME Davis-Besse Unit 1 DATE January 7. 1983 COMPLETED BY Bilal Sarsour REPORT MONTil December, 1982 TELFPilONE 419-259-5000. Ext. 384 1.
  !                                                                                                                                                DATE January 7. 1983 COMPLETED BY         Bilal Sarsour REPORT MONTil December, 1982                                               419-259-5000. Ext. 384 TELFPilONE 1 .
"t.=
                                                                            "t.=                               c 3j
c
  '!f                                  *
._5 E 3
                                                    ._5 E                           Licensee       ,Eg         E*                       Cause & Corrective N' ' .       Date     .k       3g               }.!I5 g&         Event         sT A0 E. ,,                        Action tu                                      '
}.!I5 Licensee
  !l F
,Eg E*
                                                    $5         @    j if, g       Report *
Cause & Corrective E.,,
[15' Prevent Recurrence .
Action tu f
      ~
N' '.
Date
.k 3g j
g&
Event sT
[1
!l
$5 j if, g Report
* A0 5'
Prevent Recurrence.
F
~
b
b
  -l                                                                                                                                                                         -
-l 9
9        82 12 04     S       14.6       B         9
82 12 04 S
                                                                                  ~
14.6 B
The turbine was taken off line for
9 The turbine was taken off line for
                                                          -                                                              balancing of the low pressure tur-bine rotor, but the reactor stayed critical.
~
balancing of the low pressure tur-bine rotor, but the reactor stayed critical.
i
i
                                                                                                                                                                                        =
=
  ,, i .
,, i t
t i
i k
k l                       2                                                   3                                       4 l             F: Forced             Reason:                                                 Methted:                               Exhibit G.Insisuctions S: Scliedu!cd         A. Equipment Failure (Explain)                         1. Manual                             fer Preparation of Data
l 2
,1                                           B.Mainienance of Test                                   2 Manual S: rani.                     Entry Sliects for Lkensee C Refueling                                             3-Automatic Scram.                     Event Report (LERI File (NUREG-
3 4
,                                            D Regulatory Restriction                               4-Continuation from Previous Month     0161) l                                           E. Operator Training & License Examination             5-Load Reduction
l F: Forced Reason:
!                                            F Administrative                                      l 9-Other (Explain) l                                           C Operatiimal linor (Explain)                                                                 Exfiibis 1.Same Source j               l's/77)                     Il-Oiher (Explin)
Methted:
Exhibit G.Insisuctions S: Scliedu!cd A. Equipment Failure (Explain)
: 1. Manual fer Preparation of Data
,1 B.Mainienance of Test 2 Manual S: rani.
Entry Sliects for Lkensee C Refueling 3-Automatic Scram.
Event Report (LERI File (NUREG-D Regulatory Restriction 4-Continuation from Previous Month 0161) 5-Load Reduction l
E. Operator Training & License Examination l 9-Other (Explain)
F Administrative l
C Operatiimal linor (Explain)
Exfiibis 1.Same Source j
l's/77)
Il-Oiher (Explin)
I
I


Line 94: Line 141:


==SUMMARY==
==SUMMARY==
DECEMBER, 1982 l
DECEMBER, 1982 l
12/1/82 - 12/4/82 Reactor power was maintained at approximately 99 percent power until 1900 hours on December 3, 1982 when power was reduced.
12/1/82 - 12/4/82 Reactor power was maintained at approximately 99 percent power until 1900 hours on December 3, 1982 when power was reduced.
A manual reduction of reactor power was initiated
A manual reduction of reactor power was initiated due to a low pressure turbine vibration problem.
          .                due to a low pressure turbine vibration problem.
The turbine was taken off line at 0200 hours on December 4,1982 for balancing of the low pressure turbine rotor, but the reactor was maintained critical. The balancing was expected due to the I
The turbine was taken off line at 0200 hours on December 4,1982 for balancing of the low pressure turbine rotor, but the reactor was maintained critical. The balancing was expected due to the I                           extensive turbine work done during the Refueling Outage.
extensive turbine work done during the Refueling Outage.
The turbine-generator was fynchronized on line at 1633 hours on December 4, 1982.
The turbine-generator was fynchronized on line at 1633 hours on December 4, 1982.
12/5/82 - 12/31/82 Reactor power was slowly increased to apprc~'~ately full power and maintained for the rest of the month.
12/5/82 - 12/31/82 Reactor power was slowly increased to apprc~'~ately full power and maintained for the rest of the month.
Line 106: Line 152:
L
L


    ._.                      -      ._                                    -          __                    - _ . .    . _ . .            . = -_.
. = -_.
M
M
          ..                                                                                                                                                =
=
4 REFUELING INFORMATION                                         DATE: December, 1982
4 REFUELING INFORMATION DATE: December, 1982 1.
: 1. Name of facility: Davis-Besse Unit 1
Name of facility: Davis-Besse Unit 1 2.
: 2. Scheduled date for next. refueling shutdown:             September 3. 1983
Scheduled date for next. refueling shutdown:
: 3. Scheduled date for restart following-refueling: October 29, 1983
September 3. 1983 3.
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? If answer is yes, what in general will these be? If answer is no, has the
Scheduled date for restart following-refueling: October 29, 1983 4.
                        ,    reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? If answer is yes, what in general will these be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?
l                           Ans: Expect the Reload Report to require standard reload fuel design
l Ans: Expect the Reload Report to require standard reload fuel design Technical Specification (3/4.1 Reactivity Control Systems and 3/4.2 Power Distribution Limits).
!                          Technical Specification (3/4.1 Reactivity Control Systems and 3/4.2 Power Distribution Limits).
^
                                                                          ^
5.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information: July, 1983
Scheduled date(s) for submitting proposed licensing action and supporting information: July, 1983 6.
: 6. Important licensing considerations associcted with refueling, e.g.,
Important licensing considerations associcted with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or perfercance analysis methods, significant changes in fuel design, new operating procedures.
new or different fuel design or supplier, unreviewed design or perfercance analysis methods, significant changes in fuel design, new operating procedures.
Ans: None identified to date.
Ans: None identified to date.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
7.
;                            (a) 177                         (b) 92 - Spent Fuel Assemblies
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 177 (b) 92 - Spent Fuel Assemblies 8.
l Present: 735                         Increase size by: 0 (zero)
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the prusent licensed capacity.
l Present: 735 Increase size by: 0 (zero) 9.
t                           Date:       1992 - annuming ability to unload the entire core into the spent fuel pool is maintained.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the prusent licensed capacity.
t Date:
1992 - annuming ability to unload the entire core into the spent fuel pool is maintained.
I
I
{
{
i i
i i
e
e e.e.,
              -- , - ,            ,-          e.e., -----,        , , ,    --.,.-4       -n< - . ~ - - - -         ,,-        -.<-a ,.w n--     ..- -,}}
--.,.-4
-n<
-. ~ - - - -
-.<-a
,.w n--
..- -,}}

Latest revision as of 06:54, 15 December 2024

Monthly Operating Rept for Dec 1982
ML20071C849
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/07/1983
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20071C845 List:
References
NUDOCS 8303080170
Download: ML20071C849 (5)


Text

_ _ _

AVERAGE DAILY UNIT POWER LEVEL s.

DOCKET NO.

50-346 1

UNIT Davis-Besse Unit 1 DATE January 7, 1983 COMPLETED BY Bilal Sarsour TELEPHONE 419-259-5000, Ext..

384 Deceder, 1982 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 3 873 g7 877' 2

871 s'

gg 873 3

826 gg 876 4

33 20 876 386 5

21 879 6

737 22 -

RRn 0

7 23 070 8

876 24 871 9

874 25 867 10 874 26 873 3g 874 27 872 f

12 873 871 23 I

g3 870 870 29 14 874 30 875 1

15 374 31 877 16 874 l

l l

INSTRUCTIONS l

On this format. list the average daily unit power lese! in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 8303080170 830107 gDRADOCK 05000346 PDR n -

s s

OPERATING DATA REPORT DOCKET NO.

50-346 DATE January /, 1983 COMPLETED BY Bilal Sarsour TELEPHONE 419-259-5000. Ext, 384

[

OPERATING STATUS

1. Unit Name:

Davis-Besse Unit i Notes

2. Reporting Period:

December. 1982

3. Licensed Thermal Power (MWt):

2772 925

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

906

6. Maximum Dependable Capacity (Gross MWe):

918

7. Maximum Dependable Capacity (Net MWe):

874 8.. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

~

9. Power Level To Which Restricted,if Any (Net MWe):
10. Revons For Restrictions.If Any:

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 744 8,760 38,761
12. Number Of Hours Reactor Was Critical 744 4,665.5 20,895.5 13' Reactor Reserve Shutdown Hours 0

29.4 3,364.1

14. Hours Generator On-Line 729.4 4,509.4 19,759.6
15. Unit Reserve Shutdown Hours 0

1.1 1.732.5

16. Gross Thermal Energy Generated (MWH) 1,926,651 10,251,236 45,372,761
17. Gross Electrical Energy Generated (MWH) 646,648 _,

3,423,453 15,105,654

18. Net Electrical Energy Generated (MWH) 613,947 3,218,155 14,115,440
19. Unit Service Factor 98.0
51. 5 51.0
20. Unit Availability Factor 98.0 51.5 55.4
21. Unit Capacity Factor iUsing MDC Net) 94.4 42.0 41.7
22. Unit Capacity Factor (Using DER Net) 91.1 40.5 40.2
23. Unit Forced Outage Rate 0

1.1 20.6

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALI f Y INITIA L ELECTRICITY COMMFRCIA L OPERATION (4/77)

(

l t

50-346 DOCKET NO.

UNIT S!!U1 DOWNS AND PObut REDUCliONS UNIT NAME Davis-Besse Unit 1 DATE January 7. 1983 COMPLETED BY Bilal Sarsour REPORT MONTil December, 1982 TELFPilONE 419-259-5000. Ext. 384 1.

"t.=

c

._5 E 3

}.!I5 Licensee

,Eg E*

Cause & Corrective E.,,

Action tu f

N' '.

Date

.k 3g j

g&

Event sT

[1

!l

$5 j if, g Report

  • A0 5'

Prevent Recurrence.

F

~

b

-l 9

82 12 04 S

14.6 B

9 The turbine was taken off line for

~

balancing of the low pressure tur-bine rotor, but the reactor stayed critical.

i

=

,, i t

i k

l 2

3 4

l F: Forced Reason:

Methted:

Exhibit G.Insisuctions S: Scliedu!cd A. Equipment Failure (Explain)

1. Manual fer Preparation of Data

,1 B.Mainienance of Test 2 Manual S: rani.

Entry Sliects for Lkensee C Refueling 3-Automatic Scram.

Event Report (LERI File (NUREG-D Regulatory Restriction 4-Continuation from Previous Month 0161) 5-Load Reduction l

E. Operator Training & License Examination l 9-Other (Explain)

F Administrative l

C Operatiimal linor (Explain)

Exfiibis 1.Same Source j

l's/77)

Il-Oiher (Explin)

I

OPERATIONAL

SUMMARY

DECEMBER, 1982 l

12/1/82 - 12/4/82 Reactor power was maintained at approximately 99 percent power until 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> on December 3, 1982 when power was reduced.

A manual reduction of reactor power was initiated due to a low pressure turbine vibration problem.

The turbine was taken off line at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> on December 4,1982 for balancing of the low pressure turbine rotor, but the reactor was maintained critical. The balancing was expected due to the I

extensive turbine work done during the Refueling Outage.

The turbine-generator was fynchronized on line at 1633 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.213565e-4 months <br /> on December 4, 1982.

12/5/82 - 12/31/82 Reactor power was slowly increased to apprc~'~ately full power and maintained for the rest of the month.

1 a

I l

L

. = -_.

M

=

4 REFUELING INFORMATION DATE: December, 1982 1.

Name of facility: Davis-Besse Unit 1 2.

Scheduled date for next. refueling shutdown:

September 3. 1983 3.

Scheduled date for restart following-refueling: October 29, 1983 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? If answer is yes, what in general will these be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

l Ans: Expect the Reload Report to require standard reload fuel design Technical Specification (3/4.1 Reactivity Control Systems and 3/4.2 Power Distribution Limits).

^

5.

Scheduled date(s) for submitting proposed licensing action and supporting information: July, 1983 6.

Important licensing considerations associcted with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or perfercance analysis methods, significant changes in fuel design, new operating procedures.

Ans: None identified to date.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 177 (b) 92 - Spent Fuel Assemblies 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

l Present: 735 Increase size by: 0 (zero) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the prusent licensed capacity.

t Date:

1992 - annuming ability to unload the entire core into the spent fuel pool is maintained.