ML20101N865: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:i l
{{#Wiki_filter:i l
  ''                                                                      SCHOOL OF ENGINEERING B
SCHOOL OF ENGINEERING B
                                                                          & APPLIED SCIENCE NUCLEAR REACTOR FACILITY Department of Mechanical, Aerospace & Nuclear Engineering University of Virginia Charlottesville, VA 22903-2442 804-982-5440 FAX: 804-982-5473 March 26,1996 Mr. Craig Bassett Nuclear Regulatory Commission 101 Marietta Street, N.W.
& APPLIED SCIENCE NUCLEAR REACTOR FACILITY Department of Mechanical, Aerospace & Nuclear Engineering University of Virginia Charlottesville, VA 22903-2442 804-982-5440 FAX: 804-982-5473 March 26,1996 Mr. Craig Bassett Nuclear Regulatory Commission 101 Marietta Street, N.W.
Atlanta, Georgia 30323
Atlanta, Georgia 30323


==Dear Mr. Bassett,==
==Dear Mr. Bassett,==
Attached is revision #19 to the Emergency Plan Imp lementing Procedures (EPIP's) for the University of Virginia Nuclear Reactor Facility. The revision reflects changes in personnel and phone numbers.
Attached is revision #19 to the Emergency Plan Imp lementing Procedures (EPIP's) for the University of Virginia Nuclear Reactor Facility. The revision reflects changes in personnel and phone numbers.
Please make the following changes to your copy #23 of the EPIP's and return the attached sheet with your signature to me in order to verify that the changes have been made.
Please make the following changes to your copy #23 of the EPIP's and return the attached sheet with your signature to me in order to verify that the changes have been made.
__ REMOVE                                         Add These Pages EPIP 6, Page 2 of 4                             EPIP 6, page 2 of 4 EPIP 6, Attachment 1, page 1 of 2               EPIP 6, Attachment 1, Page 1 of 2 EPIP 6, Attachment 1, page 2 of 2               EPIP 6, Attachment 1, page 2 of 2 EPIP 14, Attachment 1, page 1 of 1               EPIP 14, Attachment 1, page 1 of 1 Sincerely, CL           h fP. Farrar, Administrator U.Va. Reactor Facility l
__ REMOVE Add These Pages EPIP 6, Page 2 of 4 EPIP 6, page 2 of 4 EPIP 6, Attachment 1, page 1 of 2 EPIP 6, Attachment 1, Page 1 of 2 EPIP 6, Attachment 1, page 2 of 2 EPIP 6, Attachment 1, page 2 of 2 EPIP 14, Attachment 1, page 1 of 1 EPIP 14, Attachment 1, page 1 of 1 Sincerely, CL h
fP. Farrar, Administrator U.Va. Reactor Facility l
090009 I O j$$4$$oISOIOSh2 F
090009 I O j$$4$$oISOIOSh2 F
g $f '}}
g $f
'}}

Latest revision as of 04:18, 13 December 2024

Forwards Rev 19 to EPIPs for Facility,Including EPIP 6,page 2,EPIP 6,Attachment 1,pages 1 & 2 & EPIP 14,Attachment 1, Page 1.Rev Reflects Changes in Personnel & Phone Numbers.W/O Encls
ML20101N865
Person / Time
Site: University of Virginia
Issue date: 03/26/1996
From: Farrar J
VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA
To: Bassett C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9604090163
Download: ML20101N865 (1)


Text

i l

SCHOOL OF ENGINEERING B

& APPLIED SCIENCE NUCLEAR REACTOR FACILITY Department of Mechanical, Aerospace & Nuclear Engineering University of Virginia Charlottesville, VA 22903-2442 804-982-5440 FAX: 804-982-5473 March 26,1996 Mr. Craig Bassett Nuclear Regulatory Commission 101 Marietta Street, N.W.

Atlanta, Georgia 30323

Dear Mr. Bassett,

Attached is revision #19 to the Emergency Plan Imp lementing Procedures (EPIP's) for the University of Virginia Nuclear Reactor Facility. The revision reflects changes in personnel and phone numbers.

Please make the following changes to your copy #23 of the EPIP's and return the attached sheet with your signature to me in order to verify that the changes have been made.

__ REMOVE Add These Pages EPIP 6, Page 2 of 4 EPIP 6, page 2 of 4 EPIP 6, Attachment 1, page 1 of 2 EPIP 6, Attachment 1, Page 1 of 2 EPIP 6, Attachment 1, page 2 of 2 EPIP 6, Attachment 1, page 2 of 2 EPIP 14, Attachment 1, page 1 of 1 EPIP 14, Attachment 1, page 1 of 1 Sincerely, CL h

fP. Farrar, Administrator U.Va. Reactor Facility l

090009 I O j$$4$$oISOIOSh2 F

g $f

'