TXX-4213, Interim Significant Deficiency Rept SDAR-137 Re Inconsistency in Draft Tech Spec & FSAR Accident Analysis. Initially Reported on 840604.Based on Investigation,Matter Not Reportable Per 10CFR50.55(e): Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:6 TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWEN . 800 NORTH OLIVE MTHEET. L.B. M1
{{#Wiki_filter:6 TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWEN. 800 NORTH OLIVE MTHEET. L.B. M1
* DALLAM TExAM T3201 w,cs se o = huc anoes af.ons
* DALLAM TExAM T3201 w,cs se o = huc anoes af.ons
                                                                                          }g n-O   JUL -31984 Mr. E.H. Johnson, Chief
}g n-O JUL -31984
{p          _
{p Mr. E.H. Johnson, Chief Reactor Project Branch 1 U.S. Nuclear Regulatory Conunission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:
Reactor Project Branch 1 U.S. Nuclear Regulatory Conunission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000                                       Docket Nos.:     50-445 Arlington, TX 76012                                                                     50-446 COMANCHE PEAK STEAM ELECTRIC STATION FSAR AND TECHNICAL SPECIFICATION CONSISTENCY QA FILE: CP-84-13, SDAR-137 FILE NO.: 10110
50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION FSAR AND TECHNICAL SPECIFICATION CONSISTENCY QA FILE: CP-84-13, SDAR-137 FILE NO.:
10110


==Dear Mr. Johnson,==
==Dear Mr. Johnson,==
On June 4,1984 we verbally contacted your Mr. D. Hunnicutt of a deficiency regarding an inconsistency in the draft Technical Specification and the FSAR accident analysis.
On June 4,1984 we verbally contacted your Mr. D. Hunnicutt of a deficiency regarding an inconsistency in the draft Technical Specification and the FSAR accident analysis.
We have canpleted our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this detennination are available for your inspector's review at the CPSES site.
We have canpleted our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this detennination are available for your inspector's review at the CPSES site.
Very truly yours,
Very truly yours, hay
                                                                                        ~
~
hay BRC/tig cc: NRC Region IV - (0 + 1 copy)
BRC/tig cc: NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, DC 20555 6407090200 840702                   '
U.S. Nuclear Regulatory Commission Washington, DC 20555 6407090200 840702
  -PDR ADOCK 05000445 S                                                                                                  (     M PDR 4 oritarou or raxAn errr.rrres rr.mcTure courAur               M[/Q/      .}}
-PDR ADOCK 05000445
(
M S
PDR M[/Q/
4 oritarou or raxAn errr.rrres rr.mcTure courAur
.}}

Latest revision as of 10:49, 13 December 2024

Interim Significant Deficiency Rept SDAR-137 Re Inconsistency in Draft Tech Spec & FSAR Accident Analysis. Initially Reported on 840604.Based on Investigation,Matter Not Reportable Per 10CFR50.55(e)
ML20092P640
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/02/1984
From: Clements B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-137, TXX-4213, NUDOCS 8407090200
Download: ML20092P640 (1)


Text

6 TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWEN. 800 NORTH OLIVE MTHEET. L.B. M1

  • DALLAM TExAM T3201 w,cs se o = huc anoes af.ons

}g n-O JUL -31984

{p Mr. E.H. Johnson, Chief Reactor Project Branch 1 U.S. Nuclear Regulatory Conunission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:

50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION FSAR AND TECHNICAL SPECIFICATION CONSISTENCY QA FILE: CP-84-13, SDAR-137 FILE NO.:

10110

Dear Mr. Johnson,

On June 4,1984 we verbally contacted your Mr. D. Hunnicutt of a deficiency regarding an inconsistency in the draft Technical Specification and the FSAR accident analysis.

We have canpleted our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this detennination are available for your inspector's review at the CPSES site.

Very truly yours, hay

~

BRC/tig cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, DC 20555 6407090200 840702

-PDR ADOCK 05000445

(

M S

PDR M[/Q/

4 oritarou or raxAn errr.rrres rr.mcTure courAur

.