PLA-1703, Interim Deficiency Rept Re Defective GE Hma Auxiliary Relays.Insp Program Completion Awaiting Receipt of GE Recommended Corrective Actions.Final Rept Scheduled for 830901: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
yy PPat         Pennsylvania Power & Light Company Two North Ninth Street
,yy PPat Pennsylvania Power & Light Company Two North Ninth Street
* Allentown, PA 18101 = 2151770L5151 54-3/9 Norman W. Curtis Vice President Engineering & Construction-Nuclear 215/770-7501 June 9, 1983 Mr. J. M. Allan Acting Regional Administrator, Region I U.S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION DEFECTIVE GE HMA AUXILIARY RELAYS ER 100508                     FILE 821-10 PLA-1703
* Allentown, PA 18101 = 2151770L5151 54-3/9 Norman W. Curtis Vice President Engineering & Construction-Nuclear 215/770-7501 June 9, 1983 Mr. J. M. Allan Acting Regional Administrator, Region I U.S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION DEFECTIVE GE HMA AUXILIARY RELAYS ER 100508 FILE 821-10 PLA-1703


==Reference:==
==Reference:==
Line 24: Line 24:


==Dear Mr. Allan:==
==Dear Mr. Allan:==
 
The referenced PLA-1528 provided the Comission with an interim report of a deficiency involving GE HMA Relays in Unit II.
The referenced PLA-1528 provided the Comission with an interim report of a deficiency involving GE HMA Relays in Unit II.                   That report, provided under the provisions of 10CFR50.55(e) , indicated that PP&L anticipated providing a final report by June 1, 1983. However, delays have been encountered in completing the inspection program and GE has not as yet provided their recomended corrective action. Therefore, the final report is currently scheduled to be submitted by September 1, 1983.
That report, provided under the provisions of 10CFR50.55(e), indicated that PP&L anticipated providing a final report by June 1, 1983. However, delays have been encountered in completing the inspection program and GE has not as yet provided their recomended corrective action. Therefore, the final report is currently scheduled to be submitted by September 1, 1983.
The above information was discussed in a telephone conversation on June 1, 1983, between Mr. John McCann, Sr. Resident Inspector, and Mr. Jason Saranga, PP&L.
The above information was discussed in a telephone conversation on June 1, 1983, between Mr. John McCann, Sr. Resident Inspector, and Mr. Jason Saranga, PP&L.
We trust the Comission will find this request acceptable.
We trust the Comission will find this request acceptable.
Very truly yours, P
Very truly yours, P
      -N. W. Curtis Vice President-Engineering & Construction-Nuclear JS:sab OS         7 S                       PDR 4&}q
-N. W. Curtis Vice President-Engineering & Construction-Nuclear JS:sab OS 7
&}
S PDR 4 q


        -\ .
-\\.
  ,.o.\'
,.o.\\'
June 9, 1983                           SSES         -PLA-1703 ER 100508     File 821-10 Mr. J. M. Allan cc Mr. Richard C. DeYoung (15)
June 9, 1983 SSES
-PLA-1703 ER 100508 File 821-10 Mr. J. M. Allan cc Mr. Richard C. DeYoung (15)
Director-Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 1
Director-Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 1
Mr. G. Mcdonald, Director Office of Management Information & Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 J
Mr. G. Mcdonald, Director Office of Management Information & Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 J
Mr. John McCann.
Mr. John McCann.
,                  U.S. Nuclear Regulatory Commission P.O. Box 52 Shickshinny, PA 18655 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GE 30339 i
U.S. Nuclear Regulatory Commission P.O. Box 52 Shickshinny, PA 18655 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GE 30339 i
I
I
\
\\
l l
l l
  ,, .          ,      -    _            ,              _  --    . .    ,          - ,}}
,}}

Latest revision as of 05:00, 15 December 2024

Interim Deficiency Rept Re Defective GE Hma Auxiliary Relays.Insp Program Completion Awaiting Receipt of GE Recommended Corrective Actions.Final Rept Scheduled for 830901
ML20072J950
Person / Time
Site: Susquehanna  
Issue date: 06/09/1983
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Allan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, PLA-1703, NUDOCS 8307010099
Download: ML20072J950 (2)


Text

-

,yy PPat Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101 = 2151770L5151 54-3/9 Norman W. Curtis Vice President Engineering & Construction-Nuclear 215/770-7501 June 9, 1983 Mr. J. M. Allan Acting Regional Administrator, Region I U.S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION DEFECTIVE GE HMA AUXILIARY RELAYS ER 100508 FILE 821-10 PLA-1703

Reference:

PLA-1528 dated 2/18/83 N. W. Curtis to R. C. Haynes

Dear Mr. Allan:

The referenced PLA-1528 provided the Comission with an interim report of a deficiency involving GE HMA Relays in Unit II.

That report, provided under the provisions of 10CFR50.55(e), indicated that PP&L anticipated providing a final report by June 1, 1983. However, delays have been encountered in completing the inspection program and GE has not as yet provided their recomended corrective action. Therefore, the final report is currently scheduled to be submitted by September 1, 1983.

The above information was discussed in a telephone conversation on June 1, 1983, between Mr. John McCann, Sr. Resident Inspector, and Mr. Jason Saranga, PP&L.

We trust the Comission will find this request acceptable.

Very truly yours, P

-N. W. Curtis Vice President-Engineering & Construction-Nuclear JS:sab OS 7

&}

S PDR 4 q

-\\.

,.o.\\'

June 9, 1983 SSES

-PLA-1703 ER 100508 File 821-10 Mr. J. M. Allan cc Mr. Richard C. DeYoung (15)

Director-Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 1

Mr. G. Mcdonald, Director Office of Management Information & Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 J

Mr. John McCann.

U.S. Nuclear Regulatory Commission P.O. Box 52 Shickshinny, PA 18655 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GE 30339 i

I

\\

l l

,