ML20076G339: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:_
                                                      \
\\
e N
e
WISCONSIN Electnc m coumr
' N WISCONSIN Electnc m coumr
( 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE. WI 53201 August 8, 1983 K
( 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE. WI 53201 August 8, 1983 K
Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention:                   Mr. R. A. Clark, Chief Operating Reactors Branch 3                               -
Mr. H.
Gentlemen:
R. Denton, Director Office of Nuclear Reactor Regulation U.
S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Attention:
Mr. R. A. Clark, Chief Operating Reactors Branch 3 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
                                                                    . Enclosed are two copies of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures. These revisions consist of page changes which should be filed in your copies of the procedures in accordance with the attached instructions.
. Enclosed are two copies of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures.
These revisions consist of page changes which should be filed in your copies of the procedures in accordance with the attached instructions.
Please return the receipt form for these two copies to:
Please return the receipt form for these two copies to:
Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours,
Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours,
                                                                                                                    ..  'l
'l
                                                                                                                            ,i Vice PresidentaNuclear Power C. W. Fay Attachments Copies to NRC Resident Inspector Incident Response Center, Region III
,i Vice PresidentaNuclear Power C. W.
      ..                                                                                                                                s ps s
Fay Attachments Copies to NRC Resident Inspector Incident Response Center, Region III s
h   '
h
    ;E\       ~                                                  '
;E\\
                                                                                                                                      ) f
) f s
                                                            \.
ps
1 8308310150 830025 PDR ADOCK 05000266 F                                                   PDR
~
\\.
1 8308310150 830025 PDR ADOCK 05000266 F
PDR


                                      , ,  3  .- u         7c -
(/.
(/.                  - r c>. ~         r.,          ~/              ,
.- u 7c -
                        ~'r.                           '
3
* Ir
- r
                                      /
~/
July 29, 1983 a                                                                         ,e
c>. ~
  .              /                                  3
r.,
                                                        ~
~'r.
l          (      5?' & h I               sv             i                                               Y          N
I r
            /~   ,_r ' -
/
                            /                                             POINT BEACH NUCLEAR PLANT EMERGENCY PIAN IMPLEMENTING PROCEDURES
July 29, 1983 a
    .s      }'
,e l
d                     The following revised' procedures are attached and should be inserted into your manual. Please destroy all revisions removed from your manual.
(
5?' & h
~
/
3 Y
N I
sv i
/ ~
/
POINT BEACH NUCLEAR PLANT
,_r ' -
EMERGENCY PIAN IMPLEMENTING PROCEDURES
}'
.s d
The following revised' procedures are attached and should be inserted into your manual. Please destroy all revisions removed from your manual.
s
s
_ < '"1.                 EPIP 7.3.2, " Post-Accident Sampling & Analysis of Potentially High Level
'"1.
                    -                    Reactor Coolant," Revision 7. dated 07-15-33.
EPIP 7.3.2, " Post-Accident Sampling & Analysis of Potentially High Level Reactor Coolant," Revision 7. dated 07-15-33.
        -                              y
(h y
        '        ~ ~ '
(h     ~
EPIP 7.3.3, " Post-Accident Sampling of Containment Atmosphere,"
EPIP 7.3.3, " Post-Accident Sampling of Containment Atmosphere,"
                    ..                    Revision 6, dated 07-15-63.
~ ~ '
3 .                       The following revised forms are attached for insertion into your manual.
~
j,        >      Please attach the form to the indicated procedure and destroy all revisions removed from your manual.
Revision 6, dated 07-15-63.
              /
3.
                ,'/             1.       EPIP-30 (07-83), '' Reactor Coolant Post-Accident Sampling Analysis Report" (attach to EPIP.7.3.2).
The following revised forms are attached for insertion into your manual.
: 2.       EPIP-31 (07-83), " Containment Atmosphere Post-Accident Sampling Analysis Report" (attach to EPIP;7.3.3).
Please attach the form to the indicated procedure and destroy all revisions j,
removed from your manual.
,'/
1.
EPIP-30 (07-83), '' Reactor Coolant Post-Accident Sampling Analysis Report"
/
(attach to EPIP.7.3.2).
2.
EPIP-31 (07-83), " Containment Atmosphere Post-Accident Sampling Analysis Report" (attach to EPIP;7.3.3).
Also attached is a revised listing of the Table of Contents to be inserted into your manual. Please dectroy the old revision.
Also attached is a revised listing of the Table of Contents to be inserted into your manual. Please dectroy the old revision.
Also attached is a revised Table of EPIP Forms. Please insert this table into your manual. Please destroy the old revision.
Also attached is a revised Table of EPIP Forms. Please insert this table into your manual. Please destroy the old revision.
Please fill out the attached receipt form and return it to Ms. F. A. Flentje at the Point Beach Nuclear Plant.
Please fill out the attached receipt form and return it to Ms. F. A. Flentje at the Point Beach Nuclear Plant.
                                                                                                              -7 j ,' .
-7 j,'.
J. E. Knorr                                                               .
J. E. Knorr
(/
(/
Attachments POINT BEACH NUCLEAR PLANT EMERGENCY PLAN IMPIL M ING PROCEDURES JULY 29, 1983 I hereby acknowledge receipt of EPIP 7.3.2 and EPIP 7.3.3 and have inJerted t_-     into my manual.
Attachments POINT BEACH NUCLEAR PLANT EMERGENCY PLAN IMPIL M ING PROCEDURES JULY 29, 1983 I hereby acknowledge receipt of EPIP 7.3.2 and EPIP 7.3.3 and have inJerted t_-
                                      ~
into my manual.
~
Date}}
Date}}

Latest revision as of 02:40, 15 December 2024

Forwards Public Version of Revised Emergency Plan Implementing Procedures EPIP 7.3.2, Post-Accident Sampling & Analysis of Potentially High Level Reactor Coolant & 7.3.3, Post-Accident Sampling of Containment Atmosphere
ML20076G339
Person / Time
Site: Point Beach  
Issue date: 08/08/1983
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20076G333 List:
References
NUDOCS 8308310150
Download: ML20076G339 (2)


Text

_

\\

e

' N WISCONSIN Electnc m coumr

( 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE. WI 53201 August 8, 1983 K

Mr. H.

R. Denton, Director Office of Nuclear Reactor Regulation U.

S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Attention:

Mr. R. A. Clark, Chief Operating Reactors Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

. Enclosed are two copies of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures.

These revisions consist of page changes which should be filed in your copies of the procedures in accordance with the attached instructions.

Please return the receipt form for these two copies to:

Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours,

'l

,i Vice PresidentaNuclear Power C. W.

Fay Attachments Copies to NRC Resident Inspector Incident Response Center, Region III s

h

E\\

) f s

ps

~

\\.

1 8308310150 830025 PDR ADOCK 05000266 F

PDR

(/.

.- u 7c -

3

- r

~/

c>. ~

r.,

~'r.

I r

/

July 29, 1983 a

,e l

(

5?' & h

~

/

3 Y

N I

sv i

/ ~

/

POINT BEACH NUCLEAR PLANT

,_r ' -

EMERGENCY PIAN IMPLEMENTING PROCEDURES

}'

.s d

The following revised' procedures are attached and should be inserted into your manual. Please destroy all revisions removed from your manual.

s

'"1.

EPIP 7.3.2, " Post-Accident Sampling & Analysis of Potentially High Level Reactor Coolant," Revision 7. dated 07-15-33.

(h y

EPIP 7.3.3, " Post-Accident Sampling of Containment Atmosphere,"

~ ~ '

~

Revision 6, dated 07-15-63.

3.

The following revised forms are attached for insertion into your manual.

Please attach the form to the indicated procedure and destroy all revisions j,

removed from your manual.

,'/

1.

EPIP-30 (07-83), Reactor Coolant Post-Accident Sampling Analysis Report"

/

(attach to EPIP.7.3.2).

2.

EPIP-31 (07-83), " Containment Atmosphere Post-Accident Sampling Analysis Report" (attach to EPIP;7.3.3).

Also attached is a revised listing of the Table of Contents to be inserted into your manual. Please dectroy the old revision.

Also attached is a revised Table of EPIP Forms. Please insert this table into your manual. Please destroy the old revision.

Please fill out the attached receipt form and return it to Ms. F. A. Flentje at the Point Beach Nuclear Plant.

-7 j,'.

J. E. Knorr

(/

Attachments POINT BEACH NUCLEAR PLANT EMERGENCY PLAN IMPIL M ING PROCEDURES JULY 29, 1983 I hereby acknowledge receipt of EPIP 7.3.2 and EPIP 7.3.3 and have inJerted t_-

into my manual.

~

Date