| event date = 12/01/2009 12:00 EST
| event date = 12/01/2009 12:00 EST
| last update date = 12/03/2009
| last update date = 12/03/2009
| title = Ipcs System Oos For Security Modification
| title = Ipcs System Oos for Security Modification
| event text = Beginning December 1,2009, at approximately 1200, the Fermi 2 Integrated Plant Computer System (IPCS) will be removed from service to support installation of a Cyber Security Modification.  The Safety Parameters Display System (SPDS) and Emergency Response Data System (ERDS) reside on the PCS platform and will be out of service when the PCS is removed from service.  These systems will be unavailable to the Control Room and all other Emergency Response Facilities (ERFs) for approximately six hours.  By 1800, it is planned to restore IPCS, including SPDS and ERDS, to the Control Room, Operational Support Center, and the Technical Support Center.  The IPCS will remain unavailable to the Emergency Operations Facility (EOF) as well as alternate EOF. On December 2, at approximately 1600, IPCS will be restored to the EOF but will remain unavailable to the alternate facilities.  On December 3, 2009, at approximately 1600, IPCS will be restored, including alternate facilities.
| event text = Beginning December 1,2009, at approximately 1200, the Fermi 2 Integrated Plant Computer System (IPCS) will be removed from service to support installation of a Cyber Security Modification.  The Safety Parameters Display System (SPDS) and Emergency Response Data System (ERDS) reside on the PCS platform and will be out of service when the PCS is removed from service.  These systems will be unavailable to the Control Room and all other Emergency Response Facilities (ERFs) for approximately six hours.  By 1800, it is planned to restore IPCS, including SPDS and ERDS, to the Control Room, Operational Support Center, and the Technical Support Center.  The IPCS will remain unavailable to the Emergency Operations Facility (EOF) as well as alternate EOF. On December 2, at approximately 1600, IPCS will be restored to the EOF but will remain unavailable to the alternate facilities.  On December 3, 2009, at approximately 1600, IPCS will be restored, including alternate facilities.
During this entire duration dose assessment capability will only be available in the manual data input mode.  A follow-up notification will be submitted when the PCS is completely restored.  For the first six hours of the PCS outage, the emergency assessment capability of all Fermi 2 ERFs will be degraded by the loss of IPCS and SPDS.  During this period the ERDS function will also be lost. For the following 24 hrs., the EOF will have no IPCSs capability, which includes the SPDS function.  Based on the aggregate effect of these losses, this notification is being made per the requirements of 8 Hour Non-Emergency Notification 10CFR,50.72(b)(3)(xiii), any event that results in a major loss of emergency assessment capability.
During this entire duration dose assessment capability will only be available in the manual data input mode.  A follow-up notification will be submitted when the PCS is completely restored.  For the first six hours of the PCS outage, the emergency assessment capability of all Fermi 2 ERFs will be degraded by the loss of IPCS and SPDS.  During this period the ERDS function will also be lost. For the following 24 hrs., the EOF will have no IPCSs capability, which includes the SPDS function.  Based on the aggregate effect of these losses, this notification is being made per the requirements of 8 Hour Non-Emergency Notification 10CFR,50.72(b)(3)(xiii), any event that results in a major loss of emergency assessment capability.

Latest revision as of 21:10, 1 March 2018

ENS 45530 +/-
Where
Fermi DTE Energy icon.png
Michigan (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-5.87 h-0.245 days <br />-0.0349 weeks <br />-0.00804 months <br />)
Opened: Robert Matuszak
11:08 Dec 1, 2009
NRC Officer: Charles Teal
Last Updated: Dec 3, 2009