TXX-3583, Final Deficiency Rept Re Reinsp of Conduit Supports. Initially Reported on 820823.Investigation Determined Matter Not Reportable Per 10CFR50.55(e).Records Supporting Determination Available at Site: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:TENAS UTILITIES GENERATING COMIRNY h$(6)M:= | {{#Wiki_filter:TENAS UTILITIES GENERATING COMIRNY h$(6)M:=.LO/n: ]<a, | ||
~ =~ | |||
'":b.Ebh:::' | |||
October 20, 1982 TXX-3583 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 | gg g g l | ||
d October 20, 1982 TXX-3583 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION RE-INSPECTION OF CONDUIT SUPPORTS FILE N0.: | |||
10110 | |||
==Dear Mr. Madsen:== | ==Dear Mr. Madsen:== | ||
On August 23, 1982, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding certain conduit supports. We have submitted an interim report logged TXX-3572 dated September 20, 1982. | On August 23, 1982, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding certain conduit supports. We have submitted an interim report logged TXX-3572 dated September 20, 1982. | ||
We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site. | We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). | ||
Very truly yours, yD | Records supporting this determination are available for your Inspector's review at the CPSES site. | ||
f u R. J. Gary RJG:aq cc: | Very truly yours, yD | ||
-rw h~ | |||
f u R. J. Gary RJG:aq cc: | |||
NRC REGION IV - (0 + 1 copy) | |||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, DC 20555 (v | U. S. Nuclear Regulatory Commission Washington, DC 20555 (v | ||
$5A 988?? oggsg g | $5A 988?? oggsg g PDR}} | ||
PDR}} | |||
Latest revision as of 07:02, 15 December 2024
| ML20071P440 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/20/1982 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-3583, NUDOCS 8211020510 | |
| Download: ML20071P440 (1) | |
Text
TENAS UTILITIES GENERATING COMIRNY h$(6)M:=.LO/n: ]<a,
~ =~
'":b.Ebh:::'
gg g g l
d October 20, 1982 TXX-3583 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION RE-INSPECTION OF CONDUIT SUPPORTS FILE N0.:
10110
Dear Mr. Madsen:
On August 23, 1982, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding certain conduit supports. We have submitted an interim report logged TXX-3572 dated September 20, 1982.
We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e).
Records supporting this determination are available for your Inspector's review at the CPSES site.
Very truly yours, yD
-rw h~
f u R. J. Gary RJG:aq cc:
NRC REGION IV - (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, DC 20555 (v
$5A 988?? oggsg g PDR