| event date = 01/14/2009 14:30 CST
| event date = 01/14/2009 14:30 CST
| last update date = 01/14/2009
| last update date = 01/14/2009
| title = Controlled Shutdown For Feedwater Heater Repairs
| title = Controlled Shutdown for Feedwater Heater Repairs
| event text = Unit 2 performed a controlled shutdown from 60% power to make repairs to a low pressure feedwater heater.  The unit was taken off line at 1148 today. The unit is stable in Mode 3, Hot Standby.  A press release was made at 1430 today.
| event text = Unit 2 performed a controlled shutdown from 60% power to make repairs to a low pressure feedwater heater.  The unit was taken off line at 1148 today. The unit is stable in Mode 3, Hot Standby.  A press release was made at 1430 today.
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.

Latest revision as of 21:12, 1 March 2018

ENS 44775 +/-
Where
Arkansas Nuclear Entergy icon.png
Arkansas (NRC Region 4)
Reporting
Information Only
Time - Person (Reporting Time:+-3.73 h-0.155 days <br />-0.0222 weeks <br />-0.00511 months <br />)
Opened: James Crabill
16:46 Jan 14, 2009
NRC Officer: Pete Snyder
Last Updated: Jan 14, 2009