ENS 42446: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by Mark Hawes |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 16: | Line 16: | ||
| event date = 03/23/2006 12:50 EST | | event date = 03/23/2006 12:50 EST | ||
| last update date = 04/04/2006 | | last update date = 04/04/2006 | ||
| title = 24-Hour Condition | | title = 24-Hour Condition of License Report Due to Thermal Power Potentially Exceeding Licensed Limit | ||
| event text = McGuire Unit 1 and Unit 2 may have been operating greater than design thermal power limits of 3411 MW [Megawatt] by approximately 0.08% due to discovery of non-conservative thermal power calculations. Preliminary evaluation of Steam Generator Blow Down inputs into the thermal power calorimetric indicates a non-conservative error resulting in indicated total thermal power being approximately 0.08% lower than actual. Additional evaluations to confirm indicated power are ongoing. Power was reduced as soon as the on duty shift was made aware of the error and both Unit 1 and Unit 2 indicated thermal power is being limited to less than 99.85% to ensure actual reactor power remains less than 3411 MW. | | event text = McGuire Unit 1 and Unit 2 may have been operating greater than design thermal power limits of 3411 MW [Megawatt] by approximately 0.08% due to discovery of non-conservative thermal power calculations. Preliminary evaluation of Steam Generator Blow Down inputs into the thermal power calorimetric indicates a non-conservative error resulting in indicated total thermal power being approximately 0.08% lower than actual. Additional evaluations to confirm indicated power are ongoing. Power was reduced as soon as the on duty shift was made aware of the error and both Unit 1 and Unit 2 indicated thermal power is being limited to less than 99.85% to ensure actual reactor power remains less than 3411 MW. | ||
This notification is being made pursuant to the McGuire Facility Operating License Condition 2.C.(1) Maximum Power Level. | This notification is being made pursuant to the McGuire Facility Operating License Condition 2.C.(1) Maximum Power Level. | ||
Latest revision as of 21:19, 1 March 2018
| Where | |
|---|---|
| McGuire North Carolina (NRC Region 2) | |
| Reporting | |
| Other Unspec Reqmnt | |
| Time - Person (Reporting Time:+0.5 h0.0208 days <br />0.00298 weeks <br />6.849e-4 months <br />) | |
| Opened: | Fred Kirk 18:20 Mar 23, 2006 |
| NRC Officer: | Steve Sandin |
| Last Updated: | Apr 4, 2006 |
| 42446 - NRC Website
| |