q | w Tennessee Vaey Authonty. Post Offee Box 2000 Soccy-Daisy. Tennessee 37379 i | ||
Tennessee Vaey Authonty. Post Offee Box 2000 Soccy-Daisy. Tennessee 37379 i | |||
February 6,1995 m | February 6,1995 m | ||
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 | U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen: | ||
Gentlemen: | in the Matter of | ||
Tennessee Valley Authority | ) | ||
Docket No. 50-328 Tennessee Valley Authority | |||
) | |||
SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 CYCLE 6, 90-DAY IN-SERVICE INSPECTION (ISI) | |||
==SUMMARY== | ==SUMMARY== | ||
| Line 29: | Line 31: | ||
==References:== | ==References:== | ||
1. | |||
TVA letter to NRC dated February 22,1994, "Sequoyah Nuclear Plant (SON) - Technical Specification (TS) | |||
Change 92-16, ' Deletion of Supplemental Examination of the Reactor Pressure Vessel Nozzles From the TS'" | Change 92-16, ' Deletion of Supplemental Examination of the Reactor Pressure Vessel Nozzles From the TS'" | ||
2. | |||
NRC letter to TVA dated March 15,1994, " Issuance of Amendments (TAC Nos. M85308 and M85309) (TS 92-16)" | |||
Enclosed is SON's Unit 2 Cycle 6 !SI Summary Report (Volumes 1 and 2) that contains a historical record of repairs, replacements, and ISI examinations and augmented examinations that were performed on American Society of Mechanical Engineers (ASME) Code Class 1 and 2 components from May 17,1992, to November 16,1994. | Enclosed is SON's Unit 2 Cycle 6 !SI Summary Report (Volumes 1 and 2) that contains a historical record of repairs, replacements, and ISI examinations and augmented examinations that were performed on American Society of Mechanical Engineers (ASME) Code Class 1 and 2 components from May 17,1992, to November 16,1994. | ||
In addition, this repoti contains the results of augmented ISI examinations that were performed on the Unit 2 reactor vessel nozzle cladding. These examinations were performed in accordance with TVA commitments described in the above references. The nozzle examinations found no unacceptable indications. | In addition, this repoti contains the results of augmented ISI examinations that were performed on the Unit 2 reactor vessel nozzle cladding. These examinations were performed in accordance with TVA commitments described in the above references. The nozzle examinations found no unacceptable indications. | ||
TVA plans to perform a second examination of the Unit 1 reactor vessel nozzle cladding near the end of SON's second 10-year ISI interval. At that time, based on th3 results of the second Unit 1 examination, TVA plans to evaluate the need for performing a second Unit 2 examination. | TVA plans to perform a second examination of the Unit 1 reactor vessel nozzle cladding near the end of SON's second 10-year ISI interval. At that time, based on th3 results of the second Unit 1 examination, TVA plans to evaluate the need for performing a second Unit 2 examination. | ||
9502100084 950206 | 9502100084 950206 r | ||
PDR ADDCK 05000328 g | |||
PDR pr'I i | |||
i | |||
p. | |||
c a m. | c a m. | ||
b t' .3. "" | b t'.3. "" | ||
U.S. Nuclear Regulatory Commission | U.S. Nuclear Regulatory Commission Page 2. | ||
Page 2. | February 6,1995-Please note that this ISI Summary Report is being provided in accordance with IWA-6220 and IWA-6250 of ASME Code, Section XI; while the nozzle examination results are being provided as stated above. | ||
February 6,1995-Please note that this ISI Summary Report is being provided in accordance with IWA-6220 and IWA-6250 of ASME Code, Section XI; while the nozzle | Please direct questions concerning this issue to Don Goodin at (615) 843-7734. | ||
Please direct questions concerning this issue to Don Goodin at (615) | |||
843-7734. | |||
Sincerely, | Sincerely, | ||
[, N-i R. H. Shell Manager | [, N-i R. H. Shell Manager SON Site Licensing l | ||
SON Site Licensing | Enclosures cc: Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North i | ||
cc: Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission | 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 | ||
One White Flint, North | |||
Sequoyah Nuclear Plant | |||
2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 | |||
TENNESSEE VALLEY AUTHORITY | TENNESSEE VALLEY AUTHORITY SON NIS-1 OWNERS DATA REPORT l | ||
SON | Unit 2 | ||
NIS-1 OWNERS DATA REPORT | / | ||
Cycle 6 | |||
/ | |||
Cycle 6 | ?Ufd II | ||
.}} | |||
Latest revision as of 22:07, 14 December 2024
| ML20080G852 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/06/1995 |
| From: | Shell R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20080G855 | List: |
| References | |
| NUDOCS 9502100084 | |
| Download: ML20080G852 (2) | |
Text
q r
w Tennessee Vaey Authonty. Post Offee Box 2000 Soccy-Daisy. Tennessee 37379 i
February 6,1995 m
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
in the Matter of
)
Docket No. 50-328 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 CYCLE 6, 90-DAY IN-SERVICE INSPECTION (ISI)
SUMMARY
REPORT
References:
1.
TVA letter to NRC dated February 22,1994, "Sequoyah Nuclear Plant (SON) - Technical Specification (TS)
Change 92-16, ' Deletion of Supplemental Examination of the Reactor Pressure Vessel Nozzles From the TS'"
2.
NRC letter to TVA dated March 15,1994, " Issuance of Amendments (TAC Nos. M85308 and M85309) (TS 92-16)"
Enclosed is SON's Unit 2 Cycle 6 !SI Summary Report (Volumes 1 and 2) that contains a historical record of repairs, replacements, and ISI examinations and augmented examinations that were performed on American Society of Mechanical Engineers (ASME) Code Class 1 and 2 components from May 17,1992, to November 16,1994.
In addition, this repoti contains the results of augmented ISI examinations that were performed on the Unit 2 reactor vessel nozzle cladding. These examinations were performed in accordance with TVA commitments described in the above references. The nozzle examinations found no unacceptable indications.
TVA plans to perform a second examination of the Unit 1 reactor vessel nozzle cladding near the end of SON's second 10-year ISI interval. At that time, based on th3 results of the second Unit 1 examination, TVA plans to evaluate the need for performing a second Unit 2 examination.
9502100084 950206 r
PDR ADDCK 05000328 g
PDR pr'I i
i
p.
c a m.
b t'.3. ""
U.S. Nuclear Regulatory Commission Page 2.
February 6,1995-Please note that this ISI Summary Report is being provided in accordance with IWA-6220 and IWA-6250 of ASME Code,Section XI; while the nozzle examination results are being provided as stated above.
Please direct questions concerning this issue to Don Goodin at (615) 843-7734.
Sincerely,
[, N-i R. H. Shell Manager SON Site Licensing l
Enclosures cc: Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North i
11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711
TENNESSEE VALLEY AUTHORITY SON NIS-1 OWNERS DATA REPORT l
Unit 2
/
Cycle 6
/