{{#Wiki_filter:PPaL       Pennsylvania Power & Light Company                             :
{{#Wiki_filter:PPaL Pennsylvania Power & Light Company Two North Ninth Street
Two North Ninth Street
* Allentown, PA 18101
* Allentown, PA 18101
* 215/770 5151 U.S. Nuclear Regulatory Camission Document Control Desk Wuhington, DC 20555 SUSQUEEANNA STEAM ELECTRIC STATION SPECI!J., REPORT - FIRE PRCTTECTION ER 100450           FILE 841-23             Docket No. 50-387
* 215/770 5151 U.S. Nuclear Regulatory Camission Document Control Desk Wuhington, DC 20555 SUSQUEEANNA STEAM ELECTRIC STATION SPECI!J., REPORT - FIRE PRCTTECTION ER 100450 FILE 841-23 Docket No.
_ PIA-2132                                   License No. NPF-14
50-387
    'Ihis special report is being submitted to document the condition whereby a carbon dioxide fire extirguishing systs and a related fire barrier damper were inoperable longer than the time allowed by Technical Spec-ification action statements 3.7.6.3.a and 3.7.7.a, respectively.
_ PIA-2132 License No. NPF-14
'Ihis special report is being submitted to document the condition whereby a carbon dioxide fire extirguishing systs and a related fire barrier damper were inoperable longer than the time allowed by Technical Spec-ification action statements 3.7.6.3.a and 3.7.7.a, respectively.
Following surveillance testing of the automatic carbon dioxide fire extinguishirq system for the lower relay rocm, the 002 operated fire damper on the ventilation cupply duct to the rom could not be reset due to a lack of adequate access to the damper. In order to restore supply ventilation to the lower relay rom to protect the electronic -
Following surveillance testing of the automatic carbon dioxide fire extinguishirq system for the lower relay rocm, the 002 operated fire damper on the ventilation cupply duct to the rom could not be reset due to a lack of adequate access to the damper. In order to restore supply ventilation to the lower relay rom to protect the electronic -
equipment frm overheating, the damper was physically blocked open.
equipment frm overheating, the damper was physically blocked open.
As a result of the damper being blocked open the carbon dioxide fire extinguishing system was considered ineffective and was isolated to prevent CO2 from entering the ventilation system. 'Ike limiting con-ditions for operation were invoked and a continuous fire watch with backup fire suppression equipnent was assigned to the area.
As a result of the damper being blocked open the carbon dioxide fire extinguishing system was considered ineffective and was isolated to prevent CO2 from entering the ventilation system. 'Ike limiting con-ditions for operation were invoked and a continuous fire watch with backup fire suppression equipnent was assigned to the area.
A plant nodification was performed to install an access hatch in the ductwork which would be sufficiently sized and located to allow the damper to be reset. 'Ihe damper was reset and the carbon dioxide system was retested to ensure correct operation. 'Ihe fire damper and carbon dioxide fire extinguishing system were declared operable on February 21, 1984, and the limiting conditions for operation cleared.
A plant nodification was performed to install an access hatch in the ductwork which would be sufficiently sized and located to allow the damper to be reset. 'Ihe damper was reset and the carbon dioxide system was retested to ensure correct operation. 'Ihe fire damper and carbon dioxide fire extinguishing system were declared operable on February 21, 1984, and the limiting conditions for operation cleared.
    $ $ ~7 " /~~
$ $ ~7 " /~~
II.W. Keiser Superintendent of Plant-Susquehanna TPB/pjg cc: Dr. 'Ihcmas E. Murley                           Mr. R.H. Jacobs Regiona'. Administrator, Region I             Senior Resident Inspector U.S. Nuclear Regulatory Cmmission             U.S. Nuclear Regulatory Ca mission 631 Park Avenue                               P.O. Bax 52 King of Prussia, PA 19406                     Shickshinny, PA 18655 8
II.W. Keiser Superintendent of Plant-Susquehanna TPB/pjg cc: Dr. 'Ihcmas E. Murley Mr. R.H. Jacobs Regiona'. Administrator, Region I Senior Resident Inspector U.S. Nuclear Regulatory Cmmission U.S. Nuclear Regulatory Ca mission 631 Park Avenue P.O. Bax 52 King of Prussia, PA 19406 Shickshinny, PA 18655 8
    =
= 28&o*482
8 28&o*482       PDR.
'/s 8
                                                                                              '/s}}
PDR.
*}}

Latest revision as of 23:11, 13 December 2024

Special Rept:Fire Barrier Damper Inoperable Longer than Tech Spec Limits.Caused by Damper Being Physically Blocked Open. Mod Performed to Install Access Hatch in Ductwork.Damper Reset
ML20087E495
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 03/12/1984
From: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
PLA-2132, NUDOCS 8403160199
Download: ML20087E495 (1)


Text

PPaL Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215/770 5151 U.S. Nuclear Regulatory Camission Document Control Desk Wuhington, DC 20555 SUSQUEEANNA STEAM ELECTRIC STATION SPECI!J., REPORT - FIRE PRCTTECTION ER 100450 FILE 841-23 Docket No.

50-387

_ PIA-2132 License No. NPF-14

'Ihis special report is being submitted to document the condition whereby a carbon dioxide fire extirguishing systs and a related fire barrier damper were inoperable longer than the time allowed by Technical Spec-ification action statements 3.7.6.3.a and 3.7.7.a, respectively.

Following surveillance testing of the automatic carbon dioxide fire extinguishirq system for the lower relay rocm, the 002 operated fire damper on the ventilation cupply duct to the rom could not be reset due to a lack of adequate access to the damper. In order to restore supply ventilation to the lower relay rom to protect the electronic -

equipment frm overheating, the damper was physically blocked open.

As a result of the damper being blocked open the carbon dioxide fire extinguishing system was considered ineffective and was isolated to prevent CO2 from entering the ventilation system. 'Ike limiting con-ditions for operation were invoked and a continuous fire watch with backup fire suppression equipnent was assigned to the area.

A plant nodification was performed to install an access hatch in the ductwork which would be sufficiently sized and located to allow the damper to be reset. 'Ihe damper was reset and the carbon dioxide system was retested to ensure correct operation. 'Ihe fire damper and carbon dioxide fire extinguishing system were declared operable on February 21, 1984, and the limiting conditions for operation cleared.

$ $ ~7 " /~~

II.W. Keiser Superintendent of Plant-Susquehanna TPB/pjg cc: Dr. 'Ihcmas E. Murley Mr. R.H. Jacobs Regiona'. Administrator, Region I Senior Resident Inspector U.S. Nuclear Regulatory Cmmission U.S. Nuclear Regulatory Ca mission 631 Park Avenue P.O. Bax 52 King of Prussia, PA 19406 Shickshinny, PA 18655 8