                                                                  .              .      Log' # TXX-92373
L Log' # TXX-92373
'~                                                                 -          ' -
'~
Flie # 10110-(CP-92-007)
Flie # 10110-(CP-92-007)
Ref. # 10CFR50.55(e) l'UELECTRIC August 14, 1992                                 '
Ref. # 10CFR50.55(e) l'UELECTRIC August 14, 1992 Wilitam J. Cahlil, Jr.
Wilitam J. Cahlil, Jr.
Gruur Vice hrsklent L
Gruur Vice hrsklent L             U. S. Nuclear Regulator.v Commission Attn: Documant Controi Desk p             Washington. DC _20S55
U. S. Nuclear Regulator.v Commission Attn: Documant Controi Desk p
Washington. DC _20S55


==SUBJECT:==
==SUBJECT:==
COMANCHE f.AA STEAM ELECTRIC STATION (CPSES) - UNIT 2 DOCKET NO, 50-446 OVALITY ASSURANCE PROGRAM BREAKDCPN OF KRANCO, INC.
COMANCHE f.AA STEAM ELECTRIC STATION (CPSES) - UNIT 2 DOCKET NO, 50-446 OVALITY ASSURANCE PROGRAM BREAKDCPN OF KRANCO, INC.
50AR: CP-92-007 (FINAL REPORT) l REF:         1) Notice of Reportable Condition SDAR-CP-92-007, dated, July 16, 1992 Gentlemen:
50AR: CP-92-007 (FINAL REPORT) l REF:
On June 16, 1992, via the referenced f acsimile. TV Electric notified the NRC of- a condition discov2 red during a periodic vendor audit of Kranco, luc..
: 1) Notice of Reportable Condition SDAR-CP-92-007, dated, July 16, 1992 Gentlemen:
Houston, Texas, in which Kranco was ne longer implementing their luCFP50 Appendix B Quality Assurance (OA) Program. Furthermore, a Unit 2 purchase
On June 16, 1992, via the referenced f acsimile. TV Electric notified the NRC of-a condition discov2 red during a periodic vendor audit of Kranco, luc..
              - order invol ing_10CFR21 'and 10CFR50 Appendix B requirements, was filled by Kranco during the time-their program was not in effect.
Houston, Texas, in which Kranco was ne longer implementing their luCFP50 Appendix B Quality Assurance (OA) Program.
Attached is the written report which satisfies the reporting requirements af 10CFR50.55(e) for CPSES Unit 2.                   The report has been formatted in a manner that er,rresponds to the specific information reques*ed by subparts (i) through (viii) of paragraph 10CIR50.55(e)(8) of the regulation, sincerely,
Furthermore, a Unit 2 purchase
                                .-                                                      William-J. Cahill. Jr.
- order invol ing_10CFR21 'and 10CFR50 Appendix B requirements, was filled by Kranco during the time-their program was not in effect.
e n     j oy:_t       L%       >
Attached is the written report which satisfies the reporting requirements af 10CFR50.55(e) for CPSES Unit 2.
The report has been formatted in a manner that er,rresponds to the specific information reques*ed by subparts (i) through (viii) of paragraph 10CIR50.55(e)(8) of the regulation, sincerely, William-J. Cahill. Jr.
j e n oy:_t L%
D. R. Woodlan Docket Licensing Manager JAA/ds L
D. R. Woodlan Docket Licensing Manager JAA/ds L
c V Mr.'J. L. Hilhoan, Region IV Resident-Inspectors. CPSES (2)
c V Mr.'J. L. Hilhoan, Region IV Resident-Inspectors. CPSES (2)
Mr._T.       A. Bergman NRR' Mr. B.'E.-Holian, NRR
Mr._T.
[h'flVl             ,
A.
9 08100216 920814
Bergman NRR' Mr. B.'E.-Holian, NRR
      -PR - ADOt'K 03000446                                              0[f) /$             /I/   '
[h'flVl 9 08100216 920814 0[f) /$
kd     //
/I/
                                                                                                                        '[ "
kd
(  l I
//
                                                                                                                        /
'[
      'B                            PDR          400 N. Olive sucet LB. 81 Dallas. Texas 75201                            [' --
(
(
l
-PR - ADOt'K 03000446
'B PDR 400 N. Olive sucet LB. 81 Dallas. Texas 75201
/
[' - (


I r %
I r %
                  .                                                                                                                  \
\\
  $        78 ?
78 ?
      ;*                                                                                                                          l
Attachment to TXX-92373'
                    .x    Attachment to TXX-92373' Page 1 of-2 10CFR50,55(e) REPORTABLE CONDITION INVOLVING
.x Page 1 of-2 10CFR50,55(e) REPORTABLE CONDITION INVOLVING
                                                            -0A PROGRAM BREAMDOWN OF-KRANCO, INC.
-0A PROGRAM BREAMDOWN OF-KRANCO, INC.
(i)             Information supplied by:
(i)
Information supplied by:
William J..Cahill, Jr.
William J..Cahill, Jr.
TV Electric 400 North Olive Street, L.B. 81 Dallas,           Texas         75201 L(ii)         .The sctivity involved Kranco's implementation of their -10CFR50 Appendix B OA program in the supply of spare-and refurbished parts
TV Electric 400 North Olive Street, L.B. 81
    .                                  .for the CPSES Unit 2 polar crane, t                           ..              _
: Dallas, Texas 75201 L(ii)
(iii)         Kronco           Inc., Houston, Texas (iv)           '
.The sctivity involved Kranco's implementation of their -10CFR50 Appendix B OA program in the supply of spare-and refurbished parts
                                                  > failure to ,:omply-involves Krancc*s lack of implementation cf.
.for the CPSES Unit 2 polar crane, t
seir'10CFR50 Appendix B OA program.           Specifically, in the supply _
(iii)
of_spc e and refurbished parts for the Unit 2 polar crane, Kranco j
Kronco Inc., Houston, Texas (iv)
failed-to:
> failure to,:omply-involves Krancc*s lack of implementation cf.
Impose 10CFR50 Appendix B and 10CFR21 tequirements on sub-tier suppliers
seir'10CFR50 Appendix B OA program.
                                                      -Es+.ablish and maintain the qualificatiun records of
Specifically, in the supply _
                                                        . personnel' performing activities affecting Quality Perform audits /surveillances of sub-tier. suppl.iers Failure of Kranco to implement their 10CFR50 Appendi'x B OA program
of_spc e and refurbished parts for the Unit 2 polar crane, Kranco failed-to:
                                        -may hav( resulted inEthe installetion and use of substandard components in ihe CPSES Unit 2-polar crane. A dropped load inside
j Impose 10CFR50 Appendix B and 10CFR21 tequirements on sub-tier suppliers
      ._                                containment.may have resulted i             a_ release of fission products
-Es+.ablish and maintain the qualificatiun records of
                                        .from nuclear fuel or damage to-systems / components relied upon "or safe shutdown.                                                                           ,
. personnel' performing activities affecting Quality Perform audits /surveillances of sub-tier. suppl.iers Failure of Kranco to implement their 10CFR50 Appendi'x B OA program
-may hav( resulted inEthe installetion and use of substandard components in ihe CPSES Unit 2-polar crane.
A dropped load inside containment.may have resulted i a_ release of fission products
.from nuclear fuel or damage to-systems / components relied upon "or safe shutdown.
It should be noted thatidespite Kranco's failure-to iminement
It should be noted thatidespite Kranco's failure-to iminement
                                        .their-10CFR50 Appendix B'0A_ program in the supply'of--compenents discussed:in tvi) below,-TU Electric has no evidence that the components' supplied are substandard in any characteristic.
.their-10CFR50 Appendix B'0A_ program in the supply'of--compenents discussed:in tvi) below,-TU Electric has no evidence that the components' supplied are substandard in any characteristic.
                          -(v)           The f ailure- to comply was identified during an audit of the Kranco
-(v)
                                        -0A program with the. audit results being formally' transmitted to p                                         Kranco viaETU Electric letter dated ~,-May.18,- 1992.
The f ailure-to comply was identified during an audit of the Kranco
-0A program with the. audit results being formally' transmitted to p
Kranco viaETU Electric letter dated ~,-May.18,- 1992.
E
E
  -I                                                                                                                             '
-I


            , . . -            ..      . .                              -. -. ... - . . - -                        . - . -            .- .        - . ., . . . . . . ~ . .       ,
-..,...... ~..
1
1 to TXX-32373 Page 2.of 2-C (vi)
                    ,      Attachment 1 to TXX-32373 Page 2.of           -
Polar Crane components supplied to CPSES Unit 2 without the benefit of a 10CFR50 Appendix B OA program consist of two (2) load cells.-two (2) force switches, two (2) short links and eight (8) shacklet.
2-C (vi)                 Polar Crane components supplied to CPSES Unit 2 without the                                                                         ;
Kranco's records indicate that these were the only safety related components ordered by any facility in the last six years.
benefit of a 10CFR50 Appendix B OA program consist of two (2) load cells.-two (2) force switches, two (2) short links and eight (8) shacklet. Kranco's records indicate that these were the only safety related components ordered by any facility in the last six years.
(vii)-
(vii)-               Kranco, Inc. was formally notified of the TL Electric audit findings on May 18, 1992.                   Corrective actions have been initiated by Kranco to-resolve the audit deficiencies and these corrective
Kranco, Inc. was formally notified of the TL Electric audit findings on May 18, 1992.
                                                - actions are being reviewed by TV Electric.                                 Further purchases by TV Electric are being restricted pending resolution of the
Corrective actions have been initiated by Kranco to-resolve the audit deficiencies and these corrective
                                                - findings.     In addition, TV Electric will not utilize the supplied' components for critical lifts until the parts are dedicated for use or replaced with componer,ts having certifiable records.
- actions are being reviewed by TV Electric.
L                           (viii)               TU Electric has established that at CPSES only Unit 2 is af fected by this deficiency, Kranco records indicate no other nuclear facility placed a purchase order for. safety related crane parts during the time their 10CFR50 Appendix B OA program.was not in
Further purchases by TV Electric are being restricted pending resolution of the
                                              - effect. Based en this, no advise is being given to other
- findings.
In addition, TV Electric will not utilize the supplied' components for critical lifts until the parts are dedicated for use or replaced with componer,ts having certifiable records.
L (viii)
TU Electric has established that at CPSES only Unit 2 is af fected by this deficiency, Kranco records indicate no other nuclear facility placed a purchase order for. safety related crane parts during the time their 10CFR50 Appendix B OA program.was not in
- effect.
Based en this, no advise is being given to other
: entities.
: entities.
l' l.
l' l.
p 1
p 1
T 'y             v-- $9v   3   -
T
P   -'WV ^     r ?hPae               y-   -      *  -we 4 --e+-mer     .*-  -
'y v-- $9v 3
e'''+ 4 >*- -'w-'-*w                     *  'WW
P
* eP}}
-'WV
^
r
?hPae y-
-we 4
--e+-mer e'''+
4
-'w-'-*w
'WW eP
*}}

Latest revision as of 06:29, 13 December 2024

Final Deficiency Rept CP-92-007 Re Failure of Kranco to Implement 10CFR50,App B QA Program for Polar Crane Components.Initially Reported on 920616.Further Purchases from Kranco Restricted.Also Reported Per Part 21
ML20099H257
Person / Time
Site: Comanche Peak 
Issue date: 08/14/1992
From: William Cahill, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-92 CP-92-007, CP-92-7, TXX-92373, NUDOCS 9208180216
Download: ML20099H257 (3)


Text

.

,a,-

M_

L Log' # TXX-92373

'~

Flie # 10110-(CP-92-007)

Ref. # 10CFR50.55(e) l'UELECTRIC August 14, 1992 Wilitam J. Cahlil, Jr.

Gruur Vice hrsklent L

U. S. Nuclear Regulator.v Commission Attn: Documant Controi Desk p

Washington. DC _20S55

SUBJECT:

COMANCHE f.AA STEAM ELECTRIC STATION (CPSES) - UNIT 2 DOCKET NO, 50-446 OVALITY ASSURANCE PROGRAM BREAKDCPN OF KRANCO, INC.

50AR: CP-92-007 (FINAL REPORT) l REF:

1) Notice of Reportable Condition SDAR-CP-92-007, dated, July 16, 1992 Gentlemen:

On June 16, 1992, via the referenced f acsimile. TV Electric notified the NRC of-a condition discov2 red during a periodic vendor audit of Kranco, luc..

Houston, Texas, in which Kranco was ne longer implementing their luCFP50 Appendix B Quality Assurance (OA) Program.

Furthermore, a Unit 2 purchase

- order invol ing_10CFR21 'and 10CFR50 Appendix B requirements, was filled by Kranco during the time-their program was not in effect.

Attached is the written report which satisfies the reporting requirements af 10CFR50.55(e) for CPSES Unit 2.

The report has been formatted in a manner that er,rresponds to the specific information reques*ed by subparts (i) through (viii) of paragraph 10CIR50.55(e)(8) of the regulation, sincerely, William-J. Cahill. Jr.

j e n oy:_t L%

D. R. Woodlan Docket Licensing Manager JAA/ds L

c V Mr.'J. L. Hilhoan, Region IV Resident-Inspectors. CPSES (2)

Mr._T.

A.

Bergman NRR' Mr. B.'E.-Holian, NRR

[h'flVl 9 08100216 920814 0[f) /$

/I/

kd

//

'[

(

l

-PR - ADOt'K 03000446

'B PDR 400 N. Olive sucet LB. 81 Dallas. Texas 75201

/

[' - (

I r %

\\

78 ?

Attachment to TXX-92373'

.x Page 1 of-2 10CFR50,55(e) REPORTABLE CONDITION INVOLVING

-0A PROGRAM BREAMDOWN OF-KRANCO, INC.

(i)

Information supplied by:

William J..Cahill, Jr.

TV Electric 400 North Olive Street, L.B. 81

Dallas, Texas 75201 L(ii)

.The sctivity involved Kranco's implementation of their -10CFR50 Appendix B OA program in the supply of spare-and refurbished parts

.for the CPSES Unit 2 polar crane, t

(iii)

Kronco Inc., Houston, Texas (iv)

> failure to,:omply-involves Krancc*s lack of implementation cf.

seir'10CFR50 Appendix B OA program.

Specifically, in the supply _

of_spc e and refurbished parts for the Unit 2 polar crane, Kranco failed-to:

j Impose 10CFR50 Appendix B and 10CFR21 tequirements on sub-tier suppliers

-Es+.ablish and maintain the qualificatiun records of

. personnel' performing activities affecting Quality Perform audits /surveillances of sub-tier. suppl.iers Failure of Kranco to implement their 10CFR50 Appendi'x B OA program

-may hav( resulted inEthe installetion and use of substandard components in ihe CPSES Unit 2-polar crane.

A dropped load inside containment.may have resulted i a_ release of fission products

.from nuclear fuel or damage to-systems / components relied upon "or safe shutdown.

It should be noted thatidespite Kranco's failure-to iminement

.their-10CFR50 Appendix B'0A_ program in the supply'of--compenents discussed:in tvi) below,-TU Electric has no evidence that the components' supplied are substandard in any characteristic.

-(v)

The f ailure-to comply was identified during an audit of the Kranco

-0A program with the. audit results being formally' transmitted to p

Kranco viaETU Electric letter dated ~,-May.18,- 1992.

E

-I

-..,...... ~..

1 to TXX-32373 Page 2.of 2-C (vi)

Polar Crane components supplied to CPSES Unit 2 without the benefit of a 10CFR50 Appendix B OA program consist of two (2) load cells.-two (2) force switches, two (2) short links and eight (8) shacklet.

Kranco's records indicate that these were the only safety related components ordered by any facility in the last six years.

(vii)-

Kranco, Inc. was formally notified of the TL Electric audit findings on May 18, 1992.

Corrective actions have been initiated by Kranco to-resolve the audit deficiencies and these corrective

- actions are being reviewed by TV Electric.

Further purchases by TV Electric are being restricted pending resolution of the

- findings.

In addition, TV Electric will not utilize the supplied' components for critical lifts until the parts are dedicated for use or replaced with componer,ts having certifiable records.

L (viii)

TU Electric has established that at CPSES only Unit 2 is af fected by this deficiency, Kranco records indicate no other nuclear facility placed a purchase order for. safety related crane parts during the time their 10CFR50 Appendix B OA program.was not in

- effect.

Based en this, no advise is being given to other

entities.