ML20087F172: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
9
9 4
* 4 WELF CREEK
WELF CREEK
  ~
~
NUCLEAR OPERATING CORPORATION Otto L. Maynard Wce President Plant Orerations August 10, 1995 WO 95-0124 U. S. Nuclear Regulator,' Commission ATIN: Document Control Desk Mail Station P1-137 Washington, D. C.                 20555
NUCLEAR OPERATING CORPORATION Otto L. Maynard Wce President Plant Orerations August 10, 1995 WO 95-0124 U.
S. Nuclear Regulator,' Commission ATIN: Document Control Desk Mail Station P1-137 Washington, D.
C.
20555


==Subject:==
==Subject:==
Docket No. 50-482:                     July, 1995, Monthly Operating Report Gentlernen :
Docket No. 50-482:
Attached is the July, 1995, Monthly Operating Report for Wolf Creek Generating Station.                   This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.
July, 1995, Monthly Operating Report Gentlernen :
Very truly yours, b
Attached is the July,
W            I 47Y Otto L. Maynard OLM/jad Attachment cc:       L. J. Callan (NRC), w/a D. F. Kirsch (NRC), w/a J. F. Ringwald (NRC), w/a J. C. Stone (NRC), w/a 9508150172 955731 PDR       ADOCK 05000482 R                               PDR                                                                       ,
: 1995, Monthly Operating Report for Wolf Creek Generating Station.
P.O Box 411/ Burlington. KS 66839 / Phone: (316) 3644831 An Equal Opportunity Employer M f /HC,VE1 p! 4j
This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.
                                                                                                              ,/
Very truly yours, bW I 47Y Otto L. Maynard OLM/jad Attachment cc:
L.
J.
Callan (NRC), w/a D.
F.
Kirsch (NRC), w/a J.
F.
Ringwald (NRC), w/a J.
C.
Stone (NRC), w/a 9508150172 955731 PDR ADOCK 05000482 R
PDR P.O Box 411/ Burlington. KS 66839 / Phone: (316) 3644831 p! 4j An Equal Opportunity Employer M f /HC,VE1
,/
G
G


h ,'
h,'
F:   ,
F:
i
i
          ;h '.
;h '.
s     ..
s Attachment to WO 95-0124 1
Attachment to WO 95-0124 1
I I
* I I
WOLF CREEK NUCLEAR OPERATING CORPORAT10N l -
WOLF CREEK NUCLEAR OPERATING CORPORAT10N l-WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT YEAR:                                     1995 MONTH:                                            July Docket No.:                                           50-482 Facility Operating License No.:                                                                                                                 NPF-42 Report No.                                         125 rr               - --
WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT MONTH:
                                      .__________________________._______..______._...________m_                                                                                                           _ _ _ . . _ . . _ _ _ . . . _
July YEAR:
1995 Docket No.:
50-482 Facility Operating License No.:
NPF-42 Report No.
125 rr
.__________________________._______..______._...________m_


  , ' Attdchrient to WO 95-0124
, ' Attdchrient to WO 95-0124


==SUMMARY==
==SUMMARY==
 
The following report highlights the operating experience of Wolf Creek Generating Station for the month of July, 1995.
The following report highlights the operating experience of Wolf Creek Generating Station for the month of July, 1995.       This report is being provided pursuant to Technical Specification 6,9.1.B.
This report is being provided pursuant to Technical Specification 6,9.1.B.
I.  
I.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE The unit operated at or near 100 % power, Mode     1, from July 1, 1995, through July 31, 1995.
OF OPERATING EXPERIENCE The unit operated at or near 100 % power, Mode 1,
II,   !%IOR SAFETY RELATED MAINTENANCE ACTIVITIES NONE Wolf Creek Generating Station Monthly Operating Report July, 1995 Page 1 of 5
from July 1,
1995, through July 31, 1995.
II,
!%IOR SAFETY RELATED MAINTENANCE ACTIVITIES NONE Wolf Creek Generating Station Monthly Operating Report July, 1995 Page 1 of 5


i i
JAttdchm:nt to WO 95-0124 OPERATING DATA REPORT DOCKET NO. 50-492 l
WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 8-8-95 TELEPHONE 316-334-9831 l
OPERATING STATUS 1.
Reporting Period:
July, 1995 Gross Hours in Reporting Period:
744 1
-2.
Currently Authorized Power Level (MWt):
3565 Max. Depend. Capacity (MWe-Net): 1167 Design Electrical Rating (MWe-Net) :
1170 3.
Power Level to Which Restricted (If Any) (MWe-Net) -
N/A 4.
Reasons for Restriction (If Any) : N/A p
This Month Yr. to Date Cumulative 5.
Number of Hours Reactor was Critical 744 4,975.7 70,943.8 6.
Reactor Reserve Shutdown Hours 0.0 0.0 339.8 1
7.
Hours Generator on Line 744 4,952.1 70,106.7 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross Thermal Energy Generated (MWh) 2,632,369 l'/,379,165 232,411,484 10.
Gross Electrical Energy Generated (MWh) 902,385 6,017,892 80,782,107 11.
Net Electrical Energy Generated (MWh) 865,135 5,767,088 77,141,762 12.
Reactor Service Factor 100.0%
'97.8%
81.7%
1 13.
Reactor Availability Factor 100.0%
91.8%
82.1%
14.
Unit Service Factor 100.0%
97.3%
80.7%
i
i
    .                                                                                                        i JAttdchm:nt to WO 95-0124                                                                            l OPERATING DATA REPORT    l DOCKET NO. 50-492 l
-15.
* WOLF CREEK GENERATING STATION
Unit Availability Factor 100.0%
                      ,                                      WOLF CREEK NUCLEAR OPERATING CORPORATION    '
97.3%
DATE 8-8-95 TELEPHONE 316-334-9831    l OPERATING STATUS 1
80.7%
: 1. Reporting Period:  July, 1995            Gross Hours in Reporting Period:            744      l 1
16.
        -2. Currently Authorized Power Level (MWt):    3565  Max. Depend. Capacity (MWe-Net): 1167 Design Electrical Rating (MWe-Net) :    1170
Unit Capacity Factor (Using MDC) 99.6%
: 3. Power Level to Which Restricted (If Any) (MWe-Net) - . N/A
97.6%
: 4. Reasons for Restriction (If Any) : N/A p                                                      This Month      Yr. to Date      Cumulative
78.3%
: 5. Number of Hours Reactor was Critical        744              4,975.7          70,943.8
17.
: 6. Reactor Reserve Shutdown Hours              0.0              0.0              339.8 1
Unit Capacity Factor (Using Design MWe) 99.4%
: 7. Hours Generator on Line                    744              4,952.1          70,106.7
96.9%
: 8. Unit Reserve Shutdown Hours                0.0              0.0              0.0
75.9%
: 9. Gross Thermal Energy Generated (MWh)        2,632,369        l'/,379,165      232,411,484
18, Unit Forced Outage Rate 0.0%
: 10. Gross Electrical Energy Generated (MWh)    902,385          6,017,892        80,782,107
2.7%
: 11. Net Electrical Energy Generated (MWh)      865,135          5,767,088        77,141,762
5.0%
: 12. Reactor Service Factor                      100.0%          '97.8%            81.7%            1
19.
: 13. Reactor Availability Factor                 100.0%          91.8%            82.1%
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):
: 14. Unit Service Factor                        100.0%          97.3%           80.7%            i
        -15. Unit Availability Factor                    100.0%          97.3%            80.7%
: 16. Unit Capacity Factor (Using MDC)           99.6%           97.6%           78.3%
: 17. Unit Capacity Factor (Using Design MWe)     99.4%           96.9%           75.9%
18, Unit Forced Outage Rate                     0.0%             2.7%             5.0%
: 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):
No outages are scheduled at this time.
No outages are scheduled at this time.
: 20. If Shut Down at End of Report Period, Estimate Date of Startup:         N/A 1
20.
If Shut Down at End of Report Period, Estimate Date of Startup:
N/A 1
Wolf Creek Generating Station Monthly Operating Report July, 1995 Page 2 of 5
Wolf Creek Generating Station Monthly Operating Report July, 1995 Page 2 of 5


,                                                                                              i Attdchment to WO'95-0124                                                                   l AVERAGE DAILY UNIT POWER LEVEL   I DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION     l DATE 8-8-95 TELEPHONE 316-364-8831'   l MONTH       July, 1995                                                                   !
i Attdchment to WO'95-0124 AVERAGE DAILY UNIT POWER LEVEL I
i DAY AVERAGE DAILY POWER LEVEL             DAY AVERAGE DAILY POWER LEVEL           ,
DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION l
(MWe-Net)                                 (MWe-Net) 1               1174                 17                   1163 2               1175                 18                   1162 3               1175                 19                   1162 4               1174                 20                   1164 5               1174                 21                   1158 I
DATE 8-8-95 TELEPHONE 316-364-8831' MONTH July, 1995 i
6                1167                 22                   1157 7               1161                 23                   1162 8               1168                 24                   1163 i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
9               1167                 25                   1165 10                 1165                 26                   1165-11                 1165           ,
(MWe-Net) 1 1174 17 1163 2
27                   1165 12                 1163                 28                   1161 13                 1160                 29                   1158                         l 1
1175 18 1162 3
14                 1159                 30                   1138 15                 1133                 31                   1161 l
1175 19 1162 4
16                 1161                                                                 j l
1174 20 1164 5
1 l
1174 21 1158 6
l Wolf Creek Generating Station Monthly Operating Report July, 1995 l
1167 22 1157 7
Page 3 of 5
1161 23 1162 8
1168 24 1163 i
9 1167 25 1165 10 1165 26 1165-11 1165 27 1165 12 1163 28 1161 13 1160 29 1158 1
14 1159 30 1138 15 1133 31 1161 16 1161 j
1 Wolf Creek Generating Station Monthly Operating Report July, 1995 Page 3 of 5


                                                                                                                                                                .          + ..
+..
Attschment to WO.95-0124                                                                                                                                         .
Attschment to WO.95-0124 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE B-8-95 TELEPHONE 316-364-8931 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (Hours)
UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE B-8-95 TELEPHONE 316-364-8931 Type                                                                 METHOD OF SHUTTING F: FORCED     DURATION   REASON                                                   DOWN THE REACTOR   CORRECTIVE ACTIONS / COMMENTS No     Date     S: SCHEDULED   (Hours)     (1)                                 OR REDUCING POWER (2)
(1)
N/A       N/A           N/A         N/A       N/A                                                           N/A                       N/A
OR REDUCING POWER (2)
N/A N/A N/A N/A N/A N/A N/A


==SUMMARY==
==SUMMARY==
The unit operated at or near 100 % power, Mode 1, from July 1, 1995, through July 31, 1995
The unit operated at or near 100 % power, Mode 1, from July 1, 1995, through July 31, 1995 1)
: 1)   REASON- A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:                                           1. MANUAL B: MAINTENANCE OR TEST           F: ADMINISTRATIVE                                                                                 2. MANUAL SCRAM C: REFUELING                     G: OPERATIONAL ERROR (EXPLAIN)                                                                     3. AU10MATIC SCRAM D: REGULATORY RESTRICTION       H: OTHER (EXPLAIN)                                                                                 4. CONTINUED
REASON-A: EQUIPMENT FAILURE (EXPLAIN)
: 5. REDUCED LOAD
E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
: 9. OTHER Wolf Creek Generating Station Mcnthly Operating Report July, 1995 Page 4 of 5
: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.
MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN)
: 3. AU10MATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.
CONTINUED 5.
REDUCED LOAD
: 9. OTHER i
Wolf Creek Generating Station Mcnthly Operating Report July, 1995 Page 4 of 5


I
I Atthchrhent.to WO 95-0124 1*
          - *Atthchrhent.to WO 95-0124 1*                                                                                                 ;
WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH July, 1995
WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1                                       ,
MONTH     July, 1995


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for .this       ;
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for.this month which required load reduction or resulted in significant non-load related incidents.
month which required load reduction or resulted in significant non-load related incidents.
DATE TIME EVENT N/A N/A N/A i
DATE                     TIME             EVENT i
t t
N/A                     N/A             N/A t
a W
t a
i Wolf Creek Generating Station Monthly Operating Report July, 1995 Page 5 of 5
W i
]}}
Wolf Creek Generating Station   I Monthly Operating Report       l July, 1995                     l Page 5 of 5
                                                                                                          ]}}

Latest revision as of 14:28, 13 December 2024

Monthly Operating Rept for Jul 1995 for Wolf Creek Generating Station
ML20087F172
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/31/1995
From: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-95-0124, WO-95-124, NUDOCS 9508150172
Download: ML20087F172 (7)


Text

.

9 4

WELF CREEK

~

NUCLEAR OPERATING CORPORATION Otto L. Maynard Wce President Plant Orerations August 10, 1995 WO 95-0124 U.

S. Nuclear Regulator,' Commission ATIN: Document Control Desk Mail Station P1-137 Washington, D.

C.

20555

Subject:

Docket No. 50-482:

July, 1995, Monthly Operating Report Gentlernen :

Attached is the July,

1995, Monthly Operating Report for Wolf Creek Generating Station.

This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours, bW I 47Y Otto L. Maynard OLM/jad Attachment cc:

L.

J.

Callan (NRC), w/a D.

F.

Kirsch (NRC), w/a J.

F.

Ringwald (NRC), w/a J.

C.

Stone (NRC), w/a 9508150172 955731 PDR ADOCK 05000482 R

PDR P.O Box 411/ Burlington. KS 66839 / Phone: (316) 3644831 p! 4j An Equal Opportunity Employer M f /HC,VE1

,/

G

h,'

F:

i

h '.

s Attachment to WO 95-0124 1

I I

WOLF CREEK NUCLEAR OPERATING CORPORAT10N l -

WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT MONTH:

July YEAR:

1995 Docket No.:

50-482 Facility Operating License No.:

NPF-42 Report No.

125 rr

.__________________________._______..______._...________m_

, ' Attdchrient to WO 95-0124

SUMMARY

The following report highlights the operating experience of Wolf Creek Generating Station for the month of July, 1995.

This report is being provided pursuant to Technical Specification 6,9.1.B.

I.

SUMMARY

OF OPERATING EXPERIENCE The unit operated at or near 100 % power, Mode 1,

from July 1,

1995, through July 31, 1995.

II,

!%IOR SAFETY RELATED MAINTENANCE ACTIVITIES NONE Wolf Creek Generating Station Monthly Operating Report July, 1995 Page 1 of 5

i i

JAttdchm:nt to WO 95-0124 OPERATING DATA REPORT DOCKET NO. 50-492 l

WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 8-8-95 TELEPHONE 316-334-9831 l

OPERATING STATUS 1.

Reporting Period:

July, 1995 Gross Hours in Reporting Period:

744 1

-2.

Currently Authorized Power Level (MWt):

3565 Max. Depend. Capacity (MWe-Net): 1167 Design Electrical Rating (MWe-Net) :

1170 3.

Power Level to Which Restricted (If Any) (MWe-Net) -

N/A 4.

Reasons for Restriction (If Any) : N/A p

This Month Yr. to Date Cumulative 5.

Number of Hours Reactor was Critical 744 4,975.7 70,943.8 6.

Reactor Reserve Shutdown Hours 0.0 0.0 339.8 1

7.

Hours Generator on Line 744 4,952.1 70,106.7 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.

Gross Thermal Energy Generated (MWh) 2,632,369 l'/,379,165 232,411,484 10.

Gross Electrical Energy Generated (MWh) 902,385 6,017,892 80,782,107 11.

Net Electrical Energy Generated (MWh) 865,135 5,767,088 77,141,762 12.

Reactor Service Factor 100.0%

'97.8%

81.7%

1 13.

Reactor Availability Factor 100.0%

91.8%

82.1%

14.

Unit Service Factor 100.0%

97.3%

80.7%

i

-15.

Unit Availability Factor 100.0%

97.3%

80.7%

16.

Unit Capacity Factor (Using MDC) 99.6%

97.6%

78.3%

17.

Unit Capacity Factor (Using Design MWe) 99.4%

96.9%

75.9%

18, Unit Forced Outage Rate 0.0%

2.7%

5.0%

19.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):

No outages are scheduled at this time.

20.

If Shut Down at End of Report Period, Estimate Date of Startup:

N/A 1

Wolf Creek Generating Station Monthly Operating Report July, 1995 Page 2 of 5

i Attdchment to WO'95-0124 AVERAGE DAILY UNIT POWER LEVEL I

DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION l

DATE 8-8-95 TELEPHONE 316-364-8831' MONTH July, 1995 i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1174 17 1163 2

1175 18 1162 3

1175 19 1162 4

1174 20 1164 5

1174 21 1158 6

1167 22 1157 7

1161 23 1162 8

1168 24 1163 i

9 1167 25 1165 10 1165 26 1165-11 1165 27 1165 12 1163 28 1161 13 1160 29 1158 1

14 1159 30 1138 15 1133 31 1161 16 1161 j

1 Wolf Creek Generating Station Monthly Operating Report July, 1995 Page 3 of 5

+..

Attschment to WO.95-0124 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE B-8-95 TELEPHONE 316-364-8931 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (Hours)

(1)

OR REDUCING POWER (2)

N/A N/A N/A N/A N/A N/A N/A

SUMMARY

The unit operated at or near 100 % power, Mode 1, from July 1, 1995, through July 31, 1995 1)

REASON-A: EQUIPMENT FAILURE (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.

MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN)

3. AU10MATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.

CONTINUED 5.

REDUCED LOAD

9. OTHER i

Wolf Creek Generating Station Mcnthly Operating Report July, 1995 Page 4 of 5

I Atthchrhent.to WO 95-0124 1*

WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH July, 1995

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for.this month which required load reduction or resulted in significant non-load related incidents.

DATE TIME EVENT N/A N/A N/A i

t t

a W

i Wolf Creek Generating Station Monthly Operating Report July, 1995 Page 5 of 5

]