ML20099J072: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_                         _    =                 .  .  -          - - -
{{#Wiki_filter:_
l l
=
l APPENDIX BA ELECTRIC POWER - INTERFACES O     8A.2 0FFSITE POWER SYSTEM
APPENDIX BA ELECTRIC POWER - INTERFACES O
: 1. Electrical power f rom the power grid to the plant site shall be supplied by two physically independent circuits designed and located so as to minimize the likelihood of simultaneous failure, i
8A.2 0FFSITE POWER SYSTEM 1.
: 2. Each of these independent circuits shall have the capability to safely shutdown the unit.     The first preferred circuit shall be connected via a main transformer and unit auxiliary transformer, and shall have the capacity to supply the startup and all the auxiliary loads (both group 1 and group 2) simultaneously.
Electrical power f rom the power grid to the plant site shall be supplied by two physically independent circuits designed and located so as to minimize the likelihood of simultaneous failure, i
: 3. The second preferred power circuit shall supply power to the standby O           transformer and shall have the capacity to supply all the safety-related                 ,
2.
I              loads   and all     the _ auxiliary     loads (both group 1 and group 2) simultaneously.       In addition, an ESF transformer will be provided to supply Class lE busses only. This will require independent connection to the offsite source.
Each of these independent circuits shall have the capability to safely shutdown the unit.
: 4. The loss of the nuclear unit or the most critical unit on the grid shall not result in the loss of offsite power to the Class 1E busses.
The first preferred circuit shall be connected via a main transformer and unit auxiliary transformer, and shall have the capacity to supply the startup and all the auxiliary loads (both group 1 and group 2) simultaneously.
: 5. The switchyard power circuit breaker control shall be designed with
3.
,              duplicate and redundant systems, i.e., two independent battery systems, two trip coils per breaker, and two independent protective relay schemes.
The second preferred power circuit shall supply power to the standby O
O O                                                                                                     i WAPWR-I&C/EP                                 8A.2-1                     NOVEMBER, 1984 8267B:ld
transformer and shall have the capacity to supply all the safety-related I
loads and all the _ auxiliary loads (both group 1 and group 2) simultaneously.
In addition, an ESF transformer will be provided to supply Class lE busses only. This will require independent connection to the offsite source.
4.
The loss of the nuclear unit or the most critical unit on the grid shall not result in the loss of offsite power to the Class 1E busses.
5.
The switchyard power circuit breaker control shall be designed with duplicate and redundant systems, i.e.,
two independent battery systems, two trip coils per breaker, and two independent protective relay schemes.
O O
WAPWR-I&C/EP 8A.2-1 NOVEMBER, 1984 8267B:ld
~,
~,
85031}0 PDR g gM     h601 500
85031}0 g gM h601 500 PDR X- -
      - .      - .              - . X- -            -
PDR. - - -. - - - - - - - - - - - - - -
PDR. - - - . - - - - - - - - - - - - - -}}
-}}

Latest revision as of 06:25, 13 December 2024

App 8A of RESAR-SP/90 Westinghouse Advanced PWR Module 9, Instrumentation & Controls & Electric Power, Electric Power - Interfaces
ML20099J072
Person / Time
Site: 05000601
Issue date: 11/30/1984
From:
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
Shared Package
ML19269B210 List:
References
NUDOCS 8503190585
Download: ML20099J072 (1)


Text

_

=

APPENDIX BA ELECTRIC POWER - INTERFACES O

8A.2 0FFSITE POWER SYSTEM 1.

Electrical power f rom the power grid to the plant site shall be supplied by two physically independent circuits designed and located so as to minimize the likelihood of simultaneous failure, i

2.

Each of these independent circuits shall have the capability to safely shutdown the unit.

The first preferred circuit shall be connected via a main transformer and unit auxiliary transformer, and shall have the capacity to supply the startup and all the auxiliary loads (both group 1 and group 2) simultaneously.

3.

The second preferred power circuit shall supply power to the standby O

transformer and shall have the capacity to supply all the safety-related I

loads and all the _ auxiliary loads (both group 1 and group 2) simultaneously.

In addition, an ESF transformer will be provided to supply Class lE busses only. This will require independent connection to the offsite source.

4.

The loss of the nuclear unit or the most critical unit on the grid shall not result in the loss of offsite power to the Class 1E busses.

5.

The switchyard power circuit breaker control shall be designed with duplicate and redundant systems, i.e.,

two independent battery systems, two trip coils per breaker, and two independent protective relay schemes.

O O

WAPWR-I&C/EP 8A.2-1 NOVEMBER, 1984 8267B:ld

~,

85031}0 g gM h601 500 PDR X- -

PDR. - - -. - - - - - - - - - - - - - -

-