ML20098D668: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:.              . . _      . - . .
{{#Wiki_filter:.
                                                                  .    - . - _ _      . _ . _ - . - ~ . . . . ~ . . - - _ -               - _ - - .
_. _ -. - ~.... ~.. - - _ -
  ,.4-'
,.4-'
e A
e A
                                                  ,e     -
,e y
y               ,
Jac t p w
Jac t p w
                              .n         m May 26, 1992 TVA-SQN-TS-92-05 U.S. Nuclear Regulatory Commission ATTN         Document Control Desk Washington,-D.C. 20555 Gentiement
.n m
                        .In the Matter of                                                     )                               Docket Nos. 50-327
May 26, 1992 TVA-SQN-TS-92-05 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington,-D.C. 20555 Gentiement
                        .Tennet.see Valley Authority                                           )                                               50-328 SEQUOYAll NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 92-05,
.In the Matter of
                          " REVISION OF TS BASES FOR FIRE WATCH" Enclosed is a requested amendment to the TS bases of SQN Units 1 and 2.
)
Docket Nos. 50-327
.Tennet.see Valley Authority
)
50-328 SEQUOYAll NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 92-05,
" REVISION OF TS BASES FOR FIRE WATCH" Enclosed is a requested amendment to the TS bases of SQN Units 1 and 2.
The proposad change revises TS Bases 3/4.3.3.8, " Fire Detection Instrumentation," 3/4.7.11. " Fire Suppression Systems," and 3/4.7.12,
The proposad change revises TS Bases 3/4.3.3.8, " Fire Detection Instrumentation," 3/4.7.11. " Fire Suppression Systems," and 3/4.7.12,
                          " Fire Barrier Penetrations."
" Fire Barrier Penetrations."
The proposed TS bases change is identified in Enclosure 1. The
The proposed TS bases change is identified in Enclosure 1.
!                          justification for the proposed TS change is provided-in Enclosure 2.
The justification for the proposed TS change is provided-in Enclosure 2.
Please direct questions concerning this issue to J. D. Smith at (615) 843-6672.
Please direct questions concerning this issue to J. D. Smith at (615) 843-6672.
Sincerely,
Sincerely,
                      '[                               r J. L. Wilson
'[
!                      ' Sworn t             d subsc ibe before me 1:                        th
r J. L. Wilson
                                      -+  ' day                     >L > ' 1 92 otary Publio7 -
' Sworn t d subsc ibe before me
                                            ))       't                       h __
' day
                                                            /- ~ M               ~
>L > ' 1 92 1:
My Commission Expires Enclosures cc: See page 2 4
th
9205290234 920526 PDR=' ADOCK 05000327                                                                                                         n/] gg/      .
-+
P                              PDR ll7 -
h __
))
't otary Publio -
/- ~ M 7
~
My Commission Expires Enclosures cc:
See page 2 n gg/
/]
9205290234 920526
.4 PDR=' ADOCK 05000327 P
PDR ll7


4 U.S. Nuclear Regulatory Commission Page 2 May 26, 1992 Enclosures cc (Enclosures):
4 U.S. Nuclear Regulatory Commission Page 2 May 26, 1992 Enclosures cc (Enclosures):
Mr. D E. Labarge                                                   tct Manager U.S. Nuclear Regu                                                   Commission One White Flint, h 11555 Rockville Pike Rockville, Msryland 20852 Mr. Michael P. Mobley, Director (w/o Enclosures)
Mr. D E. Labarge tct Manager U.S. Nuclear Regu Commission One White Flint, h 11555 Rockville Pike Rockville, Msryland 20852 Mr. Michael P. Mobley, Director (w/o Enclosures)
Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue, N Nashville, Tennessee 37203 NRC Resider.; Inspector Segaoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 Mr. B. ii. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue, N Nashville, Tennessee 37203 NRC Resider.; Inspector Segaoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 Mr. B. ii. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
                                                                                                -}}
-}}

Latest revision as of 07:03, 13 December 2024

TS Change 92-05 to Licenses DPR-77 & DPR-79,revising TS Bases 3/4.3.3.8, Fire Detection Instrumentation, 3/4.7.11, Fire Suppression Sys & 3/4.7.12, Fire Barrier Penetrations, to Clarify Fire Watch Requirements
ML20098D668
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/26/1992
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20098D670 List:
References
CON-TVA-SQN-TS-92-05, CON-TVA-SQN-TS-92-5 NUDOCS 9205290234
Download: ML20098D668 (2)


Text

.

_. _ -. - ~.... ~.. - - _ -

,.4-'

e A

,e y

Jac t p w

.n m

May 26, 1992 TVA-SQN-TS-92-05 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington,-D.C. 20555 Gentiement

.In the Matter of

)

Docket Nos. 50-327

.Tennet.see Valley Authority

)

50-328 SEQUOYAll NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 92-05,

" REVISION OF TS BASES FOR FIRE WATCH" Enclosed is a requested amendment to the TS bases of SQN Units 1 and 2.

The proposad change revises TS Bases 3/4.3.3.8, " Fire Detection Instrumentation," 3/4.7.11. " Fire Suppression Systems," and 3/4.7.12,

" Fire Barrier Penetrations."

The proposed TS bases change is identified in Enclosure 1.

The justification for the proposed TS change is provided-in Enclosure 2.

Please direct questions concerning this issue to J. D. Smith at (615) 843-6672.

Sincerely,

'[

r J. L. Wilson

' Sworn t d subsc ibe before me

' day

>L > ' 1 92 1:

th

-+

h __

))

't otary Publio -

/- ~ M 7

~

My Commission Expires Enclosures cc:

See page 2 n gg/

/]

9205290234 920526

.4 PDR=' ADOCK 05000327 P

PDR ll7

4 U.S. Nuclear Regulatory Commission Page 2 May 26, 1992 Enclosures cc (Enclosures):

Mr. D E. Labarge tct Manager U.S. Nuclear Regu Commission One White Flint, h 11555 Rockville Pike Rockville, Msryland 20852 Mr. Michael P. Mobley, Director (w/o Enclosures)

Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue, N Nashville, Tennessee 37203 NRC Resider.; Inspector Segaoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 Mr. B. ii. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

-