ENS 43675: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by Mark Hawes
 
Created page by program invented by StriderTol
 
Line 16: Line 16:
| event date = 09/28/2007 17:00 EDT
| event date = 09/28/2007 17:00 EDT
| last update date = 09/28/2007
| last update date = 09/28/2007
| title = Reactor Vessel Head Vent May Not Be Isolable During A Fire
| title = Reactor Vessel Head Vent May Not Be Isolable During a Fire
| event text = Plant engineering determined that in a postulated fire in the Control Room or Cable Spreading Room which required Control Room evacuation, that "hot shorts" may prevent the reactor vessel head vents from performing their emergency functions in accordance with the plant Emergency Operating Procedures (EOPs).  Several relays in the letdown system are not isolated at the Auxiliary Shutdown Panel and have the potential for shorting during a fire.  This letdown path can be aligned from the reactor vessel head vents during certain EOP scenarios.
| event text = Plant engineering determined that in a postulated fire in the Control Room or Cable Spreading Room which required Control Room evacuation, that "hot shorts" may prevent the reactor vessel head vents from performing their emergency functions in accordance with the plant Emergency Operating Procedures (EOPs).  Several relays in the letdown system are not isolated at the Auxiliary Shutdown Panel and have the potential for shorting during a fire.  This letdown path can be aligned from the reactor vessel head vents during certain EOP scenarios.
The affected reactor vessel head vent isolation transfer switches are:  3RCS*SV8095A & B and 3RCS*SV8096A & B.
The affected reactor vessel head vent isolation transfer switches are:  3RCS*SV8095A & B and 3RCS*SV8096A & B.

Latest revision as of 21:15, 1 March 2018

ENS 43675 +/-
Where
Millstone 
Connecticut (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
Time - Person (Reporting Time:+-2.25 h-0.0938 days <br />-0.0134 weeks <br />-0.00308 months <br />)
Opened: Brien Strizzi
18:45 Sep 28, 2007
NRC Officer: Mark Abramovitz
Last Updated: Sep 28, 2007
43675 - NRC Website
Loading map...