TXX-4212, Interim Significant Deficiency Rept SDAR-136 Re Temp Envelope Requirements on Environ Qualifications of Equipment Outside Containment for High Energy Line Breaks.Initially Reported on 840604.Next Rept by 840831: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:l TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWER . 400 NORTH ULIVE MTHEET. L.H. M1. DALLAN TEXAM 75201 | {{#Wiki_filter:l TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWER. 400 NORTH ULIVE MTHEET. L.H. M1. DALLAN TEXAM 75201 | ||
".2;';I "'.E'".'".LL. | |||
July 2, | |||
Reactor Project Branch 1 | .284 | ||
U.S. Nuclear Regulatory Comission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 | ,,o g@@Nk TXX-421 N | ||
JUL -3994 1 | |||
ici Mr. E.H. Johnson, Chief 1 UL-Reactor Project Branch 1 1 | |||
~ | |||
U.S. Nuclear Regulatory Comission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: | |||
50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION IMPACT OF HELB TEMPERATURES ON QUALIFIED EQUIPMENT OUTSIDE CONTAltNENT QA FILE: CP-84-12, SDAR-136 FILE N0.: | |||
10110 | |||
==Dear Mr. Johnson,== | ==Dear Mr. Johnson,== | ||
On June 4,1984 we verbally contacted your Mr. D. Hunnicutt of a deficiency regarding the temperature envelope requirements on the environmental ualification of equipment outside containment for high energy line breaks HELB). | On June 4,1984 we verbally contacted your Mr. D. Hunnicutt of a deficiency regarding the temperature envelope requirements on the environmental ualification of equipment outside containment for high energy line breaks HELB). | ||
We are continuing our evaluation and anticipate completion by August 31, 1984. | We are continuing our evaluation and anticipate completion by August 31, 1984. | ||
Very truly yours, BRC/tig cc: fRC Region IV - (0 + 1 copy) | Very truly yours, BRC/tig cc: fRC Region IV - (0 + 1 copy) | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U.S. Nuclear Regulatory Commission Washington, DC 20555 8407090255 840702 | U.S. Nuclear Regulatory Commission Washington, DC 20555 8407090255 840702 | ||
{DRADOCK 05000445 | {DRADOCK 05000445 PDR Y'l l | ||
oj0 | |||
,n., n, -,..,,L,,.,, ~,c cn,,,.,,}} | |||
Latest revision as of 10:48, 13 December 2024
| ML20092P684 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/02/1984 |
| From: | Clements B TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| SDAR-136, TXX-4212, NUDOCS 8407090255 | |
| Download: ML20092P684 (1) | |
Text
l TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWER. 400 NORTH ULIVE MTHEET. L.H. M1. DALLAN TEXAM 75201
".2;';I "'.E'".'".LL.
July 2,
.284
,,o g@@Nk TXX-421 N
JUL -3994 1
ici Mr. E.H. Johnson, Chief 1 UL-Reactor Project Branch 1 1
~
U.S. Nuclear Regulatory Comission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:
50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION IMPACT OF HELB TEMPERATURES ON QUALIFIED EQUIPMENT OUTSIDE CONTAltNENT QA FILE: CP-84-12, SDAR-136 FILE N0.:
10110
Dear Mr. Johnson,
On June 4,1984 we verbally contacted your Mr. D. Hunnicutt of a deficiency regarding the temperature envelope requirements on the environmental ualification of equipment outside containment for high energy line breaks HELB).
We are continuing our evaluation and anticipate completion by August 31, 1984.
Very truly yours, BRC/tig cc: fRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, DC 20555 8407090255 840702
{DRADOCK 05000445 PDR Y'l l
oj0
,n., n, -,..,,L,,.,, ~,c cn,,,.,,