ENS 43964: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 02/06/2008 11:33 CST
| event date = 02/06/2008 11:33 CST
| last update date = 02/09/2008
| last update date = 02/09/2008
| title = Flood Watch Due To Snow Melt And Heavy Rain
| title = Flood Watch Due to Snow Melt and Heavy Rain
| event text = On February 6, 2008 at 1119 hours, Clinton Lake level reached 694 feet 0 inches (mean sea level).  Normal lake level is 690 feet 0 inches.  Per Clinton Power Station (CPS) procedure 4303.02, 'Abnormal Lake Level,' the CPS Main Dam - Emergency Action Plan requires that a 'Flood Watch' be declared.  This resulted in a notification to the DeWitt County Sheriff's Department that occurred at 1133 hours.  Lake level continues to slowly rise due to the melting snow and heavy rains received in the area for the past several days.  Expected peak is approximately 694 feet 6 inches.  Mitigating measures are currently being instituted as a precautionary measure in the screen house, per CPS procedures.
| event text = On February 6, 2008 at 1119 hours, Clinton Lake level reached 694 feet 0 inches (mean sea level).  Normal lake level is 690 feet 0 inches.  Per Clinton Power Station (CPS) procedure 4303.02, 'Abnormal Lake Level,' the CPS Main Dam - Emergency Action Plan requires that a 'Flood Watch' be declared.  This resulted in a notification to the DeWitt County Sheriff's Department that occurred at 1133 hours.  Lake level continues to slowly rise due to the melting snow and heavy rains received in the area for the past several days.  Expected peak is approximately 694 feet 6 inches.  Mitigating measures are currently being instituted as a precautionary measure in the screen house, per CPS procedures.
The NRC Resident has been notified.
The NRC Resident has been notified.

Latest revision as of 22:15, 1 March 2018

ENS 43964 +/-
Where
Clinton Constellation icon.png
Illinois (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-4.62 h-0.193 days <br />-0.0275 weeks <br />-0.00633 months <br />)
Opened: Dale Shelton
12:56 Feb 6, 2008
NRC Officer: Mark Abramovitz
Last Updated: Feb 9, 2008
43964 - NRC Website
Loading map...