ENS 45362: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 09/18/2009 14:50 CDT
| event date = 09/18/2009 14:50 CDT
| last update date = 09/18/2009
| last update date = 09/18/2009
| title = Fitness For Duty - Non-Disclosure Of Information By A Non-Licensed Contractor
| title = Fitness for Duty - Non-Disclosure of Information by a Non-Licensed Contractor
| event text = A non-licensed contractor failed to report derogatory information to the licensee at the time of processing.  Upon discovery of the discrepancy, the contractor's plant access was terminated.  Contact the Headquarters Operations Officer for additional details.
| event text = A non-licensed contractor failed to report derogatory information to the licensee at the time of processing.  Upon discovery of the discrepancy, the contractor's plant access was terminated.  Contact the Headquarters Operations Officer for additional details.
The licensee has notified the NRC Resident Inspector.
The licensee has notified the NRC Resident Inspector.

Latest revision as of 21:11, 1 March 2018

ENS 45362 +/-
Where
Clinton Constellation icon.png
Illinois (NRC Region 3)
Reporting
10 CFR 26.719, FFD Reporting Requirements
LER: 05000461/LER-2009-002
Time - Person (Reporting Time:+-3.2 h-0.133 days <br />-0.019 weeks <br />-0.00438 months <br />)
Opened: Richard Kiss
16:38 Sep 18, 2009
NRC Officer: Vince Klco
Last Updated: Sep 18, 2009
45362 - NRC Website
Loading map...