ENS 43895: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 01/11/2008 16:22 CST
| event date = 01/11/2008 16:22 CST
| last update date = 01/14/2008
| last update date = 01/14/2008
| title = Tech. Spec. Required Shutdown Due To Gas Voiding In Discharge Piping  
| title = Tech. Spec. Required Shutdown Due to Gas Voiding in Discharge Piping  
| event text = Gas intrusion into ECCS piping required entry into Technical Specification (TS)  3.0.3.   
| event text = Gas intrusion into ECCS piping required entry into Technical Specification (TS)  3.0.3.   
Wolf Creek was operating at 100% power when gas voiding was discovered in RHR discharge piping common to both trains of ECCS.  Due to void reoccurring in excess of predetermined limits both trains of ECCS were declared inoperable at 1525 CST.  A TS required shutdown was commenced at 1622.   
Wolf Creek was operating at 100% power when gas voiding was discovered in RHR discharge piping common to both trains of ECCS.  Due to void reoccurring in excess of predetermined limits both trains of ECCS were declared inoperable at 1525 CST.  A TS required shutdown was commenced at 1622.   

Latest revision as of 21:15, 1 March 2018

ENS 43895 +/-
Where
Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Kansas (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-4.48 h-0.187 days <br />-0.0267 weeks <br />-0.00614 months <br />)
Opened: Jeff Isch
17:53 Jan 11, 2008
NRC Officer: Joe O'Hara
Last Updated: Jan 14, 2008
43895 - NRC Website
Loading map...