ENS 43964: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 02/06/2008 11:33 CST | | event date = 02/06/2008 11:33 CST | ||
| last update date = 02/09/2008 | | last update date = 02/09/2008 | ||
| title = Flood Watch Due | | title = Flood Watch Due to Snow Melt and Heavy Rain | ||
| event text = On February 6, 2008 at 1119 hours, Clinton Lake level reached 694 feet 0 inches (mean sea level). Normal lake level is 690 feet 0 inches. Per Clinton Power Station (CPS) procedure 4303.02, 'Abnormal Lake Level,' the CPS Main Dam - Emergency Action Plan requires that a 'Flood Watch' be declared. This resulted in a notification to the DeWitt County Sheriff's Department that occurred at 1133 hours. Lake level continues to slowly rise due to the melting snow and heavy rains received in the area for the past several days. Expected peak is approximately 694 feet 6 inches. Mitigating measures are currently being instituted as a precautionary measure in the screen house, per CPS procedures. | | event text = On February 6, 2008 at 1119 hours, Clinton Lake level reached 694 feet 0 inches (mean sea level). Normal lake level is 690 feet 0 inches. Per Clinton Power Station (CPS) procedure 4303.02, 'Abnormal Lake Level,' the CPS Main Dam - Emergency Action Plan requires that a 'Flood Watch' be declared. This resulted in a notification to the DeWitt County Sheriff's Department that occurred at 1133 hours. Lake level continues to slowly rise due to the melting snow and heavy rains received in the area for the past several days. Expected peak is approximately 694 feet 6 inches. Mitigating measures are currently being instituted as a precautionary measure in the screen house, per CPS procedures. | ||
The NRC Resident has been notified. | The NRC Resident has been notified. |
Latest revision as of 22:15, 1 March 2018
Where | |
---|---|
Clinton ![]() Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
Time - Person (Reporting Time:+-4.62 h-0.193 days <br />-0.0275 weeks <br />-0.00633 months <br />) | |
Opened: | Dale Shelton 12:56 Feb 6, 2008 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Feb 9, 2008 |
43964 - NRC Website
| |