RBG-21034, Suppls 850503 Response to Violations Noted in Insp Rept 50-458/84-35.Supplemental Commitment Dates for Significant Deficiencies Re Emergency Planning Provided: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:, p >. ,
{{#Wiki_filter:, p >.,
GULF STATES                 UTILITIES               COMPANY POST OFFICE HOX 2951
GULF STATES UTILITIES COMPANY DEAUMONT, TEXAS 77704 POST OFFICE HOX 2951 AREA CODE 713 030-0631 May 17, 1985 REG-21034 File Code G9.5 G9.20.6.22 G15.4.1 Mr. Robert D. Martin, Regional Administrator b@@
* DEAUMONT, TEXAS 77704 AREA CODE 713 030-0631 May 17, 1985 REG-21034 File Code G9.5 G9.20.6.22 G15.4.1 Mr. Robert D. Martin, Regional Administrator                         b@@     -
U. S. Nuclear Regulatory Comission j
U. S. Nuclear Regulatory Comission                               j Region IV, Office of Inspection and Enforcement 611 Ryan Plaza, Suite 1000
Region IV, Office of Inspection and Enforcement
                                                                                    ,gg Arlington, TX 76011                                                             .
,gg 611 Ryan Plaza, Suite 1000 Arlington, TX 76011
                                                                                              //
. //


==Dear Mr. Martin:==
==Dear Mr. Martin:==
River Bend Station-Unit 1 Refer to: Region IV Docket No. 50-458/ Report 84-35 In response to a request from Mr. J. B. Baird, NRC Region IV, enclosed is supplemental information to our response (RBG-20894 dated May 3,1985) to Inspection Report 84-35 findings. This information replaces the terms " fuel load" and " prior to exceeding five percent power" with specific dates for the deficiencies indicated in the enclosure.
Sincerely,
/,{ d A
J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/W O/
r/df Enclosure cc Mr. E. L. Jordan, Director Division of Emergency Preparedness & Engineering Response Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8506240591 850618
/
PDR ADOCK 05000458 Q('f /%)
G PDR
/JU J


River Bend Station-Unit 1 Refer to: Region IV Docket No. 50-458/ Report 84-35 In response to a request from Mr. J. B. Baird, NRC Region IV, enclosed is supplemental information to our response (RBG-20894 dated May 3,1985) to Inspection Report 84-35 findings. This information replaces the terms " fuel load" and " prior to exceeding five percent power" with specific dates for the deficiencies indicated in the enclosure.
,.l
Sincerely, A
* jl W Gulf States Utilities Company River Bend Station Emergency Planning Supplemental Commitment Dates on Significant Deficiencies Deficiency No.
                                                              /,{ d J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/W O/        r/df Enclosure cc  Mr. E. L. Jordan, Director Division of Emergency Preparedness & Engineering Response Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8506240591 850618
Subject Date 458/8435-05 Augmentation Drill July 12 458/8435-24 TSC Records Room Document Update June 14 458/8435-25 (1) Turnover to GSU Ventilation System in TSC June 7 (2) Turnover to GSU Continuous Air June 19 Monitors (3) Appropriate Procedures for Operation of Air Monitors June 14 458/8435-44 (1) Turnover to GSU Fire Detection System June 14 River Water Make-up Structure for Fire Detection System July 12 (2) Turnover to GSU Main Control Room Instrumentation used in Classifying Emergencies June 19 458/8435-46 Prompt Notification System Testing May 29 458/8435-73 Addition of Speakers to Gaitronics System July 12 458/8435-84 Turnover and Testing of Security System July 12 458/8435-85 Accountability Drill July 12 458/8435-102 Transient Public Information Distribution July 12
                /                                    PDR      ADOCK 05000458 G                        PDR
)
      /    Q('f /%)
I
JU
*Significant Deficiencies 458/8435-45 and 458/8435-46 were reversed'as identified in the GSU response dated May 3, 1985.
'                                                                                                J
)
* jl W
'}}
                                    ,.l                                        ,
Gulf States Utilities Company River Bend Station Emergency Planning Supplemental Commitment Dates on Significant Deficiencies Deficiency No.       Subject                   ,    ,            Date 458/8435-05         Augmentation Drill                           July 12 458/8435-24         TSC Records Room Document Update             June 14 458/8435-25         (1) Turnover to GSU Ventilation System in TSC                                 June 7 (2) Turnover to GSU Continuous Air Monitors                    -        June 19 (3) Appropriate Procedures for Operation of Air Monitors                       June 14 458/8435-44         (1) Turnover to GSU Fire Detection System   June 14 River Water Make-up Structure for Fire Detection System                 July 12 (2) Turnover to GSU Main Control Room Instrumentation used in Classifying Emergencies                           June 19 458/8435-46         Prompt Notification System Testing           May 29 458/8435-73         Addition of Speakers to Gaitronics System   July 12 458/8435-84         Turnover and Testing of Security System     July 12 458/8435-85         Accountability Drill                         July 12 458/8435-102         Transient Public Information Distribution   July 12 I                                    ,
                                                                                  )
        *Significant Deficiencies 458/8435-45 and 458/8435-46 were reversed'as identified in the GSU response dated May 3, 1985.
                                                                                      )}}

Latest revision as of 17:54, 12 December 2024

Suppls 850503 Response to Violations Noted in Insp Rept 50-458/84-35.Supplemental Commitment Dates for Significant Deficiencies Re Emergency Planning Provided
ML20127E578
Person / Time
Site: River Bend 
Issue date: 05/17/1985
From: Booker J
GULF STATES UTILITIES CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20127E541 List:
References
RBG-21034, NUDOCS 8506240591
Download: ML20127E578 (2)


Text

, p >.,

GULF STATES UTILITIES COMPANY DEAUMONT, TEXAS 77704 POST OFFICE HOX 2951 AREA CODE 713 030-0631 May 17, 1985 REG-21034 File Code G9.5 G9.20.6.22 G15.4.1 Mr. Robert D. Martin, Regional Administrator b@@

U. S. Nuclear Regulatory Comission j

Region IV, Office of Inspection and Enforcement

,gg 611 Ryan Plaza, Suite 1000 Arlington, TX 76011

. //

Dear Mr. Martin:

River Bend Station-Unit 1 Refer to: Region IV Docket No. 50-458/ Report 84-35 In response to a request from Mr. J. B. Baird, NRC Region IV, enclosed is supplemental information to our response (RBG-20894 dated May 3,1985) to Inspection Report 84-35 findings. This information replaces the terms " fuel load" and " prior to exceeding five percent power" with specific dates for the deficiencies indicated in the enclosure.

Sincerely,

/,{ d A

J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/W O/

r/df Enclosure cc Mr. E. L. Jordan, Director Division of Emergency Preparedness & Engineering Response Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8506240591 850618

/

PDR ADOCK 05000458 Q('f /%)

G PDR

/JU J

,.l

  • jl W Gulf States Utilities Company River Bend Station Emergency Planning Supplemental Commitment Dates on Significant Deficiencies Deficiency No.

Subject Date 458/8435-05 Augmentation Drill July 12 458/8435-24 TSC Records Room Document Update June 14 458/8435-25 (1) Turnover to GSU Ventilation System in TSC June 7 (2) Turnover to GSU Continuous Air June 19 Monitors (3) Appropriate Procedures for Operation of Air Monitors June 14 458/8435-44 (1) Turnover to GSU Fire Detection System June 14 River Water Make-up Structure for Fire Detection System July 12 (2) Turnover to GSU Main Control Room Instrumentation used in Classifying Emergencies June 19 458/8435-46 Prompt Notification System Testing May 29 458/8435-73 Addition of Speakers to Gaitronics System July 12 458/8435-84 Turnover and Testing of Security System July 12 458/8435-85 Accountability Drill July 12 458/8435-102 Transient Public Information Distribution July 12

)

I

  • Significant Deficiencies 458/8435-45 and 458/8435-46 were reversed'as identified in the GSU response dated May 3, 1985.

)

'