{{#Wiki_filter:. . _    _ . . _
{{#Wiki_filter:q r
q       r w
w Tennessee Vaey Authonty. Post Offee Box 2000 Soccy-Daisy. Tennessee 37379 i
Tennessee Vaey Authonty. Post Offee Box 2000 Soccy-Daisy. Tennessee 37379 i
February 6,1995 m
February 6,1995 m
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555                                                                                           ,
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
Gentlemen:                                                                                                       1 in the Matter of                                                     ) Docket No. 50-328                         ,
in the Matter of
Tennessee Valley Authority                                             )                                           l SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 CYCLE 6, 90-DAY IN-SERVICE INSPECTION (ISI)  
)
Docket No. 50-328 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 CYCLE 6, 90-DAY IN-SERVICE INSPECTION (ISI)  


==SUMMARY==
==SUMMARY==
Line 29: Line 31:


==References:==
==References:==
: 1. TVA letter to NRC dated February 22,1994, "Sequoyah Nuclear Plant (SON) - Technical Specification (TS)
1.
TVA letter to NRC dated February 22,1994, "Sequoyah Nuclear Plant (SON) - Technical Specification (TS)
Change 92-16, ' Deletion of Supplemental Examination of the Reactor Pressure Vessel Nozzles From the TS'"
Change 92-16, ' Deletion of Supplemental Examination of the Reactor Pressure Vessel Nozzles From the TS'"
: 2. NRC letter to TVA dated March 15,1994, " Issuance of
2.
.'                                                                                      Amendments (TAC Nos. M85308 and M85309) (TS 92-16)"
NRC letter to TVA dated March 15,1994, " Issuance of Amendments (TAC Nos. M85308 and M85309) (TS 92-16)"
Enclosed is SON's Unit 2 Cycle 6 !SI Summary Report (Volumes 1 and 2) that contains a historical record of repairs, replacements, and ISI examinations and augmented examinations that were performed on American Society of Mechanical Engineers (ASME) Code Class 1 and 2 components from May 17,1992, to November 16,1994.
Enclosed is SON's Unit 2 Cycle 6 !SI Summary Report (Volumes 1 and 2) that contains a historical record of repairs, replacements, and ISI examinations and augmented examinations that were performed on American Society of Mechanical Engineers (ASME) Code Class 1 and 2 components from May 17,1992, to November 16,1994.
In addition, this repoti contains the results of augmented ISI examinations that were performed on the Unit 2 reactor vessel nozzle cladding. These examinations were performed in accordance with TVA commitments described in the above references. The nozzle examinations found no unacceptable indications.
In addition, this repoti contains the results of augmented ISI examinations that were performed on the Unit 2 reactor vessel nozzle cladding. These examinations were performed in accordance with TVA commitments described in the above references. The nozzle examinations found no unacceptable indications.
TVA plans to perform a second examination of the Unit 1 reactor vessel nozzle cladding near the end of SON's second 10-year ISI interval. At that time, based on th3 results of the second Unit 1 examination, TVA plans to evaluate the need for performing a second Unit 2 examination.
TVA plans to perform a second examination of the Unit 1 reactor vessel nozzle cladding near the end of SON's second 10-year ISI interval. At that time, based on th3 results of the second Unit 1 examination, TVA plans to evaluate the need for performing a second Unit 2 examination.
9502100084 950206                                                                                   r PDR   ADDCK 05000328                                                                                 i g                           PDR                                                         pr'I i
9502100084 950206 r
: p.         -
PDR ADDCK 05000328 g
PDR pr'I i
i
 
p.
c a m.
c a m.
b t' .3. ""
b t'.3. ""
U.S. Nuclear Regulatory Commission                                                 :
U.S. Nuclear Regulatory Commission Page 2.
Page 2.                                                                           >
February 6,1995-Please note that this ISI Summary Report is being provided in accordance with IWA-6220 and IWA-6250 of ASME Code, Section XI; while the nozzle examination results are being provided as stated above.
February 6,1995-Please note that this ISI Summary Report is being provided in accordance with IWA-6220 and IWA-6250 of ASME Code, Section XI; while the nozzle
Please direct questions concerning this issue to Don Goodin at (615) 843-7734.
,            examination results are being provided as stated above.
Please direct questions concerning this issue to Don Goodin at (615)               '
843-7734.                                                                         ;
Sincerely,
Sincerely,
[, N-i R. H. Shell Manager                                                                             <
[, N-i R. H. Shell Manager SON Site Licensing l
SON Site Licensing                                                                 l Enclosures                                                                         :
Enclosures cc: Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North i
cc: Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission                                                 ;
11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711
One White Flint, North                                                         i 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector                                                         ;
Sequoyah Nuclear Plant                                                         '
2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l
l l
l 1


TENNESSEE VALLEY AUTHORITY                                               !
TENNESSEE VALLEY AUTHORITY SON NIS-1 OWNERS DATA REPORT l
SON                                                           '
Unit 2
NIS-1 OWNERS DATA REPORT                                                     !
/
l Unit 2
Cycle 6
                          /                                                         '
/
Cycle 6                                                 ;
?Ufd II
                  /                                                                   :
.}}
                                            ?Ufd II
_ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _}}

Latest revision as of 22:07, 14 December 2024

Forwards SQN NIS-1 Owners Data Rept Unit 2 Cycle 6, Vols 1 & 2
ML20080G852
Person / Time
Site: Sequoyah 
Issue date: 02/06/1995
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20080G855 List:
References
NUDOCS 9502100084
Download: ML20080G852 (2)


Text

q r

w Tennessee Vaey Authonty. Post Offee Box 2000 Soccy-Daisy. Tennessee 37379 i

February 6,1995 m

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

in the Matter of

)

Docket No. 50-328 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 CYCLE 6, 90-DAY IN-SERVICE INSPECTION (ISI)

SUMMARY

REPORT

References:

1.

TVA letter to NRC dated February 22,1994, "Sequoyah Nuclear Plant (SON) - Technical Specification (TS)

Change 92-16, ' Deletion of Supplemental Examination of the Reactor Pressure Vessel Nozzles From the TS'"

2.

NRC letter to TVA dated March 15,1994, " Issuance of Amendments (TAC Nos. M85308 and M85309) (TS 92-16)"

Enclosed is SON's Unit 2 Cycle 6 !SI Summary Report (Volumes 1 and 2) that contains a historical record of repairs, replacements, and ISI examinations and augmented examinations that were performed on American Society of Mechanical Engineers (ASME) Code Class 1 and 2 components from May 17,1992, to November 16,1994.

In addition, this repoti contains the results of augmented ISI examinations that were performed on the Unit 2 reactor vessel nozzle cladding. These examinations were performed in accordance with TVA commitments described in the above references. The nozzle examinations found no unacceptable indications.

TVA plans to perform a second examination of the Unit 1 reactor vessel nozzle cladding near the end of SON's second 10-year ISI interval. At that time, based on th3 results of the second Unit 1 examination, TVA plans to evaluate the need for performing a second Unit 2 examination.

9502100084 950206 r

PDR ADDCK 05000328 g

PDR pr'I i

i

p.

c a m.

b t'.3. ""

U.S. Nuclear Regulatory Commission Page 2.

February 6,1995-Please note that this ISI Summary Report is being provided in accordance with IWA-6220 and IWA-6250 of ASME Code,Section XI; while the nozzle examination results are being provided as stated above.

Please direct questions concerning this issue to Don Goodin at (615) 843-7734.

Sincerely,

[, N-i R. H. Shell Manager SON Site Licensing l

Enclosures cc: Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North i

11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711

TENNESSEE VALLEY AUTHORITY SON NIS-1 OWNERS DATA REPORT l

Unit 2

/

Cycle 6

/

?Ufd II

.