BECO-93-004, Forwards Proposed Relocation & Placement of Const Soil Containing Traces of Residual Radioactivity from Pilgrim Nuclear Power Station: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ . _ . _ _ . _ _ . . . _ _ . _ . .                                                   -
{{#Wiki_filter:_. _. _ _. _ _... _ _. _..
i M
M i
BOSTON EDISON Pilgrim Nuclear Power Staten Rocky Hitt Road P!ymouth, Massachusetts o230o                                                                                 1 E. Thomas Boulette, PhD Vee President Nuclear Operatons                                                                                                         January 15, 1993                     '
BOSTON EDISON Pilgrim Nuclear Power Staten Rocky Hitt Road P!ymouth, Massachusetts o230o 1
and Staton Drecter BlCo 93 004 U. S. Nuclear Regulatory Commission Document Control Desk                                                                                                                                               .
E. Thomas Boulette, PhD Vee President Nuclear Operatons January 15, 1993 and Staton Drecter BlCo 93 004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 License DPR-35 Docket 50-293 10CFR20.302(a) Approval Request for Relocation and Placement of Construction Soil with Traces of Residual Radioactivity Boston Edison Company (BEco) requests IE approval pursuant to 10CFR20.302(a) for on site relocation of approximately 79,000 ft3 of sand, -silt and rough stone containing very low levels of radioactivity'(contaminated material) as detailed in the attached report.
Washington, DC 20555 License DPR-35 Docket 50-293 10CFR20.302(a) Approval Request for Relocation and Placement of Construction Soil with Traces of Residual Radioactivity Boston Edison Company (BEco) requests IE approval pursuant to 10CFR20.302(a) for on site relocation of approximately 79,000 ft3 of sand, -silt and rough                                                                                       !
The application specifically requests
stone containing very low levels of radioactivity'(contaminated material) as                                                                                       '
(
detailed in the attached report.                                               The application specifically requests
approval to move this material from its present location inside a fenced area-r within the Pilgrim Nuclear Power Station (PNPS) contractor parking lot to a location within the PNPS site-BEco controlled area.
(                         approval to move this material from its present location inside a fenced area-                                                                                     r
i The material for relocation consists.of controlled backfill construction soil l
!                        within the Pilgrim Nuclear Power Station (PNPS) contractor parking lot to a                                                                                       '
placed during original plant construction.
;                        location within the PNPS site-BEco controlled area.                                                                                                               i The material for relocation consists.of controlled backfill construction soil l
This construction fill has traces of residual radioactivity due to the natural fall out, and plant modification and operational activities.
placed during original plant construction. This construction fill has traces of residual radioactivity due to the natural fall out, and plant modification and operational activities. After relocation, the material will be covered with topsoil and seeded to prevent erosion. The location where the material had been stored is planned for a parking lot.-
After relocation, the material will be covered with topsoil and seeded to prevent erosion.
The   attached report demonstrates that the potential radiological and i                        environmental - consequences from the proposed action are negligible, and the proposed placement of this material does not present any-environmental impact on public health and safety.                                                                                                                                       ,
The location where the material had been stored is planned for a parking lot.-
The attached report demonstrates that the potential radiological and environmental - consequences from the proposed action are negligible, and the i
proposed placement of this material does not present any-environmental impact on public health and safety.
l w!.
l w!.
tt 9
tt 9
DW9 noo.*i                                                                                                       y.W\
DW9 y.W\\
                                                                                                                                                              .0 0                           .
noo.*i
f   \
.0 0 f \\
                          $ 12 g g[ Q                           3 P                                                                                                                                                                 ;
$ 12 g g[ Q 3
  . _ , _ . . _ . _          _        _    .. , , - _ _ . - _ . . - , . . . . _ . . . . _ , _ ~ ,_ _ _..~..,_ _ . _ _ .--.. _ , _ ,.._ , ~ . _ . ..
P
..,, - _ _. - _.. -,.... _.... _, _ ~,_ _ _..~..,_ _. _ _.--.. _, _,.._, ~. _...


1                                                                                                                                                     l
1 BOSTON EDIS0N COMPANY l
!              BOSTON EDIS0N COMPANY s
2 s
l      2 V. S. Nuclear Regulatory Commission j               Page 2 j               RE0 VESTED ACTION:
V. S. Nuclear Regulatory Commission j
;              We have enclosed two (2) copies of the renort, " Relocation and Placement of                                                           ,
Page 2 j
!                Pilgrim Nuclear Power Station Construction Soil Containing Traces of Residual                                                         i
RE0 VESTED ACTION:
:                Radioactivity," for NRC review and approval. This request is for a one-time relocation of this material. We request NRC approval by April 1993 to-support removal of the material in the planned May 1993 time frame.
We have enclosed two (2) copies of the renort, " Relocation and Placement of Pilgrim Nuclear Power Station Construction Soil Containing Traces of Residual i
l 1
Radioactivity," for NRC review and approval.
                                                                  /
This request is for a one-time relocation of this material.
E. Thomas Boulette Vl k Senior'Vice President Nuclear (Acting)
We request NRC approval by April 1993 to-support l
WGL/ cab / Soil 1
removal of the material in the planned May 1993 time frame.
,                Enclosure i               cc:       Mr. R. Eaton, Project Manager
1
{                         Division of Reactor Projects - I/II j                         Office of Nuclear Reactor Regulation Mail Stop: 14D1 l
/
U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike j                         Rockville, MD 20852 i
Vl k E. Thomas Boulette Senior'Vice President Nuclear (Acting)
!                          U. S. Nuclear Regulatory Commission i                         Region I j                         475 Allendale Road
WGL/ cab / Soil 1 Enclosure i
;                          King of Prussia, PA 19406 l-                         Senior Resident Inspector
cc:
;                          Pilgrim Nuclear Power Station u
Mr. R. Eaton, Project Manager
{
Division of Reactor Projects - I/II j
Office of Nuclear Reactor Regulation Mail Stop:
14D1 l
U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike j
Rockville, MD 20852 i
U. S. Nuclear Regulatory Commission i
Region I j
475 Allendale Road King of Prussia, PA 19406 l-Senior Resident Inspector Pilgrim Nuclear Power Station u
l l
l l
l l
l l
l l
l l
l l
l l
                                          + , - .                                     .,     -.,.,,..-,,.--w.,r_,,-,a           - ,.y= < - , , , .. y +}}
,_._..-,,..,_._.m y
+, -.
_.y,.
m
-.,.,,..-,,.--w.,r_,,-,a
,.y=
y +}}

Latest revision as of 16:03, 12 December 2024

Forwards Proposed Relocation & Placement of Const Soil Containing Traces of Residual Radioactivity from Pilgrim Nuclear Power Station
ML20127K656
Person / Time
Site: Pilgrim
Issue date: 01/15/1993
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20127K659 List:
References
BECO-93-004, BECO-93-4, NUDOCS 9301260181
Download: ML20127K656 (2)


Text

_. _. _ _. _ _... _ _. _..

M i

BOSTON EDISON Pilgrim Nuclear Power Staten Rocky Hitt Road P!ymouth, Massachusetts o230o 1

E. Thomas Boulette, PhD Vee President Nuclear Operatons January 15, 1993 and Staton Drecter BlCo 93 004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 License DPR-35 Docket 50-293 10CFR20.302(a) Approval Request for Relocation and Placement of Construction Soil with Traces of Residual Radioactivity Boston Edison Company (BEco) requests IE approval pursuant to 10CFR20.302(a) for on site relocation of approximately 79,000 ft3 of sand, -silt and rough stone containing very low levels of radioactivity'(contaminated material) as detailed in the attached report.

The application specifically requests

(

approval to move this material from its present location inside a fenced area-r within the Pilgrim Nuclear Power Station (PNPS) contractor parking lot to a location within the PNPS site-BEco controlled area.

i The material for relocation consists.of controlled backfill construction soil l

placed during original plant construction.

This construction fill has traces of residual radioactivity due to the natural fall out, and plant modification and operational activities.

After relocation, the material will be covered with topsoil and seeded to prevent erosion.

The location where the material had been stored is planned for a parking lot.-

The attached report demonstrates that the potential radiological and environmental - consequences from the proposed action are negligible, and the i

proposed placement of this material does not present any-environmental impact on public health and safety.

l w!.

tt 9

DW9 y.W\\

noo.*i

.0 0 f \\

$ 12 g g[ Q 3

P

..,, - _ _. - _.. -,.... _.... _, _ ~,_ _ _..~..,_ _. _ _.--.. _, _,.._, ~. _...

1 BOSTON EDIS0N COMPANY l

2 s

V. S. Nuclear Regulatory Commission j

Page 2 j

RE0 VESTED ACTION:

We have enclosed two (2) copies of the renort, " Relocation and Placement of Pilgrim Nuclear Power Station Construction Soil Containing Traces of Residual i

Radioactivity," for NRC review and approval.

This request is for a one-time relocation of this material.

We request NRC approval by April 1993 to-support l

removal of the material in the planned May 1993 time frame.

1

/

Vl k E. Thomas Boulette Senior'Vice President Nuclear (Acting)

WGL/ cab / Soil 1 Enclosure i

cc:

Mr. R. Eaton, Project Manager

{

Division of Reactor Projects - I/II j

Office of Nuclear Reactor Regulation Mail Stop:

14D1 l

U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike j

Rockville, MD 20852 i

U. S. Nuclear Regulatory Commission i

Region I j

475 Allendale Road King of Prussia, PA 19406 l-Senior Resident Inspector Pilgrim Nuclear Power Station u

l l

l l

l l

l l

,_._..-,,..,_._.m y

+, -.

_.y,.

m

-.,.,,..-,,.--w.,r_,,-,a

,.y=

y +