TXX-3592, Final Deficiency Rept Re Pipe Wall Thickness of Reactor Coolant Pressurizer Surge Line.Initially Reported on 821101. Deficiency Not Reportable Per 10CFR50.55(e): Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:9 TEXAS UTILITIES GENERATING COMPANY 21 mil lI14Y \N 11 m t:lt IP \ll.\%.11:\ \*4 77.20t ;N s?d # | {{#Wiki_filter:9 TEXAS UTILITIES GENERATING COMPANY 21 mil lI14Y \\N 11 m t:lt IP \\ll.\\%.11:\\ \\*4 77.20t ;N s?d # | ||
'"b.5$'bb':::' | |||
i November 23, 1982 TXX-3592 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 | i November 23, 1982 TXX-3592 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: | ||
50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION REACTOR C0OLANT PRESSURIZER SURGE LINE FILE N0. | |||
10110 | |||
==Dear Mr. Madsen:== | ==Dear Mr. Madsen:== | ||
On November 1, 1982, we verbally informed your Mr. R. G. Taylor of a discrepancy regarding the pipe wall thickness of the reacter coolant pressurizer surge line. | On November 1, 1982, we verbally informed your Mr. R. G. Taylor of a discrepancy regarding the pipe wall thickness of the reacter coolant pressurizer surge line. | ||
We have completed our investigation and concluded that the matter is not report-able under luCFR50.55(e). Records supporting this determination are available for your inspector's review at the CPSES site. | We have completed our investigation and concluded that the matter is not report-able under luCFR50.55(e). Records supporting this determination are available for your inspector's review at the CPSES site. | ||
Very truly yours, | Very truly yours, | ||
/~ | |||
RJG:aq cc: | R. | ||
. Gary RJG:aq cc: | |||
NRC REGION IV - (0 + 1 copy) | |||
Director, Inspection & Enforcercant (15 copies) | Director, Inspection & Enforcercant (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, DC 20555 O | U. S. Nuclear Regulatory Commission Washington, DC 20555 O | ||
Y 4}} | Y 4}} | ||
Latest revision as of 03:19, 14 December 2024
| ML20085J670 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/23/1982 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, TXX-3592, NUDOCS 8310130278 | |
| Download: ML20085J670 (1) | |
Text
9 TEXAS UTILITIES GENERATING COMPANY 21 mil lI14Y \\N 11 m t:lt IP \\ll.\\%.11:\\ \\*4 77.20t ;N s?d #
'"b.5$'bb':::'
i November 23, 1982 TXX-3592 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:
50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION REACTOR C0OLANT PRESSURIZER SURGE LINE FILE N0.
10110
Dear Mr. Madsen:
On November 1, 1982, we verbally informed your Mr. R. G. Taylor of a discrepancy regarding the pipe wall thickness of the reacter coolant pressurizer surge line.
We have completed our investigation and concluded that the matter is not report-able under luCFR50.55(e). Records supporting this determination are available for your inspector's review at the CPSES site.
Very truly yours,
/~
R.
. Gary RJG:aq cc:
NRC REGION IV - (0 + 1 copy)
Director, Inspection & Enforcercant (15 copies)
U. S. Nuclear Regulatory Commission Washington, DC 20555 O
Y 4