TXX-4107, Final Deficiency Rept Re Section Modulus Used in Design of Pipe Supports Using Tube Steel.Initially Reported on 840118. Condition Determined Not Reportable Per 10CFR50.55(e): Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_. | {{#Wiki_filter:_. | ||
TEXAS UTILITIES GENERATING COMPANY MKTWAY TE)WEH | TEXAS UTILITIES GENERATING COMPANY MKTWAY TE)WEH | ||
* 4tHI NOHTII OI.IVE MTHEET, I..H. MI | * 4tHI NOHTII OI.IVE MTHEET, I..H. MI | ||
* IDAI.IAM. TEX AM 732tpl | * IDAI.IAM. TEX AM 732tpl 1/;".^S7....., | ||
February 13, 1984 | |||
.1.. | |||
TXX-4107 Mr. E. H. Johnson, Chief Reactor Project Branch 1 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611'Ryan Plaza Drive, Suite 1000 Docket Nos.: | |||
50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION PIPE SUPPORT DESIGN ERROR QA FILE: | |||
CP-84-06, SDAR-130 FILE: | |||
10110 | |||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On January 18, 1984, we verbally informed your Mr. R. G. Taylor of a discrepancy regarding the section modulus used in the de;ign of pipe supports using tube steel. | On January 18, 1984, we verbally informed your Mr. R. G. Taylor of a discrepancy regarding the section modulus used in the de;ign of pipe supports using tube steel. | ||
We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this determination are available for your inspector's review at the CPSES site. | We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). | ||
Records supporting this determination are available for your inspector's review at the CPSES site. | |||
Very truly yours, f | Very truly yours, f | ||
RJG:In cc: NRC Region IV - (0 + 1 copy) | RJG:In cc: NRC Region IV - (0 + 1 copy) | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U.S. Nuclear Regulatory Commission Washington, DC 20555 8402220171 840213 PDR ADOCK 05000445 s | U.S. Nuclear Regulatory Commission Washington, DC 20555 8402220171 840213 PDR ADOCK 05000445 s | ||
PDR g | |||
i o A D8VENION 09' TEXAN t'TELETIEN ELECTREC COMI%NY}} | |||
Latest revision as of 08:56, 14 December 2024
| ML20080N261 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/13/1984 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-4107, NUDOCS 8402220171 | |
| Download: ML20080N261 (1) | |
Text
_.
TEXAS UTILITIES GENERATING COMPANY MKTWAY TE)WEH
- 4tHI NOHTII OI.IVE MTHEET, I..H. MI
February 13, 1984
.1..
TXX-4107 Mr. E. H. Johnson, Chief Reactor Project Branch 1 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611'Ryan Plaza Drive, Suite 1000 Docket Nos.:
50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION PIPE SUPPORT DESIGN ERROR QA FILE:
CP-84-06, SDAR-130 FILE:
10110
Dear Mr. Johnson:
On January 18, 1984, we verbally informed your Mr. R. G. Taylor of a discrepancy regarding the section modulus used in the de;ign of pipe supports using tube steel.
We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e).
Records supporting this determination are available for your inspector's review at the CPSES site.
Very truly yours, f
RJG:In cc: NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, DC 20555 8402220171 840213 PDR ADOCK 05000445 s
PDR g
i o A D8VENION 09' TEXAN t'TELETIEN ELECTREC COMI%NY