(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 06/07/2005 EDT
| event date = 06/07/2005 EDT
| last update date = 06/10/2005
| last update date = 06/10/2005
| title = Part 21 Report Involving A Potential For Premature Failure Of Control Rod Instrumentation Power Supply
| title = Part 21 Report Involving a Potential for Premature Failure of Control Rod Instrumentation Power Supply
| event text = Ametek Solid State Controls produces AC-DC power supplies that are used at several nuclear power plants.  Ametek states that its Series AC-DC power supplies may have a problem with premature failure.  The specific Model Numbers affected are as follows:
| event text = Ametek Solid State Controls produces AC-DC power supplies that are used at several nuclear power plants.  Ametek states that its Series AC-DC power supplies may have a problem with premature failure.  The specific Model Numbers affected are as follows:
85-RP1510-00
85-RP1510-00
85-RP4804-00
85-RP4804-00
85-RP4808-00
85-RP4808-00
85-RP DUAL-48071
85-RP DUAL-4807\1
Ametek states that an intermittent loss of continuity in a magnet wire connector may cause overheating in a lug and transformer which could eventually result in a premature failure of the power supply ( within approximately two years of initial service).  The problem was discovered during testing of a power supplies by Ametek.  No nuclear power plants have reported any problems with the power supplies.
Ametek states that an intermittent loss of continuity in a magnet wire connector may cause overheating in a lug and transformer which could eventually result in a premature failure of the power supply ( within approximately two years of initial service).  The problem was discovered during testing of a power supplies by Ametek.  No nuclear power plants have reported any problems with the power supplies.
Ametek states that its records indicate that these power supplies were supplied to Braidwood, Byron, and DC Cook.  
Ametek states that its records indicate that these power supplies were supplied to Braidwood, Byron, and DC Cook.  

Latest revision as of 21:20, 1 March 2018

ENS 41761 +/-
Where
Ametek Solid State Controls
Columbus, Ohio (NRC Region 3)
Organization: Ametek Solid State Controls
Reporting
10 CFR 21.21
Time - Person (Reporting Time:+77.12 h3.213 days <br />0.459 weeks <br />0.106 months <br />)
Opened: Bob George
09:07 Jun 10, 2005
NRC Officer: Bill Huffman
Last Updated: Jun 10, 2005