ML20097C700: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:r I
{{#Wiki_filter:r
  'Af Telephone (412) 393-6000 Nuclear Division P.O.Bor4 Shippingport, PA 15077-0004 September 5, 1984 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555
'Af Telephone (412) 393-6000 Nuclear Division P.O.Bor4 Shippingport, PA 15077-0004 September 5, 1984 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555


==Reference:==
==Reference:==
Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 105 Gentlemen:
Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 105 Gentlemen:
Enclosed are:
Enclosed are:
: 1.       Three (3) originair and thirty-seven (37) copies of an Application for Amendment to our Operating License No. DPR-66. Fire Detection Instrumentation specification 3.3.3.6 Action statement a and Surveillance Requirement 4.3.3.6.1 have been revised to reflect the Standard Technical Specification requirements. Action statement b has been revised in accordance with the NRC staff recommendations to reflect the revised reporting requirements specified by Generic Letter 83-43.
1.
: 2.       Forty (40) copies of documents designated Attachments A and B which set forth the change in Technical Specifications and its safety evaluation.
Three (3) originair and thirty-seven (37) copies of an Application for Amendment to our Operating License No. DPR-66.
Fire Detection Instrumentation specification 3.3.3.6 Action statement a and Surveillance Requirement 4.3.3.6.1 have been revised to reflect the Standard Technical Specification requirements. Action statement b has been revised in accordance with the NRC staff recommendations to reflect the revised reporting requirements specified by Generic Letter 83-43.
2.
Forty (40) copies of documents designated Attachments A and B which set forth the change in Technical Specifications and its safety evaluation.
A license amendment application fee of $150.00 will be submitted under separate cover in accordance with 10 CFR 170.
A license amendment application fee of $150.00 will be submitted under separate cover in accordance with 10 CFR 170.
Very ru y yours, J. . Carey Vice President, Nuclear gcP h
Very ru y yours, J.
8409170216 840905 PDR ADOCK 05000334 P                         PDR}}
. Carey Vice President, Nuclear gcP h
8409170216 840905 PDR ADOCK 05000334 P
PDR}}

Latest revision as of 07:38, 13 December 2024

Forwards Application for Amend to License DPR-66,changing Tech Specs to Revise Fire Detection Instrumentation Spec 3.3.3.6 Action Statements a & B,To Reflect STS & Generic Ltr 83-43 Requirements,Respectively
ML20097C700
Person / Time
Site: Beaver Valley
Issue date: 09/05/1984
From: Carey J
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20097C701 List:
References
GL-83-43, NUDOCS 8409170216
Download: ML20097C700 (1)


Text

r

'Af Telephone (412) 393-6000 Nuclear Division P.O.Bor4 Shippingport, PA 15077-0004 September 5, 1984 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 105 Gentlemen:

Enclosed are:

1.

Three (3) originair and thirty-seven (37) copies of an Application for Amendment to our Operating License No. DPR-66.

Fire Detection Instrumentation specification 3.3.3.6 Action statement a and Surveillance Requirement 4.3.3.6.1 have been revised to reflect the Standard Technical Specification requirements. Action statement b has been revised in accordance with the NRC staff recommendations to reflect the revised reporting requirements specified by Generic Letter 83-43.

2.

Forty (40) copies of documents designated Attachments A and B which set forth the change in Technical Specifications and its safety evaluation.

A license amendment application fee of $150.00 will be submitted under separate cover in accordance with 10 CFR 170.

Very ru y yours, J.

. Carey Vice President, Nuclear gcP h

8409170216 840905 PDR ADOCK 05000334 P

PDR