ENS 41934: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 08/19/2005 EDT
| event date = 08/19/2005 EDT
| last update date = 09/02/2005
| last update date = 09/02/2005
| title = Violation Of Maximum Core Power Level Per Operating License Requirements
| title = Violation of Maximum Core Power Level Per Operating License Requirements
| event text = Pursuant to the reporting requirements of Item 2.H of the [Vogtle Electric Generating Plant] VEGP Unit 1 and Unit 2 operating licenses, [Southern Nuclear Company] SNC is notifying the NRC of overpower events in violation of the maximum core power level of 3565 MWt authorized by Item 2.C.(1) of the licenses.  
| event text = Pursuant to the reporting requirements of Item 2.H of the [Vogtle Electric Generating Plant] VEGP Unit 1 and Unit 2 operating licenses, [Southern Nuclear Company] SNC is notifying the NRC of overpower events in violation of the maximum core power level of 3565 MWt authorized by Item 2.C.(1) of the licenses.  
Based on a review of operating data dating back to January 2, 2002, SNC has identified occurrences where the daily average core power exceeded 3565 MWt by as much as 0.4 MWt for Unit 1 and 0.9 MWt for Unit 2.
Based on a review of operating data dating back to January 2, 2002, SNC has identified occurrences where the daily average core power exceeded 3565 MWt by as much as 0.4 MWt for Unit 1 and 0.9 MWt for Unit 2.

Latest revision as of 22:20, 1 March 2018

ENS 41934 +/-
Where
Vogtle Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting
Other Unspec Reqmnt
Time - Person (Reporting Time:+16.53 h0.689 days <br />0.0984 weeks <br />0.0226 months <br />)
Opened: David Vineyard
20:32 Aug 19, 2005
NRC Officer: John Knoke
Last Updated: Sep 2, 2005
41934 - NRC Website
Loading map...