TXX-3624, Final Deficiency Rept Re Procurement & Installation of Nonmetallic Insulation.Initially Reported on 830126.Matter Not Reportable Per 10CFR50.55(e): Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:TEXAS UTILITIES GENERATING COMIRNY a,ni n,nm un, en nu.imem mno .o e
{{#Wiki_filter:TEXAS UTILITIES GENERATING COMIRNY a,ni n,nm un, en nu.imem mno.o e
'":b$b "."N:.':'
'":b$b "."N:.':'
February 25, 1983 TXX-3624 kb$kYY .
February 25, 1983 TXX-3624 kb$kYY.
W Mr. G. L. Madsen, Chief                                         (       S 28 2     L; p/
W Mr. G. L. Madsen, Chief
Reactor Project Branch 1                                         \                 IE U. S. Nuclear Regulatory Commission                           '
(
Office of Inspection and Enforcement 611 Ryan P1aza Drive, Suite 1000                             Docket Nos.: 50-445 Arlington, Texas 76012                                                       50-446 COMANCHE PEAK STEAM ELECTRIC-STATION NON-METALLIC INSULATION QA, FILE:       CP-83-03; SDAR-103 FILE NO.: 10110
S 28 2 L; p/
Reactor Project Branch 1
\\
IE U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan P1aza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC-STATION NON-METALLIC INSULATION QA, FILE:
CP-83-03; SDAR-103 FILE NO.:
10110


==Dear Mr. Madsen:==
==Dear Mr. Madsen:==
On January 26, 1983, we verbally informed your Mr. R. G. Taylor of a deficiency regarding procurement and installation of non-metallic insulation.
On January 26, 1983, we verbally informed your Mr. R. G. Taylor of a deficiency regarding procurement and installation of non-metallic insulation.
We have completed our investigation and concluded that the matter is not report-able under 10 CFR 50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site.
We have completed our investigation and concluded that the matter is not report-able under 10 CFR 50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site.
Very truly yours,
Very truly yours, a
* a RJG:aq cc: NRC Region IV - (0 + 1 copy)                                               -y Director, Inspection & Enforcement (15 copies)
RJG:aq cc: NRC Region IV - (0 + 1 copy)
U. S. Nuclear Regulatory Commission Washington, DC 20555 8303080188 830225 PDR ADOCK 05000445 S                 PDR
-y Director, Inspection & Enforcement (15 copies)
                                                                                                ._}}
U. S. Nuclear Regulatory Commission Washington, DC 20555 8303080188 830225 PDR ADOCK 05000445 S
PDR
._}}

Latest revision as of 07:54, 15 December 2024

Final Deficiency Rept Re Procurement & Installation of Nonmetallic Insulation.Initially Reported on 830126.Matter Not Reportable Per 10CFR50.55(e)
ML20071C865
Person / Time
Site: Comanche Peak  
Issue date: 02/25/1983
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, 19CFR-50.55E, TXX-3624, NUDOCS 8303080188
Download: ML20071C865 (1)


Text

TEXAS UTILITIES GENERATING COMIRNY a,ni n,nm un, en nu.imem mno.o e

'":b$b "."N:.':'

February 25, 1983 TXX-3624 kb$kYY.

W Mr. G. L. Madsen, Chief

(

S 28 2 L; p/

Reactor Project Branch 1

\\

IE U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan P1aza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC-STATION NON-METALLIC INSULATION QA, FILE:

CP-83-03; SDAR-103 FILE NO.:

10110

Dear Mr. Madsen:

On January 26, 1983, we verbally informed your Mr. R. G. Taylor of a deficiency regarding procurement and installation of non-metallic insulation.

We have completed our investigation and concluded that the matter is not report-able under 10 CFR 50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site.

Very truly yours, a

RJG:aq cc: NRC Region IV - (0 + 1 copy)

-y Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, DC 20555 8303080188 830225 PDR ADOCK 05000445 S

PDR

._